ML082660006
ML082660006 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 09/20/2008 |
From: | Saporito T Saporito Energy Consultants |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-266-LA, ASLBP 08-870-01-LA-BD01, RAS 1156 | |
Download: ML082660006 (20) | |
Text
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 1 of 16 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of:
Docket Nos. 50-266-LA FPL Energy Point Beach, LLC ALSBP No. 08-870-01-LA-BD01 (Point Beach Nuclear Plant Unit 1) Date: 20-SEP-2008 PETITIONERS RESPONSE TO ANSWERS BY THE NUCLEAR REGULATORY COMMISSTION STAFF AND BY THE FLORIDA POWER AND LIGHT COMPANY INTRODUCTION On 15-SEP-2008, the U.S. Nuclear Regulatory Commission NRC (Staff) filed NRC Staffs Answer to Saporito Energy Consultants Petition to Intervene and Request for Hearing (Petition) in the above-styled matter. Consequently, on 11-SEP-2008, the Florida Power and Light Company (FPL) filed Answer of FPL Energy Point Beach, LLC to Request for Hearing and Petition for Leave to Intervene of Saporito Energy Consultants in the above-styled matter. Both the NRC Staff and FPL argue that the Petition filed by Saporito Energy Consultants (SEC) and its President, Thomas Saporito (Saporito)(herein after Petitioners), should be denied for failure of Petitioners to demonstrate standing and to submit an admissible contention.
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 2 of 16 DISCUSSION
- 1. Legal Standards
- a. Legal Standards Governing Standing In their Answer, the Staff argues in relevant part that,
. . . In support of SECs standing, the Petition merely lists Thomas Saporito, the president of SEC, with a street address in Jupiter, Florida. .
.Petitioners claim that Mr. Saporito, as a U.S.
citizen, has an inherent right under the [AEA] to be made a party to the proceeding, and therefore, based on Mr. Saporitos citizenship and his status as president of SEC, SEC has a right to be made a party as well. . .Petitioners also state that Mr. Saporito and SEC have real property and personal property and financial interests through their prospective business partners and clients of which can be adversely affected if operations at BPNPcause a release of radioactive particles into the environment. . .
.Specifically, Petitioners claim that such a release could render Petitioners prospective business partners and clients home and property unavailable for human contact or use for many years or forever, and could forever compromise the environment where the Petitioners prospective business partners and clients reside, live and do business and therefore economically harm Petitioners.
Id. at 7. The Staff continues that,
. . . Neither Mr. Saporito, as an individual, nor SEC, as an organization, has made the required showing to support standing. First, . . . there is no inherent right under the AEA, based on U.S.
citizenship or otherwise, to participate as a party in a proceeding. . . Second, Petitioners vague assertion of possible harm resulting from injury to unidentified prospective business partners and clients do not amount to a showing of concrete and particularized injury to Mr. Saporitos interests or SECs interests that is actual or imminent, not conjectural or hypothetical. . . . Petitioners have not identified any actual business partners or clients who would be
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 3 of 16 affected; therefore, Petitioners assertion is merely speculative, hypothetical and insufficient to support standing. . . Third, Petitioners vaguely assert that the alleged harm could result from operations at. . .
Point Beach, . . and fail to demonstrate that such injury would result from the challenged license amendment. . . Finally, Petitioners cannot rely on the proximity presumption to support their standing.
The addresses provided in Jupiter, Florida are over 1200 miles from Point Beach, far beyond the 50-mile radius that would grant them proximity standing in a construction permit or operating license proceeding.
Id. at 8-9. FPLs Answer in this proceeding parrot that of the Staffs Answer and therefore need not be redressed herein since FPL arguments duplicate those of the Staff in likeness and in all respects.
- b. Petitioners Have Standing as a Matter of Right Petitioners aver here that they have standing in the above-styled proceeding as a matter of right. SECs President, Thomas Saporito, is the owner and operator of SEC which operates its business across the continental United States of America (USA). See, http://saporitoenergyconsultants.com. See, also, Affidavit of Thomas Saporito.
Thus, it is of no consequence that SEC (company) and Saporito have a mailing address and/or a physical address shown in Jupiter, Florida since the companys business involves the geographical area well within the NRCs 50-
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 4 of 16 mile zone of interest1 described by the Staff. Moreover, it is of no consequence whether or not the Point Beach Nuclear Plant (PBNP) is in a state of construction or are fully operational (as it currently exist) because SEC business operations encompass the geographical area well within the NRCs 50-mile zone of interest. As SECs President, Saporito requires physical access to SECs potential customer base located within 50-miles or closer to PBNP, both Saporito and SEC have requisite standing in the instant matter. Notably, part of SECs business plan is to have its President travel to the greater area near and within 50-miles of the PBNP to ascertain a client base and to ascertain partnerships with existing businesses. See, Saporito affidavit. Thus, it is clear that SEC has standing through its president and Saporito has standing due to his need to conduct SEC business within a 50-mile radius of the BPNP. See, Consumers Energy Co. (Big Rock Point ISFSI),
CLI-07-19, 65 NRC 423, 426 (2007), citing Florida Power &
Light Co. (St. Lucie Nuclear Power Plant, Units 1 & 2),
CLI-89-21, 30 NRC 325, 329 (1989).
- c. Petitioners Are Subject to Injury-In-Fact Resulting From the LAR and Therefore Have Standing 1
See, Tenn. Valley Auth. (Sequoyah Nuclear Plant, Units 1&2; Watts Bar Nuclear Plant, Unit 1), LBP-02-14, 56 NRC 15, 23 (2002).
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 5 of 16 To the extent that Petitioners business activities involve physical access to areas within the NRCs 50-mile zone of interest of the PBNP, Petitioners assert that they are subject to injury-in-fact as a direct or indirect result of License Amendment Request (LAR) where changes to the PBNP technical specifications have reduced the degree of the margin of safety in operation of the PBNP Unit 1. Specifically, Petitioners assert here that the License Amendment Request (LAR-257) changes the existing technical specifications of PBNP and makes assumptions with respect to the inspection of PBNP Steam Generator (SG) tubes, degradation of the SG tubes, pull-out of SG tubes, cracking of SG tubes and plugging of the SG tubes which are less conservative and will result in operation PBNP with less of a degree of a margin of safety and therefore could result in an accident involving leakage of primary (radioactive water) to secondary SG water inventory and thereby release radioactive particles into the environment in and around the area where Petitioners conduct business.
See, Saporito affidavit. Petitioners further assert that such an accident could render the affected area described above uninhabitable to humans and thereby adversely affect the business of SEC.
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 6 of 16
- 2. Petitioners Contentions In their Answer, the Staff contends that, the Petitioners four contentions are inadmissible because they challenge the Staffs no significant hazards consideration (NSHC) determination. Id. at 10. In addition, the Staff alleges that Petitioners contentions are also inadmissible because they fail to satisfy, or even address, the Commissions contention pleading requirements as set forth in 10 C.F.R. §2.309(f)(1). Id. at 10.
- a. Petitioners Amended Contentions In accordance with the Commissions Rules of Practice for Domestic Licensing Proceedings at 10 C.F.R. 2.309, Petitioners hereby collectively amend their 4-contentions previously submitted in the instant matter.
Overview of the License Amendment Request This amendment proposes a one cycle revision to the PBNP TS.
Specifically, TS 5.5.8, "Steam Generator (SG) Program," and TS 5.6.8, "Steam Generator Tube Inspection Report," will be revised to incorporate an interim alternate repair criterion into the provisions for SG tube repair for use during the PBNP Unit 1
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 7 of 16 2008 fall refueling outage (Ul R31) and the subsequent operating cycle.2
- 3. Amended Contention(s)
Petitioners contend here that the proposed amendments for PBNP changes the existing technical specifications of PBNP and makes assumptions with respect to the inspection of PBNP Steam Generator (SG) tubes, degradation of the SG tubes, pull-out of SG tubes, cracking of SG tubes and plugging of the SG tubes which are less conservative and will result in operation PBNP with less of a degree of a margin of safety and therefore could result in an accident involving leakage of primary (radioactive water) to secondary SG water inventory and thereby release radioactive particles into the environment in and around the area where Petitioners conduct business. See, Saporito affidavit.
3.1 The Technical Justification for Use of Interim Alternate Repair Criterion is Not Applicable to PBNPs Unit-1 Reactor The technical justification for use of Interim Alternate Repair Criterion (IARC) makes the assumption that as a . . . product of a jointly-funded effort among a 2
See, Letter from James H. McCarthy, FPL Energy Point Beach, LLC, to the NRC Document Control Desk, License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report Interim Alternate Repair Criteria (IARC) for Steam Generator Tube Repair, dated May 28, 2008 (LAR-257).
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 8 of 16 number or utilities for the development of the IARC, the technical justification was developed as a bounding case for the affected plants with hydraulically expanded Alloy 600TT tubing, including Point Beach Unit 1. . . and that
. . . the technical justification . . . applies directly to Point Beach Unit 1.3 Petitions contend however that the PBNP Unit-1 operates with parameters which are different from the operating parameters of the nuclear plants relied upon in the licensees technical justification in the development of the IARC for LAR-257. Therefore, despite the use of Alloy 600TT in the PBNP Unit-1, there exists operational parameters such as pressure, temperature, flow, tubesheet bending, etc. which are specific to the PBNP Unit-1 that may adversely affect the calculations relied upon in the licensees technical justification in the development of the IARC for LAR-257. To the extent that the licensees LAR-257 relies on operational parameters of other nuclear plants to justify use of the IARC for the PBNP Unit-1, Petitioners contend that the LAR-257 is flawed and should not be allowed. Petitioners further contend that reliance on the licensees technical justification in the development of the IARC for LAR-257 could result in 3
See, internal Westinghouse letter dated May 23, 2008
Subject:
Applicability of the IARC Technical Justification to Point Beach 1 which was included in the licensees LAR-257 package submitted to the NRC.
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 9 of 16 significant leakage of highly radioactive primary water from within the tubes of the PBNP Unit-1 SG to the secondary water inventory and ultimately released into the environment. See, Saporito affidavit.
3.2 TS 5.5.8 at 3(c) Would be Changed to Lessen the Degree of the Margin of Safety Which Would Otherwise Exist Without LAR-257 Petitioners contend here that LAR-257 lessens the degree of the margin of safety which would otherwise exist without the amendment. Specifically, LAR-257 would allow the licensee to operate PBNP Unit-1 at full power despite an in-service inspection which showed SG tubes having a flaw with a circumferential component less than or equal to 203 degrees found in the portion of the tube below 17-inches from the top of the tubesheet and above 1-inch from the bottom of the tubesheet do not require plugging. Id. at 5.5-8. Petitioners contend here that the operational parameters for the PBNP Unit-1 could cause any flaws discovered during an in-service inspection which have a circumferential component less than or equal to 203 degrees located in the tube section within 17-inches from the top of the tubesheet and above 1-inch from the bottom of the tubesheet require plugging. Petitioners further contend that the failure to plug the aforementioned flawed tubes could result in substantial growth of the flaws due to the operational stresses
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 10 of 16 imposed on the flawed tubes and thereby increase any leakage of highly radioactive primary water to the secondary water within the SG and ultimately released into the environment. See, Saporito affidavit.
3.3 It is Not Acceptable to Count the Overlapped Portions Only Once in the Total of Circumferential Components In LAR-257, the licensee proposes that . . . When the circumferential components of each of the flaws are added, it is acceptable to count the overlapped portions only once in the total of circumferential components. . . Id. at 5.58-a.
Petitioners contend here that any overlapped portions of discovered SG tube flaws must be counted individually and additively applied to the total of circumferential components.
Notably, LAR-257 would allow the licensee to ignore SG tube flaws in tubes found with overlapped portions to the extent that the total of circumferential components is artificially less than the actual and existing circumferential component total.
Thus, Petitioners contend here that the licensees LAR-257 is technically flawed and could cause a significant amount of highly radioactive primary water to enter the SG secondary water inventory and ultimately be released into the environment. See, Saporito affidavit.
3.4 LAR-257 Fails to Identify the PBNP Unit-1 as an Affected Domestic Plant in Table 4-1 of the LAR
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 11 of 16 In its LAR-257 submission at Enclosure 4, p.2, the licensee states that,
. . . the resulting minimum ligament and required undergraded length of tube below the top of the tubesheet can be safety applied for any of the affected domestic plants identified in Table 4-1.
Petitioners aver here that Table 4-1 of the licensees LAR-257 does not identify the PBNP Unit-1 as a domestic plant for which the technical justification relied upon by the licensee in LAR-257 was made. Thus, Petitioners contend here that the licensees LAR-257 is technically flawed and could therefore cause highly radioactive primary water to leak from within the PBNP Unit-1 SG tubes to the secondary SG water inventory and ultimately be released into the environment. See, Saporito affidavit.
3.5 The IARC Fails to Meet 10 C.F.R. Part 100 Guidelines or GDC-19 Requirements In its LAR-257, the licensee states, in relevant part, that, that the IARC for the tubesheet region is designed to meet the rigors of 10 C.F.R. Part 100 and GDC-19. Id. at , p.3. Specifically, the potential primary-to-secondary leak rate during postulated design basis accidents shall not exceed the offsite radiological dose consequences required by 10 C.F.R. Part 100 guidelines or the radiological consequences to control room personnel
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 12 of 16 required by GDC-19, or other NRC-approved licensing basis.
Id. In addition the licensees LAR-257 relies on the performance criteria of NEI 97-06 Rev.2 (Reference 2-1) for the basis of its analysis. See, Enclosure 4 at p.3.
Petitioners contend that the licensees LAR-257 is flawed insofar as it mis-interpreted the structural integrity criterion stating that tube pullout from the tubesheet is equivalent to a tube burst and must, therefore, be prevented and relied on criteria that was not specific to the operational parameters of the PBNP Unit-1.
Id. Petitioners contend here that the licensees LAR-257 should have made a technical assessment specific to the PBNP Unit-1 operational parameters and that the structural integrity criterion should have been interpreted to mean that all in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down and all anticipated transients included in the design specifications) and design basis accidents. See, NEI 97-06, Rev.2 (Reference 2-1). Here, in LAR-257, the licensee admittedly interprets structural integrity to mean only that tube pullout from the tubesheet is equivalent to a tube burst. Petitioners
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 13 of 16 contend here that the licensees interpretation of structural integrity as it relates to the safety requirements of NEI 97-06 Rev.2 (Reference 2-1) are too narrowly defined and could therefore cause highly radioactive primary water to leak from within the PBNP Unit-1 SG tubes to the secondary SG water inventory and ultimately be released into the environment. See, Saporito affidavit. Moreover, Petitioners contend that movement in the SG tubesheet could necessarily cause unexpected growth of existing cracks in the PBNP Unit-1 SG tubes and violate the safety margins in the performance criteria of NEI 97-06 Rev.2 (Reference 2-1). Petitioners once again aver here that the licensees LAR-257 is not specific to, nor does it rely, solely on the operational parameters for the PBNP Unit-1 and is therefore inherently flawed and could result in a release of highly radioactive particles into the environment as described above.
3.6 LAR-257 Relies on Tube Geometries of Steam Generators Model D, Model F, and Model 44F and Fails to Identify the PBNP Unit-1 Steam Generators as Being Specific in Design and Operation to These SG Models In LAR-257, the licensee relies on three SG models for use of the IARC in its analysis of the PBNP Unit-1 SGs.
Specifically; the licensee identifies SG models D, F,
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 14 of 16 and 44F in LAR-257. However, the licensee fails to state whether the PBNP Unit-1 SGs are identical in design and operation to the three models which were analyzed in LAR-257. Consequently, the licensees LAR-257 is technically flawed and cannot be relied upon to ascertain the safety implications of using the IARC for the PBNP Unit-1 SGs.
Petitions further contend that use of the licensees flawed technical justification in LAR-257 could result in a release of highly radioactive particles into the environment as described above.
CONCLUSION For all the foregoing reasons, the Petition filed by SEC through its President, Thomas Saporito, should be found by this Atomic Safety and Licensing Board Panel (ASLBP) to be in full compliance with the standing requirements at 10 C.F.R. §2.309(d) and the contention admissibility requirements at 10 C.F.R. §2.309(f)(1). Therefore, the request for hearing and leave to intervene should be GRANTED.
Respectfully submitted,
/Thomas Saporito/
Electronically Signed Thomas Saporito, President Saporito Energy Consultants Post Office Box 8413
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 15 of 16 Jupiter, Florida 33468-8413 Voice: (561) 283-0613 Fax: (561) 952-4810 Email: saporito3@gmail.com Web: http://saporitoenergyconsultants.com UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of:
Docket Nos. 50-250/251-OLA Florida Power and Light Company ALSBP No. 08-869-03-OLA-BD01 (Turkey Point Nuclear Plant, Units 3 and 4)
CERTIFICATE OF SERVICE I hereby certify that a copy of PETITIONERS RESPONSE TO ANSWERS BY THE NUCLEAR REGULATORY COMMISSTION STAFF AND BY THE FLORIDA POWER AND LIGHT COMPANY in the above-styled matter was served on the following relying on the United States Governments Electronic Information Exchange this 20th day of September, 2008:
/Thomas Saporito/
By: _______________________
Electronically Signed Hon. William J. Froelich, Chair Administrative Law Judge Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Email: wjf1@nrc.gov Hon. Thomas S. Moore Administrative Law Judge Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
ALSBP No. 08-870-01-LA-BD01 Point Beach Nuclear Plant, Unit 1 Docket No. 50-266-LA Page 16 of 16 Email: tsm2@nrc.gov Hon. Mark O. Barnett Administrative Law Judge Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Email: mfk2@nrc.gov Atomic Safety and Licensing Board Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Office of Commission Appellate Adjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Email: OCAAMAIL.Resource@nrc.gov Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Email: Hearing.Docket@nrc.gov Marcia J. Simon Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, D.C. 20555-0001 Email: marcia.simon@nrc.gov Mitchell S. Ross Antonio Fernandez Florida Power and Light Company 700 Universe Boulevard P.O. Box 14000 Juno Beach, Florida 33408-0420 Email: mitch.ross@fpl.com Email: antonio.fernandez@fpl.com
Affidavit of Thomas Saporito ASLBP No. 08-870-01-LA-BD01 FPL Energy Point Beach, LLC Point Beach Nuclear Plant, Unit-1 AFFIDAVIT OF THOMAS SAPORITO BEFORE ME, the undersigned Notary, on this 20 day of September, 2008 personally appeared Thomas Saporito, known to me to be a credible person and of lawful age, who being by me first duly sworn, on his oath, deposes and says:
- 1. I am Thomas Saporito the President of Saporito Energy Consultants (SEC) identified in the matter of ALSBP No. 08-870-01-LA-BD01, FPL Energy Point Beach, LLC (PBNP).
- 2. As the President of SEC, I require physical access to SECs potential customer base located within 50-miles or closer to the PBNP.
- 3. Part of SECs business plan is to have its President travel to the greater area and within 50-miles of the PBNP to ascertain a client base and to ascertain partnerships with existing businesses.
- 4. The License Amendment Request (LAR-257) changes the existing technical specifications of PBNP and makes assumptions with respect to the inspection of PBNP Steam Generator (SG) tubes, degradation of the SG tubes, pull-out of SG tubes, cracking of SG tubes and plugging of the SG tubes which are less conservative and will result in operation PBNP with less of a degree of a margin of safety and therefore could result in an accident involving leakage of primary (radioactive water) to secondary steam generator(SG) water inventory and thereby release radioactive particles into the environment in and around the area where Petitioners conduct business.
- 5. The proposed amendments for PBNP change the existing technical specifications of PBNP and makes assumptions with respect to the inspection of PBNP SG tubes, degradation of the SG tubes, pull-out of SG tubes, cracking of SG tubes and plugging of the SG tubes which are less conservative and will result in operation PBNP with less of a degree of a margin of 1
Affidavit of Thomas Saporito ASLBP No. 08-870-01-LA-BD01 FPL Energy Point Beach, LLC Point Beach Nuclear Plant, Unit-1 safety and therefore could result in an accident involving leakage of primary (radioactive water) to secondary SG water inventory and thereby release radioactive particles into the environment in and around the area where Petitioners conduct business.
- 6. The technical justification for use of Interim Alternate Repair Criterion (IARC) makes the assumption that as a . . . product of a jointly-funded effort among a number or utilities for the development of the IARC, the technical justification was developed as a bounding case for the affected plants with hydraulically expanded Alloy 600TT tubing, including Point Beach Unit 1. . . and that . . . the technical justification . . . applies directly to Point Beach Unit 1. However, the PBNP Unit-1 operates with parameters which are different from the operating parameters of the nuclear plants relied upon in the licensees technical justification in the development of the IARC for LAR-257. Therefore, despite the use of Alloy 600TT in the PBNP Unit-1, there exists operational parameters such as pressure, temperature, flow, tubesheet bending, etc. which are specific to the PBNP Unit-1 that may adversely affect the calculations relied upon in the licensees technical justification for LAR-257. To the extent that the licensees LAR-257 relies on operational parameters of other nuclear plants to justify use of the IARC for the PBNP Unit-1, LAR-257 is flawed and should not be allowed. Furthermore, reliance on the licensees technical justification in LAR-257 could result in leakage of highly radioactive primary water from within the tubes of the PBNP Unit-1 SG to the secondary water inventory of the SGs and ultimately be released into the environment.
- 7. LAR-257 lessens the degree of the margin of safety which would otherwise exist without the amendment.
Specifically, LAR-257 would allow the licensee to operate PBNP Unit-1 at full power despite an in-service inspection which showed SG tubes having a flaw with a circumferential component less than or equal to 203 degrees found in the portion of the tube below 17-inches from the top of the tubesheet and above 1-inch from the bottom of the tubesheet do not require plugging. The operational parameters for the PBNP 2
Affidavit of Thomas Saporito ASLBP No. 08-870-01-LA-BD01 FPL Energy Point Beach, LLC Point Beach Nuclear Plant, Unit-1 Unit-1 could cause any flaws discovered during an in-service inspection which have a circumferential component less than or equal to 203 degrees located in the tube section within 17-inches from the top of the tubesheet and above 1-inch from the bottom of the tubesheet that require plugging. Petitioners further contend that the failure to plug the aforementioned flawed tubes could result in substantial growth of the flaws due to the operational stresses imposed on the flawed tubes and thereby increase any leakage of highly radioactive primary water to the secondary water within the SG and ultimately released into the environment.
- 8. Any overlapped portions of discovered SG tube flaws must be counted individually and additively applied to the total of circumferential components. LAR-257 would allow the licensee to ignore SG tube flaws in tubes found with overlapped portions to the extent that the total of circumferential components is artificially less than the actual and existing circumferential component total. The licensees LAR-257 is technically flawed and could cause a significant amount of highly radioactive primary water to enter the SG secondary water inventory and ultimately be released into the environment.
- 9. Table 4-1 of the licensees LAR-257 does not identify the PBNP Unit-1 as a domestic plant for which the technical justification relied upon by the licensee in LAR-257 was made. Thus, Petitioners contend here that the licensees LAR-257 is technically flawed and could therefore cause highly radioactive primary water to leak from within the PBNP Unit-1 SG tubes to the secondary SG water inventory and ultimately be released into the environment.
3
Affidavit of Thomas Saporito ASLBP No. 08-870-01-LA-BD01 FPL Energy Point Beach, LLC Point Beach Nuclear Plant, Unit-1
/Thomas Saporito/
Thomas Saporito 1030 Military Tr. #25 Jupiter, Florida 33458 State of Florida County of Palm Beach Sworn to (or affirmed) and subscribed before me this 20th day of September, 2008 by Thomas Saporito.
Notary Public - State of Florida 4