UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 18, 2008 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO PROPOSED EMERGENCY PLAN CHANGE (TAC NO. MD8669)
Dear Sir or Madam:
By letter dated April 28, 2008 (non-public), to the U.S. Nuclear Regulatory Commission (NRC),
Entergy Operations, Inc., submitted a request for changes to the Emergency Plan for Grand Gulf Nuclear Station, Unit 1. The request was to allow the Repair and Corrective Action on-shift Electrical, Mechanical, and Instrumentation and Controls Maintenance functions to be performed by shift personnel assigned other duties.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosure to this letter and was discussed with Mr. M. Larson, et al., of your staff on December 11, 2008. Please provide a response by February 20, 2009, to this request for additional information.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at fred.lyon@nrc.gov.
Sincerely, Carl. F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION (RAI)
ENTERGY OPERATIONS, INC.
GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416 By letter dated April 28, 2008 (non-public), Entergy Operations, Inc., submitted a request for changes to the Emergency Plan (EP) for Grand Gulf Nuclear Station, Unit 1. The NRC staff has determined that the following additional information is required in order to complete its evaluation.
RAI#
SECTION Question 1
1.0/2.0 C1 Proposal states, "These attachments can also be performed by Operations personnel specifically training to perform these functions."
C1 Repair and Corrective Actions states, "These tasks will be performed by task trained non-licensed and licensed operators."
C1 Conclusion states, "This change is acceptable since the tasks performed by the Mechanical and Electrical maintenance personnel can be performed by Operations personnel who will be trained and qualified to perform the tasks."
C2 Justification for Change states, "These attachments will not reqUire any I&C [Instrumentation and Controls] maintenance personnel since specifically trained Operations personnel will perform these functions."
C2 Conclusion states, This change is acceptable since the tasks performed by the I&C maintenance personnel can be performed by Operations personnel who will be trained and qualified to perform the tasks."
2.0 Basis for Effectiveness of Change states, "For the Repair and Corrective Action Function, there was no loss in effectiveness since on-shift Operations personnel can perform these tasks with additional training on performance of proceduralized tasks in Emergency Procedure 05-S-01-EP-1."
- 1.
Provide copies of training/plant documents that provide this "specific training" to the Operations personnel including lesson plans, any procedures that specifically require this training, any procedures that specifically require requalification training, and any associated job performance measures.
- 2.
By what commitment would this training be completed prior to implementing these changes in shift staffing and what commitment would be made to continue this training?
- 3.
Provide current revisions of 05-S-01-EP-1, Emergency/Severe Accident Procedure Support Document and 01-S-10.6, Emergency Response Organization (ERO).
Enclosure
- 2 RAI#
SECTION Question 2
4.0 Table 4-1 shows Current Operator Shift Staffing with a minimum of 12 Operators on shift "A." Table 5-1 lists 9 Operators committed for on-shift staffing.
- 1.
Explain what role/function these committed on-shift staff would have for Operations, ERO/EP and Fire Brigade. Please supply this information in a structured (e.g., tabular) format.
- a.
Explain what role/function these committed on-shift staff would need to take during an event that would entail the following:
responding to an event that would require simultaneous Operations, ERO/EP, and Fire Brigade support, performing Dose assessment, Emergency Classifications, and resultant notifications to State and local response organizations, and the NRC.
- 2.
Section 2.0 states that "overstaffing (See Section 4.0 for shift staffing numbers)...provide assurance that these functions can be performed at all times." How does the shift staffing provided in Table 5-1 provide this assurance?
Section 4.0 states, "As indicated by the numbers shown in Table 4-1 and 4-2, shift staffing is higher than our committed on-shift staffing numbers as indicated in the Grand Gulf Technical Requirements manual and Technical Specifications. Overstaffing of shift personnel beyond NUREG 0654, Table B-1 requirements provides assurance that all of the functions listed in the proposed Table 5-1 will be performed as required by the Emergency Plan and ensures 10CFR50.47 compliance."
- 1.
How does the shift staffing listed in Table 5-1 provide assurance that all of the functions listed in the proposed Table 5-1 will be performed as required by the Emergency Plan and ensure compliance with 10 CFR 50.47?
- 2.
How are the staffing levels listed in Table 4-1 maintained to provide future assurance that all of the functions listed in the proposed Table 5-1 will be performed as required by the Emergency Plan and ensure compliance with 10 CFR 50.477 3
4.0
- 3 RAI#
4 I
SECTION GENERAL Question Pursuant to the prior submittal and approval of the Grand Gulf Emergency Plan in September 2000, in correspondence GNRO-2000/00021, letter dated April 6, 2000 (non-public), Page 3 of 11, Paragraph 1, the licensee stated, in part, "To offset any potential decrease in emergency capability associated with the increased augmentation and facility fully operational times, specific on-shift staffing or capabilities...will be increased. Specifically the following Table 5-1 Emergency Tasks and Emergency Plan changes support this increase in times:
...[Bullet 3] Committing to increase the on-shift I&C staffing from zero to one;
...[Bullet 4] - Deleting footnote denoting mechanical and electrical maintenance as a shared function thus increasing onshift staffing in these areas by one each."
In addition, in correspondence GNRO-2000/00021, letter dated April 6, 2000, Page 6 of 11, Paragraph 1, the licensee stated, in part, "This overstaffing of operations shift personnel along with other onshift ERO personnel (chemistry, maintenance, and radiation protection) prOVides assurance that all of the functions listed in the proposed Table 5-1 will be performed as required by the Emergency Plan. This ability to perform all required emergency functions at all times offsets any delays such as the 75 minute augmentation time of TSC [Technical Support Center] personnel and the 90 minute facility fully operational time."
- 1.
The requested reduction in the Repair and Corrective Action function, Electrical, Mechanical, and I&C Maintenance on-shift staffing, proposed in Table B-1, eliminates prior commitments made by the licensee, that were used to justify preViously NRC approved Emergency Plan changes in September 2000. Explain in detail what specific criteria, changes, or improvements have been made from that timeframe to current, which justify eliminating the basis for the NRC approval of the previous Emergency Plan changes.
I
December 18, 2008 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUB~IECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO PROPOSED EMERGENCY PLAN CHANGE (TAC NO. MD8669)
Dear Sir or Madam:
By letter dated April 28, 2008 (non-public), to the U.S. Nuclear Regulatory Commission (NRC),
Entergy Operations, Inc., submitted a request for changes to the Emergency Plan for Grand Gulf Nuclear Station, Unit 1. The request was to allow the Repair and Corrective Action on-shift Electrical, Mechanical, and Instrumentation and Controls Maintenance functions to be performed by shift personnel assigned other duties.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete its review. The specific information requested is addressed in the enclosure to this letter and was discussed with Mr. M. Larson, et aI., of your staff on December 11, 2008. Please provide a response by February 20, 2009, to this request for additional information.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at fred.lyon@nrc.gov.
Sincerely, IRAI Carl. F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
As stated RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMGrandGulf Resource cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLIV r/f RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsRgn4MailCenter Resource KWilliams, NSIRIDDEP/ONRB ADAMS Accession No ML083460575 OFFICE NRR/LPL4/PM NRR/LPL4/LA NSIR/BC NRR/LPL4/BC NRR/LPL4/PM NAME FLyon
,~
JBurkhardt cJh..
KWilliams (email)
MMarkley K"~
FLyon 1'\\
DATE 12./i71/)~
12/17/08 v
11/26/08
~/(~/oY
\\2./18 1~{3 OFFICIAL AGENCY RECORD