Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARNL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML20028D3802020-01-13013 January 2020 10CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17333A3792017-11-21021 November 2017 Engine Systems, Inc. 10 CFR 21 Reportable Notification on a Power Supply (P/N 2938604) ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML11251A1982011-09-0606 September 2011 Notification Under 10 CFR Part 21 on Certain Rosemount Model 1153 Series B, 1164 and 1154 Series H Pressure Transmitters, May Not Perform Their Intended Safety Function ML1108400372011-03-23023 March 2011 Notification of Potential Part 21 Report Concerning Valve Plunger Guide Malfunction ML1031304232010-11-0808 November 2010 Notification of Potential Part 21 from Curtiss Wright Flow Control Co., on UPS Motherboard Failed Pre-Service Inspection ML1016001892010-06-0404 June 2010 Notification of Potential Part 21 on Final Report Dresser-Rand No. 042 ML1013803972010-05-13013 May 2010 Part 21 Report - Lugs on Digital Filter Improperly Soldered ML1004700232010-02-0101 February 2010 Title 10 Code of Federal Regulation Part 21 Notification: Service Water Pump (2E) Failure at Farley Nuclear Station ML1002903682010-01-27027 January 2010 Sulzer Pumps, Inc. Part 21 Report (Event #45666) Re Defect in Pump Shaft Journal Coating Caused Service Water Pump (2E) Failure at Farley Nuclear Station ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0903300562009-01-27027 January 2009 Notification of Potential Part 21 Report from Fisher Controls International, Part Not Evaluated for All Critical Characteristics ML0833301872008-11-21021 November 2008 Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012 ML0828403842008-10-0303 October 2008 10 CFR Part 21 Reporting Thread Sealant Issue ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches NL-07-1959, 10 CFR 21 Report, Notification of Potential Defect Associated with Areva Model MA-VR-350 4160 V Circuit Breakers2007-11-14014 November 2007 10 CFR 21 Report, Notification of Potential Defect Associated with Areva Model MA-VR-350 4160 V Circuit Breakers ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0710101252007-04-0909 April 2007 Fairbanks Morse Engine, Part 21 Notification - Diesel Cam Roller Bushing Failures ML0710002292007-04-0606 April 2007 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters ML0706802882007-03-0707 March 2007 Notification of Potential Part 21 on Defect in E7000 Relays ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0614300172006-05-20020 May 2006 Sulzer Pumps (Us), Inc. Is Reporting Deviation from Technical Requirements for Components to Be Used in Nuclear Safety Related Applications ML0536403292005-12-28028 December 2005 Notification of Deficiency Report (10 CFR Part 21) for Rosemount Nuclear Instruments Transmitters ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 ML0501102232005-01-0707 January 2005 Non-Emergency Event Report, Overstress Condition on Single Failure Proof Crane Trolleys ML0312001162003-04-21021 April 2003 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR 21-0086, Rev. 0 ML0215102952002-05-15015 May 2002 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems ML0215502492002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems 2023-12-15
[Table view] |
Text
0112712009 U.S. NuclearRegulatory Commission Operations Center Event Report Paze I General Information or Other (PAR) Event# 44809 Rep Org: FISHER CONTROLS INTERNATIONAL Notification Date / Time: 01/27/2009 17:11 (EST)
Supplier: FISHER CONTROLS INTERNATIONAL Event Date / Time: 01/27/2009 (CST)
Last Modification: 01/27/2009 Region: 3 Docket #:
City: MARSHALLTOWN Agreement State: Yes County: License #:
State: IA NRC Notified by: MATTHEW FARRELL Notifications: WAYNE SCHMIDT R1 HQ Ops Officer: HOWIE CROUCH GERALD MCCOY R2 Emergency Class: NON EMERGENCY PATTY PELKE R3 10 CFR Section: CHUCK CAIN R4 21.21 UNSPECIFIED PARAGRAPH TOM HERRITY NRR OMID TABATABAI NRO PART 21 REPORT - PART NOT EVALUATED FOR ALL CRITICAL CHARACTERISTICS The following information was obtained from Fisher Controls International via facsimile:
The equipment supplied included a 20" Fisher valve coupled to a Bettis actuator.
"The purpose of this Fisher Information Notice (FIN 2009-03) is to alert Alabama Power that as of January 16, 2009, Fisher Controls International LLC became aware of the possibility of a situation which may affect the performance of the applicable equipment.
"This notice applies only to the subject equipment supplied by Fisher Controls International LLC, identified above, that was provided to Alabama Power- Farley.
"Fisher Controls has determined that the subject. items were provided with parts that were not properly processed per active valve requirements specified by the Alabama Power Order.
"Specifically, Fisher provided a coupler between the actuator drive lever and valve shaft that was not evaluated for all the critical characteristics deemed necessary for a commercial grade dedicated item per EPRI 5652 and Fisher Manufacturing Procedure FMP 2K27, 'Control of Commercial Grade Items to be Dedicated for Use in Nuclear Safety-Related Systems', (Fisher Processing Level C).
"We [Fisher Controls] are reviewing the situation and will pursue a corrective action investigation to prevent problems like this in the future.
"Arrangements have been made with Alabama Power to retrofit a correctly processed part on the subject serial AJg
01/27/2009 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Paze, General Information or Other (PAR) Event # 44809 number.
"This is a formal notification; Alabama Power Was notified of this situation on January 16, 2008."
The coupling provided to Alabama Power did not meet the hardness requirements specified in the order. The coupler provided was annealed versus, quench-hardened.
Jan,27, 2009 4:10PM No, 02 13 P- 6 EMERSON.. Fisher Controls International LLC 2 O("!
. r R,y,;al"l() Jc 'li; 301 South First Ave.
P.O. Box 190 Marshalltown, Iowa 50158-0190 USA T (641) 754-3011 F (641) 754-2830 Fisher Information Notice: FIN 2009-03 January 23, 2008 Subiect: Fisher Order 025-N580208249 for Alabama Power - Farley From:
Bill Fitzgerald Nuclear Business Unit Vice President Fisher Controls International LLC 205 South Center Street Marshalltown, IA 50158 Fax: (641) 754-2854 Equipment Affected By This Information Notice:
Items provided to Alabama Powerper FisherOrder Number 025-N580208249, Item 0004 (Alabama Power Order QP0709231007), This equipment included a 20" CL150 FisherV150 valve assembly with Bettis NT420-SR1-CCW-M3HW actuator, The equipment is identified by FisherSerial Number 18406554 (FarleyTag Number Q2P16FV3009A).
Purpose:
The purpose of this Fisher Information Notice (FIN) is to alert Alabama Power that as of January 16, 2009, Fisher Controls International LLC became aware of the possibility of a situation which may affect the performance of the applicable equipment.
We are informing you of this circumstance in accordance with Section 21.21 (b) of 10CFR21.
Applicability:
This notice applies only to the subject equipment supplied by Fisher Controls International LLC, identified above, that was provided to Alabama Power - Farley.
Page 1 of 2 0
. Jan. 27. 2009 4:10PM No, 0213 P- 7 Fisher Information Notice: FIN 2009-03 Discussion:
Fisher Controls has determined that the subject items were provided with parts that were not properly processed per active valve requirements specified by the Alabama Power Order QP070923/007.
Specifically, Fisher provided a coupler between the actuator drive lever and valve shaft that was not evaluated for all the critical characteristics deemed necessary for a commercial grade dedicated item per EPRI 5652 and Fisher Manufacturing Procedure FMP 2K27, "Control of Commercial Grade Items to be Dedicated for Use in Nuclear Safety-Related Systems", (Fisher Processing Level C).
We are reviewing the situation and will pursue a corrective action investigation to prevent problems like this in the future.
Arrangements have been made with Alabama Power to retrofit a correctly processed part on the subject serial number.
This is a formal notification; Alabama Power was notified of this situation on January 16, 2008.
Action Required No action is required.
10CFR21 Implications:
Fisher Controls requests that the recipient of this notice review it and take appropriate action in accordance with I OCFR21.
If there are any technical questions or concerns, please contact:
Michael Wedemeyer Manager, Quality Fisher Controls International LLC 205 South Center Street Marshalltown, IA 50158 Fax: (641) 754-2854 Phone: (641) 745-2066 Michael.Wedemeyer@hEmerson.com Page 2 of 2