INDIANA MICHIGAN POWER Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106 aep.com AEP-NRC-2009-9 10 CFR 26.717 January 19, 2009 Docket Nos.:

50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 10 CFR PART 26, FITNESS FOR DUTY PROGRAMS In accordance with 10 CFR 26.717, Indiana Michigan Power Company hereby submits Fitness for Duty Program performance data for the six-month period of July 1, 2008, to December 31, 2008.

Attached are the performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted, random testing rate, and a summary of management actions.

In accordance with 10 CFR Part 26, Fitness for Duty Programs, Final Rule, dated March 31, 2008, future performance data will be submitted on an annual basis.

This letter,jcontainsno.new, or revised commitments.

Should you have any questions, please.

contactMr. John,*A zw'ovlinski, Regulatory Affairs Manager, at (269) 466-2478.

Sincerely, Services Vice President SLAB/rdw Attachment c:

T. A. Beltz, NRC Washington, DC J. L. Caldwell, NRC Region III K. D. Curry, AEP Ft. Wayne J. T.,King, MPSC

, MDEQ - WHMD/RPS.-.

NRC Resident Inspector R.

f I i ;j

q i*.,,i**

Attachment to AEP-NRC-2009-9 Page 1 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Indiana Michigan Power Co.

Company Cook Nuclear Plant, Bridgman, Michigan Location Herb Torberg Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Marijuana 50/15 Amphetamine Cocaine 300/150 Phencyclidine Opiates 300/300 Alcohol (%BAC) 12/31/08 6 Month Ending (269) 466-2751 Phone z Appendix Ato 10CFR26 1000/500 N/A N/A 25/25 N/A N/A 0.04%

N/A N/A Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with Unescorted 1086 168 586 Access

  1. Tested
  1. Positive
  1. Tested
  1. Positive
  1. Tested
  1. Positive Categories Pre-Access 103 0

12 0

922 21 For-Cause 5

0 3

0 17 0

Post Accident For-Cause 7

0 2

0 1

0 Observed Behavior Random 288 1

38 0

136 0

Follow-Up 18 1

5 0

23 0

Other 1

0 20 0

0 0

Total 422 2

80 0

1099 21

Attachment to AEP-NRC-2009-9 Page 2 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Amphetamines Phencyclidene Alcohol Refusal Marijuana Adulterated 50 100 To Test Suspect Specimen ng/ml ng/ml Specimen Licensee 0

0 0

0 0

0 1

0 1

0 Employee Long-Term 0

0 0

0 0

0 0

0 0

0 Contractors Short-Term 3

6 5

0 0

0 2

1 7

0 Contractors Total 3

6 5

0 0

0 3

1 8

0 Total Confirmed Positive Tests for All Specific Substances, Refusals to Test, and Adulterated Specimens: 26 APPEALS: Six appeals were received during this reporting period; in these appeals the denials were upheld.

EVENTS:

There was one event identified as 24-hour reportable in accordance with 10 CFR 26.73 during this reporting period.

TEMPORARY SUSPENSIONS:

No temporary suspensions or administrative actions were taken against individuals based on on-site presumptive positive drug results.

TESTING RATE:

The random testing rate for the second half of 2008 was 48% of the (half-year) average total population.