MONTHYEARML24170A8392024-06-18018 June 2024 June 12, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Byron Station, Units 1 and 2 ML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML22264A1992022-11-14014 November 2022 Summary of August 22, 2022, Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Steam Generator Welds (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and ML22305A5992022-11-10010 November 2022 Summary of Closed Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Transition to Framatome Fuel ML22159A2232022-06-0909 June 2022 Summary of the June 2, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2 ML22115A2122022-05-12012 May 2022 Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor ML22111A3362022-05-0909 May 2022 Summary of April 7, 2022, Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (Epids L-2022-LRR-0035 and 0036) ML22111A2852022-05-0909 May 2022 Summary of April 4, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Performance Monitoring of Pressurizer Welds (EPIDs L-2022-LLR-0035/36) ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21167A2152021-06-16016 June 2021 June 8, 2021, Summary of the Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML21147A4262021-06-0303 June 2021 Summary of May 12, 2021, Meeting with Exelon Generation Company, Llc, Related to a Planned License Amendment to Modify the Ultimate Heat Sink Technical Specifications ML21033A6582021-02-0404 February 2021 Summary of October 13, 2020, Presubmittal Meeting Between the U. S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Post Shutdown Emergency Plan Staffing to Support the Planned Early Closures ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML20171A3812020-08-12012 August 2020 (COVID-19) Presubmittal Meeting Summary - Byron Unit 2 LAR - One-Time Extension of Steam Generator Tube Inspections ML20218A5302020-08-0505 August 2020 July 14, 2020, Summary of the Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18225A3042018-08-16016 August 2018 Summary of August 8, 2018, Meeting with Exelon Generation Company, LLC, on a Future Relief Request to Extend the Post Peening Follow-Up Inspections for Certain Reactor Pressure Vessel Head Penetrations ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18113A7052018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Byron Station ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17347B1022017-12-14014 December 2017 Summary of Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response ML17296B1282017-11-0202 November 2017 Summary of Partially Closed Meeting to Discuss Exelon Lead Test Assembly Program for Byron Unit 2 of the Westinghouse Encore Accident Tolerant Fuel Product 2024-06-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 24, 2008 LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2
SUBJECT:
Meeting Summary for Regulatory Conference (EA-08-197)
On September 16, 2008, representatives of Exelon Generation Company, LLC, the licensee for Byron Station, Units 1 and 2, met with NRC personnel in the Region III office located in Lisle, Illinois, to discuss the apparent violation identified in NRC Inspection Report Number 2008003. The regulatory conference was held at the request of the licensee.
The purpose of the regulatory conference was to discuss the preliminary white finding regarding the inadvertent entry into an unanalyzed orange risk condition at Bryon Station, Unit 2.
The licensee presented a summary of the causes for the apparent violation and the associated corrective actions. The licensee did not present any new information other than the documents already provided to the NRC. The focus of the licensees presentation was that recovery credit should be given for manual actions that could be taken in the event of flooding.
The attendance list and the licensee's presentation are attached to this summary.
Also, a copy of the licensees slides presented during the meeting can be found in Agencywide Documents Access and Management System (ADAMS) ML082620687.
There were no members of the public present at this meeting. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this summary and its enclosures will be made available to the Public.
Sincerely,
/RA/
Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects License Nos. NPF-37; NPF-66 Docket Nos. 50-454; 50-455
Enclosures:
- 1. Attendance List
- 2. Licensee Presentation Distribution See next page
LICENSEE: Exelon Generation Company, LLC FACILITY: Byron Station, Units 1 and 2
SUBJECT:
Meeting Summary for Regulatory Conference (EA-08-197)
On September 16, 2008, representatives of Exelon Generation Company, LLC, the licensee for Byron Station, Units 1 and 2, met with NRC personnel in the Region III office located in Lisle, Illinois, to discuss the apparent violation identified in NRC Inspection Report Number 2008003. The regulatory conference was held at the request of the licensee.
The purpose of the regulatory conference was to discuss the preliminary white finding regarding the inadvertent entry into an unanalyzed orange risk condition at Bryon Station, Unit 2.
The licensee presented a summary of the causes for the apparent violation and the associated corrective actions. The licensee did not present any new information other than the documents already provided to the NRC. The focus of the licensees presentation was that recovery credit should be given for manual actions that could be taken in the event of flooding.
The attendance list and the licensee's presentation are attached to this summary.
Also, a copy of the licensees slides presented during the meeting can be found in Agencywide Documents Access and Management System (ADAMS) ML082620687.
There were no members of the public present at this meeting. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this summary and its enclosures will be made available to the Public.
Sincerely, Richard A. Skokowski, Chief Projects Branch 3 Division of Reactor Projects License Nos. NPF-37; NPF-66 Docket Nos. 50-454; 50-455
Enclosures:
- 1. Attendance List
- 2. Licensee Presentation DISTRIBUTION See next page See Previous Concurrences DOCUMENT NAME: G:\Branch 3\Byron Regulatory Conference Summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME MThorpe- RSkokowski KOBrien Kavanaugh:mb DATE 09/23/08 09/24/08 09/24/08 OFFICIAL RECORD COPY
Letter to Exelon Generation Company, LLC from R. Skokowski dated September 24, 2008.
cc w/encls:
C. Pardee, Chief Nuclear Officer and Senior Vice President Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency J. Klinger, State Liaison Officer, Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station President, Village of Leaf River President, Village of Davis Junction President, Village of Stillman Valley Ogle County Board Chairman Ogle County Sheriff/EMA Coordinator EMA Coordinator, Winnebago County Winnebago County Board Chair Winnebago County Sheriff/ESDA Mayor of Oregon Mayor of Byron President, Village of Mt. Morris Mayor of Rochelle G. Mortensen, INPO
Letter to Exelon Generation Company, LLC from R. Skokowski dated September 24, 2008.
DISTRIBUTION:
RidsNrrDorlLpl3-2 Tamara Bloomer RidsNrrPMByronResource RidsNrrDirsIrib Resource Mark Satorius Jared Heck Allan Barker Carole Ariano DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov OEMAIL Kenneth OBrien Patricia Lougheed Cynthia Carpenter Catherine Marco Mary Ann Ashley
ATTENDEE LIST REGULATORY CONFERENCE BYRON (EA-08-197)
SEPTEMBER 16, 2008 Exelon Stephen Kuczynski, Senior Vice President Operations Keith Jury, Vice President Licensing and Regulatory Affairs Dave Hoots, Site Vice President Dave Czufin, Vice President Engineering Brad Adams, Plant Manager Scott Fruin, Shift Operations Superintendent William Grundmann, Regulatory Assurance Manager Greg Krueger, Senior Manager Risk Management Analyst, Kennett Square Steve Mays, Manager Risk Technology Patrick Simpson, Licensing Manager Tracey Hulbert, NRC Coordinator Darin Benyak, Licensing Director Lisa Schofield, Licensing Engineer Tricia Mattson, Licensing Engineer Cheryl Gayheart, Operations Director Scot Greenlee, Byron Engineering Director Joseph Edom, Site Risk Management Engineer, Byron Joseph Langan, Byron Regulatory Assurance Illinois Emergency Management Agency Alwyn C. Settles, Section Head Nuclear Regulatory Commission Mark Satorius, Deputy Regional Administrator Cynthia Pederson, Director, DRP Steven West, Director, DRS Richard Skokowski, Chief, Branch 5, DRP Laura Kozak, Senior Risk Analyst, DRS Patricia Lougheed, Enforcement Coordinator, EICS Nicholas Valos, Senior Operations Examiner, DRS Ray Ng, Bryon Resident Inspector, DRP Meghan Thorpe-Kavanaugh, Reactor Engineer, DRP Magdalena Gryglak, Enforcement & Allegations Coordinator, EICS Patricia Voss, Reactor Engineer, DRP See-Meng Wong, Senior Risk Analyst, NRR Marshall David, Project Manager, NRR Stephen Alexander, NRR Enclosure 1