ML083150773
| ML083150773 | |
| Person / Time | |
|---|---|
| Site: | Nuclear Energy Institute, Boiling Water Reactor Owners Group, PROJ0669, PROJ0694 |
| Issue date: | 11/13/2008 |
| From: | Tanya Mensah NRC/NRR/DPR/PSPB |
| To: | Rosenberg S NRC/NRR/DPR/PSPB |
| Tanya Mensah, 415-3610 | |
| References | |
| Download: ML083150773 (8) | |
Text
REVISED LOCATION REVISED LOCATION November 13, 2008 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:
Tanya M. Mensah, Senior Project Manager /RA/
Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
CATEGORY 2 PUBLIC MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) AND INDUSTRY REPRESENTATIVES TO DISCUSS THE NRCS TOPICAL REPORT (TR) PROCESS DATE:
Thursday, November 20, 2008 TIME & LOCATION: 9:00 a.m. - 12:00 p.m.
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North (Conference Room O-3-B4) 11555 Rockville Pike Rockville, Maryland 20852 PURPOSE:
NRC and industry representatives to discuss issues regarding TR process improvements.
CATEGORY 2:*
This is a Category 2 public meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
MEETING CONTACT: Tanya Mensah, NRR 301-415-3610 TME@nrc.gov
REVISED LOCATION REVISED LOCATION
- Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002 PARTICIPANTS:
Participants from the NRC include members from the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO).
NRC INDUSTRY S. Rosenberg, NRR A. Marion, Nuclear Energy Institute (NEI)
H. Cruz, NRR M. Schoppman, NEI W. Reckley, NRO D. Buschbaum, Luminant for the Pressurized Water C. Gratton, NRR Reactor Owners Group M. Honcharik, NRR R. Bunt, Southern Nuclear for the Boiling Water A. Mendiola, NRR Reactor Owners Group Project Nos. 669, 689, 691, and 694
Enclosure:
Agenda cc w/encl: See next pages
REVISED LOCATION REVISED LOCATION November 13, 2008 PARTICIPANTS:
Participants from the NRC include members from the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO).
NRC INDUSTRY S. Rosenberg, NRR A. Marion, Nuclear Energy Institute (NEI)
H. Cruz, NRR M. Schoppman, NEI W. Reckley, NRO D. Buschbaum, Luminant for the Pressurized Water C. Gratton, NRR Reactor Owners Group M. Honcharik, NRR R. Bunt, Southern Nuclear for the Boiling Water A. Mendiola, NRR Reactor Owners Group Project Nos. 669, 689, 691, and 694
Enclosure:
Agenda cc w/encl: See next pages DISTRIBUTION:
PUBLIC PMNS PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsNrrPMTMensah RidsOpaMail RidOgcMail CGratton WReckley AMendiola KKarwoski HollyCruz CTucci JKaiser JDonoghue JCruz GCranston RElliott MRubin AHowe RidsNrrPMMHonchari TBlount TFord RidsAcrsAcnwMailCenter RidsNrrPMVPerin MCase External Email:
mas@nei.org Frederick.emerson@ge.com Gayle.elliott@areva.com ADAMS ACCESSION NO.: ML083150773 NRR-001 OFFICE PSPB/PM*
PSPB/LA SPB/BC NAME TMensah DBaxley SRosenberg DATE 11/13/08 11/12/08 11/13/08 OFFICIAL RECORD COPY
REVISED LOCATION REVISED LOCATION ENCLOSURE AGENDA FOR THE NOVEMBER 20, 2008, PUBLIC MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC)
AND INDUSTRY REPRESENTATIVES REGARDING THE NRCS TOPICAL REPORT (TR) PROCESS TOPIC DURATION (minutes)
Opening Remarks & Introductions 9:00 - 9:05 a.m.
Current Status Of NRC Near-Term TR Priorities (NRC/NEI) 9:05 - 10:15 a.m.
BREAK 10:15 - 10:30 a.m.
Additional Discussion Topics (As Time Permits) (NEI/NRC)
- Conditions and Limitations
- Pilot Plant License Amendment
- NRC Review of the Approved Version of the TR 10:30 - 11:40 a.m.
Next Steps/Action Items 11:40 - 11:50 a.m.
Public Comments 11:50 - 12:00 p.m.
Closing Remarks/Meeting Adjourned 12:00 p.m.
Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:
Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Executive Director Nuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Safety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mike Melton, Senior Project Manager 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org Mr. Chris Larsen Vice President and Chief Nuclear Officer EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dblarsen@epri.com Mr. David J. Modeen Director, External Affairs EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Dr. Sean Bushart EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 sbushart@epri.com Mr. Kurt Edsinger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dstenin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com
PWR Owners Group Project No. 694 cc:
Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Mr. Gordon Bischoff, Manager Owners Group Program Management Office Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 gordon.c.bischoff@us.westinghouse.com
BWR Owners= Group Project No. 691 Mr. Doug Coleman Vice Chair, BWR Owners= Group Energy Northwest Columbia Generating Station Mail Drop PE20 P.O. Box 968 Richland, WA 99352-0968 DWCOLEMAN@energy-northwest.com Mr. Richard Libra Executive Vice Chair, BWR Owners= Group Exelon Generation Co, LLC 200 Exelon Way Mail Code KSA 2-N Kennett Square, PA 19348 Rick.libra@exeloncorp.com Mr. Richard Anderson BWROG, Executive Chair FPL Energy (DAEC)
Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 richard_l_anderson@fpl.com Mr. James F. Klapproth GE-Hitachi Nuclear Energy M/C A50 3901 Castle Hayne Road Wilmington, NC 28401 james.klapproth@ge.com Mr. Joseph E. Conen Regulatory Response Group Chair BWR Owners= Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 conenj@dteenergy.com Mr. J. A. Gray, Jr.
Regulatory Response Group Vice-Chair BWR Owners= Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 JGray4@entergy.com Mr. Ken A. McCall, Program Manager GE Energy M/C F12 3901 Castle Hayne Road Wilmington, NC 28401 kenneth.mccall@ge.com Mr. Tim E. Abney GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 tim.abney@ge.com Oscar Limpias Entergy Nuclear Northeast 1340 Echelon Parkway.
Jackson, MS 39213-8202 olimpia@entergy.com Joe Donahue Progress Energy Inc.
410 S. Wilmington St.
PEB 6A Raleigh, NC 27601-1849 joe.w.donahue@pgnmail.com Paul J. Davison Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 paul.davison@pseg.com Dennis Madison, Hatch Vice President Southern Nuclear Operating Co.
11028 Hatch Parkway North Baxley, GA 31515-2010 drmadiso@southernco.com