1CAN010901, License Amendment Request Supplemental Regarding Technical Specification Changes for Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process

From kanterella
(Redirected from ML090130124)
Jump to navigation Jump to search

License Amendment Request Supplemental Regarding Technical Specification Changes for Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process
ML090130124
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/12/2009
From: Mitchell T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1CAN010901, TAC MD7177
Download: ML090130124 (6)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Timothy G. Mitchell Vice President, Operations Arkansas Nuclear One 1CAN010901 January 12, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

License Amendment Request Supplemental Regarding Technical Specification Changes for Control Room Envelope Habitability in Accordance With TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51

REFERENCE:

1. Entergy letter to NRC dated October 22, 2007, Technical Specification Changes For Control Room Envelope Habitability in Accordance With TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (1CAN100704) (TAC No. MD7177)

Dear Sir or Madam:

In accordance with the provisions of 10 CFR 50.90, Entergy Operations, Inc. (Entergy) submitted a request for an amendment (Reference 1) to the Technical Specifications (TS) for Arkansas Nuclear One, Unit 1 (ANO-1). The proposed amendment would modify TS requirements related to control room envelope (CRE) habitability in accordance with Technical Specification Task Force (TSTF)-448, Revision 3, using the consolidated line item improvement process (CLIIP).

In the original letter (Reference 1), Entergy proposed to control the first performance of CRE tests adopted via TSTF-448 by regulatory commitment. However, The NRC notified Entergy in late December 2008 that the first performance of CRE testing must be controlled in the Operating License. Therefore, Entergy proposes to delete commitments contained in its original letter (Reference 1) associated with the first performance of CRE testing and add a new ANO-1 Operating License condition 2.c.(10) to capture the requirements for the first performance of these tests. A markup of the affected Operating License page is included in . Note that the markup refers to an Amendment xxx, where xxx represents the Amendment number approving the adoption of TSTF-448 for ANO-1.

1CAN010901 Page 2 of 2 contains a revised List of Regulatory Commitments.

The adoption of Operating License requirements for the first performance of CRE testing and the revision to the List of Regulatory Commitments table do not invalidate the No Significant Hazards Considerations associated with the original ANO-1 submittal (Reference 1).

If you have any questions or require additional information, please contact Dale James at 479-858-4619.

I declare under penalty of perjury under the laws of the United States of America that I am authorized by Entergy to make this request and that the foregoing is true and correct.

Executed on January 12, 2009.

Sincerely, TGM/dbb

Attachment:

1. ANO-1 Operating License Markup Page
2. Revised List of Regulatory Commitments cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Alan B. Wang MS O-7 D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205

Attachment 1 To 1CAN010901 ANO-1 Operating License Markup Page

(10) Upon implementation of Amendment xxx adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by SR 3.7.9.6, in accordance with Specifications 5.5.5.c.(i),

5.5.5.c.(ii), and 5.5.5.d, shall be considered met. Following implementation:

1. The first performance of SR 3.7.9.6, in accordance with Specification 5.5.5.c.(i), shall be within 15 months of the approval of TSTF-448. SR 3.0.2 will not be applicable to this first performance.
2. The first performance of the periodic assessment of CRE habitability, Specification 5.5.5.c.(ii), shall be within 15 months of the approval of TSTF-448. SR 3.0.2 will not be applicable to this first performance.
3. The first performance of the periodic measurement of CRE pressure, Specification 5.5.5.d, shall be within 15 months of the approval of TSTF-448. SR 3.0.2 will not be applicable to this first performance.
3. This renewed license is effective as of the date of issuance and shall expire at midnight, May 20, 2034.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by:

Jon R. Johnson Jon R. Johnson, Acting Director Office of Nuclear Reactor Regulation

Attachment:

Appendix A - Technical Specifications and Technical Specifications Bases (ML011710071 and ML011710100)

Date of Issuance: June 20, 2001 Renewed License No. DPR-51 Amendment No.

Revised by letter dated July 18, 2007

Attachment 2 To 1CAN010901 Revised List of Regulatory Commitments to 1CAN010901 Page 1 of 1 Revised List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check one) SCHEDULED COMPLETION COMMITMENT DATE (If Required)

ONE-TIME CONTINUING ACTION COMPLIANCE Entergy will establish the Technical X To be Specification (TS) Bases for TS 3.7.9, implemented consistent with TSTF 448, Revision 3, as with adopted with the applicable license amendment amendment.