ML083190863

From kanterella
Jump to navigation Jump to search
IR 05000298-08-006, Cooper Nuclear Station - Site-Specific Implementation of B.5.B Phase 2 & 3 Mitigating Strategies Temporary Instruction Inspection
ML083190863
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/13/2008
From: Ryan Lantz
Operations Branch IV
To: Minahan S
Nebraska Public Power District (NPPD)
References
IR-08-006
Download: ML083190863 (3)


See also: IR 05000298/2008006

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

November 13, 2008

Stewart B. Minahan, Vice

President-Nuclear and CNO

Nebraska Public Power District

72676 648A Avenue

Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - SITE-SPECIFIC IMPLEMENTATION OF B.5.B

PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION

INSPECTION (NRC INSPECTION REPORT 05000298/2008006)

Dear Mr. Minahan:

In a telephone conversation on November 12, 2008, Ms. Luan Bray and Mr. John Kirkland

arranged for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3

mitigating strategies at the Cooper Nuclear Station. The inspection is planned for the week of

December 15, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents

listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than November 21, 2008.

Please have available on site at the beginning of the inspection the arrangements and

documents listed in Enclosure 2. Ms. Luan Bray has been advised of this request and provided

with the name and address of the NRC lead inspector.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0011.

The public reporting burden for this collection of information is estimated to average four hours

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

aspect of this collection of information, including suggestions for reducing the burden, to the

Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission,

Washington, D.C. 20555-0001, or by Internet electronic mail to

INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington,

D.C. 20503-0001.

In accordance with 10 CFR 2.390, of the NRCs "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records System component of NRC's Agency-wide Documents Access and

Management System, accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However,

because of the sensitive information contained in the enclosures, and in accordance with

10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.

Sincerely,

/RA/

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-298

License: DPR-46

Enclosures:

1.

Documentation Requested

Prior to the Inspection

2.

Arrangements/Documents Requested

To Be Available Onsite during the

Inspection Week

cc w/o enclosure:

Gene Mace

Nuclear Asset Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Nebraska Public Power District

- 3 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

John C. McClure, Vice President

and General Counsel

Nebraska Public Power District

P.O. Box 499

Columbus, NE 68602-0499

David Van Der Kamp

Licensing Manager

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

John F. McCann, Director, Licensing

Entergy Nuclear Northeast

Entergy Nuclear Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601-1813

Director of Nuclear Safety Assurance

Nebraska Public Power District

P.O. Box 98

Brownville, NE 68321

Ronald D. Asche, President

and Chief Executive Officer

Nebraska Public Power District

1414 15th Street

Columbus, NE 68601