Ltr. 01/05/09 Monticello Request for Information
ML090050453
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/05/2009
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: O'Connor T
Northern States Power Co
References
Download: ML090050453 (6)


Text

January 5, 2009 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT REQUEST FOR INFORMATION FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Dear Mr. OConnor:

On March 23, 2009, the NRC will begin a Post-Approval Site Inspection for License Renewal. A team of two inspectors will perform this 2-week inspection. This inspection will be performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus on outage related activities to verify that license conditions added as part of your renewed license and a sample of license renewal commitments have been implemented.

In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups:

The first group lists information necessary for our initial inspection scoping and in-office preparation activities. During the in-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. This information should be provided to the lead inspector by March 2, 2009.

The second group includes the additional information required for the team to review the selected activities. This information should be available to the team on-site March 23, 2009.

It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing contact for this inspection is Mr. Tim Blake of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727 or via e-mail at stuart.sheldon@nrc.gov.

T. OConnor In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22

Enclosure:

Request for Information, Post-Approval Site Inspection for License Renewal cc w/encl:

D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.

J. Stine, State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office

T. OConnor In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-263 License No. DPR-22

Enclosure:

Inspection Report 05000263/2009-006(DRS) w/

Attachment:

Supplemental Information cc w/encl:

D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.

J. Stine, State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office DOCUMENT NAME:G:\\DRS\\Work in Progress\\Ltr. 12__08 Monticello 71003 RFI SNS.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SSheldon:ls AMStone DATE 01/05/08 01/05/08 OFFICIAL RECORD COPY

Letter to Mr. Timothy J. OConnor from Ms. Ann Marie Stone dated January 5, 2008.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT REQUEST FOR INFORMATION FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMMonticello RidsNrrDirsIrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn Gary Shear DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov

INFORMATION REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL OUTAGE PORTION Inspection Report: 05000263/2009006(DRS)

Inspection Dates:

March 23, 2009 - April 3, 2009 Inspection Procedure:

IP 71003 Post-Approval Site Inspection for License Renewal Lead Inspector:

Stuart Sheldon, Lead Inspector (630) 829-9727 stuart.sheldon@nrc.gov I.

Information Requested Prior to the On-site Inspection Week The following information is requested by March 2, 2009, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).

1.

Provide a list of your license renewal commitments with an approximate completion status of each.

2.

Provide a list of your Aging Management Programs (AMPs), copies of the program basis documents for each, and a listing of the action tracking items for each.

3.

For AMPS that are one-time inspection programs, provide a list of completed work order numbers for inspections that have been completed. This may be incorporated with the previous item and should include identification of the inspected component.

4.

Provide a list of the one-time inspections credited for license renewal that will be completed during your outage. This list should include at least the system, component, work order number, and type of inspection.

5.

Provide a listing of planned inspections which will be conducted during the outage, credited for license renewal, that provide observations of areas that are generally inaccessible at power, (e.g., drywell liner and containment coating inspections). Include work order numbers where applicable.

6.

Provide an outage schedule, sufficiently detailed as to list the work orders noted in items 4 and 5.

INFORMATION REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL OUTAGE PORTION

7.

Provide current management and license renewal organizational charts.

8.

Provide electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual.

9.

Provide copies of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.

II.

Information requested to be available when the inspectors arrive on-site on March 23, 2009.

1.

Copies of the work orders requested during the preparation week. This will include work orders of inspections to be observed and completed work orders to be reviewed by the team.

2.

Contact information for the Outage Control Center to facilitate inspector observation of the selected work orders.

3.

Documentation demonstrating completion of license renewal commitments that are complete as of the inspection date. For example, this may be in the form of a binder for each commitment which includes the implementing documentation and references.

III.

Information Requested to be provided throughout the inspection

1.

Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.