Boiling Water Reactor (LACBWR) Master Inspection Plan - Fiscal Year (Fy) 2009
ML082980277
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/20/2008
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Berg W
Dairyland Power Cooperative
References
Download: ML082980277 (3)


Text

October 20, 2008 Mr. W. L. Berg General Manager Dairyland Power Cooperative 3200 East Avenue S.

P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

LA CROSSE BOILING WATER REACTOR (LACBWR) MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2009

Dear Mr. Berg:

In accordance with U.S. NRC Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LACBWR. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site from October 2008 through September 2009 (FY2009). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2009 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2009, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2009 MIP remains current, we request that you keep the Materials Control, ISFI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the LACBWR FY2009 MIP.

We currently project the Region will conduct an inspection at LACBWR during FY2009 to evaluate spent fuel pool safety and related routine decommissioning activities. Additional inspections will be scheduled as necessary regarding the construction of a large tank in the reactor cavity that will hold the dry fuel storage casks for off-loading the fuel. The Region will also conduct an inspection to evaluate the design and construction of the dry fuel storage pad.

This may involve several onsite observations in addition to in-office review. Following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Security-related inspection activities will be addressed in a separate MIP.

W. Berg Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 60856 Review of 72.212(b) Evaluations IP 60853 Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc : Roger Christians, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section, WI Department of Health Social Services, Division of Health DISTRIBUTION:

See next page

Letter to W. L. Berg from Christine Lipa dated October 20, 2008

SUBJECT:

LA CROSSE BOILING WATER REACTOR (LACBWR) MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2009 DISTRIBUTION:

Docket File RIII PRR T. Smith, FSME K. Banovac, FSME N. Orlando, FSME S. Reynolds, RIII S. Barker, RIII RIII PRR DOCUMENT NAME: G:\SEC\Work in progress\LACBWR MIP FY09 Draft.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME WGSnell:mb PJLee CALipa DATE 10/16/08 10/16/08 10/20/08 OFFICIAL RECORD COPY