Units 1 & 2 - Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805
ML083110707
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 11/21/2008
From: Giitter J
Plant Licensing Branch III
To: Reddemann M
Northern States Power Co
Wengert, Thomas NRR/DORL 415-4037
References
TAC MD9585, TAC MD9586, TAC MD9587
Download: ML083110707 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 21, 2008 Mark E. Reddemann Vice President - Nuclear Operations Support Northern States Power Company - Minnesota 414 Nicollet Mall (MP-4)

Minneapolis, MN 55401

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT AND PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - EVALUATION OF THE REQUEST FOR AN EXTENSION OF ENFORCEMENT DISCRETION IN ACCORDANCE WITH THE INTERIM ENFORCEMENT POLICY FOR FIRE PROTECTION ISSUES DURING TRANSITION TO NATIONAL FIRE PROTECTION STANDARD NFPA 805 (TAC NOS. MD9585, MD9586, AND MD9587)

Dear Mr. Reddemann:

On September 10, 2008, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (73 FR 52705) a revision to its Interim Enforcement Policy regarding enforcement discretion for certain fire protection issues, allowing licensees the option to request an extended enforcement discretion period for submittal of a license amendment request (LAR) if they are pursuing transition to Title 10 of the Code of Federal Regulations Section 50.48(c),

"National Fire Protection Association Standard NFPA 805."

This revision states that an additional period of enforcement discretion may be granted on a case-by-case basis, if a licensee has made substantial progress in its transition effort. This additional period of enforcement discretion, if granted, would end 6 months after the date of the safety evaluation approving the second pilot plant LAR. These changes are in accordance with COMSECY-08-0022, as approved by the Commission on August 19, 2008. The enforcement discretion will continue in place, without interruption, until NRC disposition of the site's LAR to transition to NFPA 805.

By letter dated August 26, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082400208), Nuclear Management Company, LLC, a predecessor license holder to the Northern States Power Company, a Minnesota corporation (NSPM),

requested that the period of fire protection enforcement discretion for Monticello Nuclear Generating Plant (MNGP) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP) be extended until 6 months after the NRC's approval of both pilot plant LARs to transition to the National Fire Protection Association's risk-informed, performance-based standard for light-water reactors (NFPA 805). Per the new interim fire protection enforcement policy outlined above, licensees may request an extension of their evaluation period beyond the 3 years of enforcement discretion previously provided.

To be granted this extension, a licensee must:

1.

Compile a list of all fire protection related non-compliances and the related compensatory measures for those non-compliances.

M. Reddemann

- 2

2.

Document that each Operator Manual Action put in place as a compensatory measure is feasible and reliable, in accordance with the guidance in Regulatory Issue Summary 2005-07, "Compensatory Measures to Satisfy the Fire Protection Program Requirements."

3.

Submit a description of the physical modifications performed to address existing risk-significant fire protection non-compliances.

4.

Submit a status report of the transition, including a schedule of milestones, for completing the fire probabilistic risk assessment (PRA). The status report should describe the progress made in the folloWing areas:

classical fire protection transition nuclear safety performance criteria transition non-power operation transitions the NFPA 805 monitoring program fire PRA development The lists of non-compliances, compensatory measures, and operator manual action feasibility determinations should be maintained on-site and up to date for inspector review.

The NRC staff reviewed NSPM's request and has determined that the licensee has made enough substantial progress in their transition to NFPA 805 to grant the additional enforcement discretion. Accordingly, the enforcement discretion period for MNGP and PINGP is hereby extended until 6 months after the date of the safety evaluation approving the second pilot plant LAR.

If you have any questions regarding this matter, please contact Tom Wengert, the project manager for PINGP, at (301) 415-4037, or Peter Tam, the project managerfor MNGP, at (301) 415-1451.

Sincerely,

~_

n

'-~

J seph G. Giitter, irector ivision of Operating Reactor Licensing Office of Nuclear Reactor Regulation

~

Docket Nos. 50-263, 50-282, 50-306, and 72-10 cc: Distribution via ListServ

M. Reddemann

- 2

2. Document that each Operator Manual Action put in place as a compensatory measure is feasible and reliable, in accordance with the guidance in Regulatory Issue Summary 2005-07, "Compensatory Measures to Satisfy the Fire Protection Program Requirements."
3. Submit a description of the physical modifications performed to address existing risk-significant fire protection non-compliances.
4. Submit a status report of the transition, inclUding a schedule of milestones, for completing the fire probabilistic risk assessment (PRA). The status report should describe the progress made in the following areas:
  • classical fire protection transition
  • nuclear safety performance criteria transition
  • non-power operation transitions
  • fire PRA development The lists of non-compliances, compensatory measures, and operator manual action feasibility determinations should be maintained on-site and up to date for inspector review.

The NRC staff reviewed NSPM's request and has determined that the licensee has made enough substantial progress in their transition to NFPA 805 to grant the additional enforcement discretion. Accordingly, the enforcement discretion period for MNGP and PINGP is hereby extended until 6 months after the date of the safety evaluation approving the second pilot plant LAR.

If you have any questions regarding this matter, please contact Tom Wengert, the project manager for PINGP, at (301) 415-4037, or Peter Tam, the project manager for MNGP, at (301) 415-1451.

Sincerely, IRA!

Joseph G. Giitter, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-263,50-282,50-306, and 72-10 cc: Distribution via ListServ DISTRIBUTION:

PUBLIC RidsOgcRp Resource PLain, NRR LPL3-1 RlF RidsAcrsAcnw_MailCTR Resource HBarrett, NRR RidsNrrDorlLpl3-1 RidsRgn3MailCenter Resource CMoulton, NRR RidsNrrLATHarris RidsNrrDraAfpb (AKlein)

RGallucci, NRR RidsNrrPMPrairielsland Resource MVaaler, NRR RidsNrrPMMonticelio Resource RidsNrrDorl ADAMS Accession Number" ML083110707 NRR-106 OFFICE LPL3-1:PM LPL3-1:PM LPL3-1 :LA AFPB:BC LPL3-1 :BC DORL:DD NAME TWenqerl JPoole fpr PTam THarris AKlein*

PTam for LJames JGiitter DATE 11/21/08 11/21/08 11/21/08 11/21/08 11/21/08 11/21/08

  • by memo dated 11/21/08 OFFICIAL RECORD COpy