Request for Additional Information - Request for Alternative Tank Bottom Design, ASME Code Section XI Repair Requirements, Request Number R 3
ML082630223
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/25/2008
From: Mozafari B
Plant Licensing Branch II
To: Stall J
Florida Power & Light Co
Mozafari B, NRR/ADRO/DORL, 415-2020
References
TAC MD9268
Download: ML082630223 (4)


Text

September 25, 2008 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR ST. LUCIE, UNIT 1, REQUEST FOR ALTERNATIVE TANK BOTTOM DESIGN, ASME CODE SECTION XI REPAIR REQUIREMENTS, REQUEST NUMBER R 3 (TAC NO. MD9268)

Dear Mr. Stall:

By letter to the Nuclear Regulatory Commission (NRC) dated April 9, 2008, Florida Power and Light (FPL) submitted Relief Request 3 for the fourth 10-year inservice inspection (ISI) interval for St. Lucie Unit 1. FPL requested review and approval of Relief Request 3 as a proposed alternative in accordance with paragraph 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations for the fourth ISI interval for St. Lucie Unit 1.

The NRC staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review.

This was discussed with members of the FPL staff on September 18, 2008 and Mr. Ken Frehafer indicated that a response would be provided by October 1, 2008.

If you have any questions, please contact me at (301) 415-2020.

Sincerely,

/RA/

Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335

Enclosure:

Request for Additional Information cc w/encl: See next page

September 25, 2008 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR ST. LUCIE, UNIT 1, REQUEST FOR ALTERNATIVE TANK BOTTOM DESIGN, ASME CODE SECTION XI REPAIR REQUIREMENTS, REQUEST NUMBER R 3 (TAC NO. MD9268)

Dear Mr. Stall:

By letter to the Nuclear Regulatory Commission (NRC) dated April 9, 2008, Florida Power and Light (FPL) submitted Relief Request 3 for the fourth 10-year inservice inspection (ISI) interval for St. Lucie Unit 1. FPL requested review and approval of Relief Request 3 as a proposed alternative in accordance with paragraph 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations for the fourth ISI interval for St. Lucie Unit 1.

The NRC staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review.

This was discussed with members of the FPL staff on September 18, 2008 and Mr. Ken Frehafer indicated that a response would be provided by October 1, 2008.

If you have any questions, please contact me at (301) 415-2020.

Sincerely,

/RA/

Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsOgcRp RidsNrrDorlDpr LPL2-2 R/F RidsAcrsAcnw&mMailCenter RidsNrrDciCvib RidsNrrPMBMozafari RidsRgn2MailCenter JPaige RidsNrrLABClayton (Hard Copy) RidsNrrDorlLpl2-2 ADAMS Accession Number: ML082630223 OFFICE LPL2-2/PE LPL2-2/PM LPL2-2/LA CVIB/BC LPL2-2/BC NAME JPaige BMozafari BClayton MMitchell by memo TBoyce dtd DATE 09/24/08 09/25/08 09/23/08 08/12/2008 09/25/08 OFFICIAL RECORD COPY

Florida Power and Light Company ST. LUCIE PLANT cc: Mr. Christopher R. Costanzo Plant General Manager Mr. Mano Nazar St. Lucie Nuclear Plant Senior Vice President 6351 South Ocean Drive and Nuclear Chief Operating Officer Jensen Beach, Florida 34957 Florida Power & Light Company P.O. Box 14000 Mr. Terry Patterson Juno Beach, FL 33408 Licensing Manager St. Lucie Nuclear Plant Senior Resident Inspector 6351 South Ocean Drive St. Lucie Plant Jensen Beach, Florida 34957 U.S. Nuclear Regulatory Commission P.O. Box 6090 Don E. Grissette Jensen Beach, Florida 34957 Vice President, Nuclear Operations, South Region Craig Fugate, Director Florida Power & Light Company Division of Emergency Preparedness P.O. Box 14000 Department of Community Affairs Juno Beach, FL 33408-0420 2740 Centerview Drive Tallahassee, Florida 32399-2100 Mr. Abdy Khanpour Vice President - Engineering Support M. S. Ross, Managing Attorney Florida Power & Light Company Florida Power & Light Company P.O. Box 14000 P.O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408-0420 Mr. J. Kammel Marjan Mashhadi, Senior Attorney Radiological Emergency Florida Power & Light Company Planning Administrator 801 Pennsylvania Avenue, NW. Department of Public Safety Suite 220 6000 Southeast Tower Drive Washington, DC 20004 Stuart, Florida 34997 Mr. Douglas Anderson Mark E. Warner County Administrator Vice President, Nuclear Plant support St. Lucie County Florida Power & Light Company 2300 Virginia Avenue P.O. Box 14000 Fort Pierce, Florida 34982 Juno Beach, FL 33408-0420 Mr. William A. Passetti, Chief Peter Wells, Acting VP, Nuclear Department of Health Training and Performance Improvement Bureau of Radiation Control Florida Power & Light Company 2020 Capital Circle, SE, Bin #C21 P.O. Box 14000 Tallahassee, Florida 32399-1741 Juno Beach, FL 33408-0420 Mr. Gordon L. Johnston Mr. Michael Page Site Vice President Acting Operations Manager St. Lucie Nuclear Plant St. Lucie Nuclear Plant 6351 South Ocean Drive 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Jensen Beach, Florida 34957-2000

REQUEST FOR ADDITIONAL INFORMATION ST. LUCIE NUCLEAR PLANT, UNIT 1 INSERVICE INSPECTION PLAN FOURTH TEN-YEAR INTERVAL RELIEF REQUEST 3 TAC NO. MD9268 The NRC staff has reviewed the information provided by Florida Power & Light Company (the licensee) for St. Lucie, Unit 1 in its letter dated April 9, 2008, and has determined that additional information is necessary to complete the review of Request for Alternative Relief Request 3.

Based on the staff=s review, please provide a response that addresses the following request for additional information questions.

1. It appears that the only tests and inspections ever done on this lining have been remote visual and hands-on visual examinations. What measures have been taken to ensure that leakage has not occurred through the lining due to small defects in the liner? Has any type of electrical continuity test, to detect small defects in the coating, been performed to ensure that leakage from the tank has not occurred and possibly undermined the sand layer supporting the bottom of the tank?
2. Since the aluminum tank wall is a structural, load-carrying element of the tank, what is the condition of the tank at the aluminum/liner interface? What is the condition of the tank wall under the liner?
3. Does the manufacturer of the tank liner material have a projected lifetime for the liner in the specific medium that the liner can be exposed to and what is that lifetime? Based on operational experience with this liner material (in particular, experience with use of this liner material in environments similar to the St. Lucie, Unit 1 storage tank), what is the expected lifetime of this liner?
4. In reference to the discolored areas on the liner discussed in Paragraph 5.1.1 and other places in the relief request, how has it been confirmed that this discoloration is not from oil or other fluids leaking into the tank from below that tank?