Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with the Interim Enforcement Policy
ML083180165
Person / Time
Site: Turkey Point  
Issue date: 11/14/2008
From: Giitter J
Division of Operating Reactor Licensing
To: Stall J
Florida Power & Light Co
Mozafari B, NRR/ADRO/DORL, 415-2020
References
TAC ME0065, TAC ME0066
Download: ML083180165 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 November 14, 2008 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 SUB\\.IECT:

TURKEY POINT UNITS 3 AND 4 - EVALUATION OF THE REQUEST FOR AN EXTENSION OF ENFORCEMENT DISCRETION IN ACCORDANCE WITH THE INTERIM ENFORCEMENT POLICY FOR FIRE PROTECTION ISSUES DURING TRANSITION TO NATIONAL FIRE PROTECTION STANDARD NFPA 805 (TAC NOS. ME0065 AND ME0066)

Dear Mr. Stall:

On September 10,2008, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (73 FR 52705) a revision to its Interim Enforcement Policy regarding enforcement discretion for certain fire protection issues, allowing licensees the option to request an extended enforcement discretion period for submittal of a license amendment request (LAR) if they are pursuing transition to Title 10 of the Code of Federal Regulations Section 50.48(c),

"National Fire Protection Association Standard NFPA 805."

This revision states that an additional period of enforcement discretion may be granted on a case-by-case basis, if a licensee has made substantial progress in its transition effort. This additional period of enforcement discretion, if granted, would end 6 months after the date of the safety evaluation approving the second pilot plant LAR. These changes are in accordance with COMSECY-08-0022, as approved by the Commission on August 19, 2008. The enforcement discretion will continue in place, without interruption, until NRC disposition of the site's LAR to transition to NFPA 805.

By letter dated September 11, 2008, Florida Power & Light Company (FPL or the licensee) requested that the period of fire protection enforcement discretion for the Turkey Point Plant, Units 3 and 4, be extended until 6 months after the NRC's approval of both pilot plant LARs to transition to the National Fire Protection Association's risk-informed, performance-based standard for light water reactors (NFPA 805). Per the new interim fire protection enforcement policy outlined above, licensees may request an extension of their evaluation period beyond the 3 years of enforcement discretion previously provided.

To be granted this extension, a licensee must:

1. Compile a list of all fire protection related non-compliances and the related compensatory measures for those noncompliances.
2.

Document that each Operator Manual Action put in place as a compensatory measure is feasible and reliable, in accordance with the guidance in Regulatory Issue Summary 2005-07, "Compensatory Measures to Satisfy the Fire Protection Program Requirements."

J. Stall

- 2

3.

Submit a description of the physical modifications performed to address existing risk-significant fire protection noncompliances.

4.

Submit a status report of the transition, including a schedule of milestones, for completing the fire probabilistic risk assessment (PRA). The status report should describe the progress made in the following areas:

classical fire protection transition nuclear safety performance criteria transition non-power operation transitions the NFPA 805 monitoring program fire PRA development The lists of noncompliances, compensatory measures, and operator manual action feasibility determinations should be maintained on-site and up to date for inspector review.

The NRC staff reviewed FPL's request, and has determined that the licensee has made substantial enough progress in their transition to NFPA 805 to grant the additional enforcement discretion. Accordingly, the enforcement discretion period for the Turkey Point Plant, Units 3 and 4, is hereby extended until 6 months after the date of the safety evaluation approving the second pilot plant LAR.

If you have any questions regarding this matter, please contact Brenda Mozafari, the project manager for the Turkey Point Plant, Units 3 and 4, at (301) 415-2020.

Sincerely, C-~./

~! -Y!--N~- /l

/ut/Z' '7

('-

I:~

Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: Distribution via ListServ

J. Stall

- 2

3. Submit a description of the physical modifications performed to address existing risk-significant fire protection noncompliances.
4. Submit a status report of the transition, including a schedule of milestones, for completing the fire probabilistic risk assessment (PRA). The status report should describe the progress made in the following areas:
  • classical fire protection transition
  • nuclear safety performance criteria transition
  • non-power operation transitions
  • fire PRA development The lists of noncompliances, compensatory measures, and operator manual action feasibility determinations should be maintained on-site and up to date for inspector review.

The NRC staff reviewed FPL's request, and has determined that the licensee has made substantial enough progress in their transition to NFPA 805 to grant the additional enforcement discretion. Accordingly, the enforcement discretion period for the Turkey Point Plant, Units 3 and 4, is hereby extended until 6 months after the date of the safety evaluation approving the second pilot plant LAR.

If you have any questions regarding this matter, please contact Brenda Mozafari, the project manager for the Turkey Point Plant, Units 3 and 4, at (301) 415-2020.

Sincerely, IRA!

Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251 cc: Distribution via ListServ DISTRIBUTION:

PUBLIC RidsOgcRp PLain, NRR LPLII-2 R/F RidsAcrsAcnw&mMailCenter HBarrett, NRR RidsNrrDorlLplll-2 RidsRgn2MailCenter CMoulton, NRR RidsN rrLABClayton RidsNrrDraAfpb (AKlein)

RGallucci, NRR Rids!'JrrPIVlBMozafari MVaaler, !'JRR ADAMS Accession Number' ML083180165 NRR-106 OFFICE LPLlI-2:PM LPLlI-2:LA DRAlAFPB/BC LPLlI-2:BC DORUDD NAME MVaaler for BMozafari BClayton AKlein*

TBoyce TMcGinty for JGiitter DATE 11/13/08 11/13/2008 11/13/2008 11/14/08 11/14/08

  • by memo dated OFFICIAL RECORD COPY