Lr Hearing - Indian Point SFP and Refueling Cavity
ML083580193
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/01/2008
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML083580193 (2)


Text

IPRenewal NPEmails From: John Boska Sent: Monday, December 01, 2008 3:04 PM To: Bryce Lehman

Subject:

Indian Point SFP and refueling cavity The spent fuel pool is in UFSAR sect. 1.2. For unit 3, it is plant drawing 9321-F-25143. Unit 2 removed the drawing (9321-F-2514) from the UFSAR for security reasons.

The refueling cavity is shown on the containment drawings, UFSAR sect 5.1 for both units. For unit 3 the drawings are 9321-F-25013, 25023, and 25073. For Unit 2 they are 2501, 2502, and 2507.

I have paper copies (in a 3 ring binder, not very good) if you wish to look at those.

John Boska Indian Point Project Manager, DORL U.S. Nuclear Regulatory Commission 301-415-2901 email: john.boska@nrc.gov 1

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 944 Mail Envelope Properties (5A7F273F3E481245BC055B36939D34630C4BE05D8C)

Subject:

Indian Point SFP and refueling cavity Sent Date: 12/1/2008 3:04:10 PM Received Date: 12/1/2008 3:04:23 PM From: John Boska Created By: John.Boska@nrc.gov Recipients:

"Bryce Lehman" <Bryce.Lehman@nrc.gov>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 580 12/1/2008 3:04:23 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: