September 25, 2008 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR ST. LUCIE, UNIT 1, REQUEST FOR ALTERNATIVE TANK BOTTOM DESIGN, ASME CODE SECTION XI REPAIR REQUIREMENTS, REQUEST NUMBER R 3 (TAC NO. MD9268)
Dear Mr. Stall:
By letter to the Nuclear Regulatory Commission (NRC) dated April 9, 2008, Florida Power and Light (FPL) submitted Relief Request 3 for the fourth 10-year inservice inspection (ISI) interval for St. Lucie Unit 1. FPL requested review and approval of Relief Request 3 as a proposed alternative in accordance with paragraph 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations for the fourth ISI interval for St. Lucie Unit 1.
The NRC staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review.
This was discussed with members of the FPL staff on September 18, 2008 and Mr. Ken Frehafer indicated that a response would be provided by October 1, 2008.
If you have any questions, please contact me at (301) 415-2020.
Sincerely,
/RA/
Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335
Enclosure:
Request for Additional Information cc w/encl: See next page
September 25, 2008 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR ST. LUCIE, UNIT 1, REQUEST FOR ALTERNATIVE TANK BOTTOM DESIGN, ASME CODE SECTION XI REPAIR REQUIREMENTS, REQUEST NUMBER R 3 (TAC NO. MD9268)
Dear Mr. Stall:
By letter to the Nuclear Regulatory Commission (NRC) dated April 9, 2008, Florida Power and Light (FPL) submitted Relief Request 3 for the fourth 10-year inservice inspection (ISI) interval for St. Lucie Unit 1. FPL requested review and approval of Relief Request 3 as a proposed alternative in accordance with paragraph 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations for the fourth ISI interval for St. Lucie Unit 1.
The NRC staff has reviewed your submittal and finds that the additional information contained in the enclosed Request for Additional Information is needed before we can complete the review.
This was discussed with members of the FPL staff on September 18, 2008 and Mr. Ken Frehafer indicated that a response would be provided by October 1, 2008.
If you have any questions, please contact me at (301) 415-2020.
Sincerely,
/RA/
Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsOgcRp RidsNrrDorlDpr LPL2-2 R/F RidsAcrsAcnw&mMailCenter RidsNrrDciCvib RidsNrrPMBMozafari RidsRgn2MailCenter JPaige RidsNrrLABClayton (Hard Copy)
RidsNrrDorlLpl2-2 ADAMS Accession Number: ML082630223 OFFICE LPL2-2/PE LPL2-2/PM LPL2-2/LA CVIB/BC LPL2-2/BC NAME JPaige BMozafari BClayton MMitchell by memo dtd TBoyce DATE 09/24/08 09/25/08 09/23/08 08/12/2008 09/25/08 OFFICIAL RECORD COPY
Florida Power and Light Company ST. LUCIE PLANT cc:
Mr. Mano Nazar Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, Florida 34957 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW.
Suite 220 Washington, DC 20004 Mr. Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000 Mr. Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Mr. Terry Patterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Don E. Grissette Vice President, Nuclear Operations, South Region Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Abdy Khanpour Vice President - Engineering Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 Southeast Tower Drive Stuart, Florida 34997 Mark E. Warner Vice President, Nuclear Plant support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Peter Wells, Acting VP, Nuclear Training and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Michael Page Acting Operations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000
REQUEST FOR ADDITIONAL INFORMATION ST. LUCIE NUCLEAR PLANT, UNIT 1 INSERVICE INSPECTION PLAN FOURTH TEN-YEAR INTERVAL RELIEF REQUEST 3 TAC NO. MD9268 The NRC staff has reviewed the information provided by Florida Power & Light Company (the licensee) for St. Lucie, Unit 1 in its "L-2008-076, Extension Request Regarding the Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Systems|letter dated April 9, 2008]], and has determined that additional information is necessary to complete the review of Request for Alternative Relief Request 3.
Based on the staff=s review, please provide a response that addresses the following request for additional information questions.
- 1.
It appears that the only tests and inspections ever done on this lining have been remote visual and hands-on visual examinations. What measures have been taken to ensure that leakage has not occurred through the lining due to small defects in the liner? Has any type of electrical continuity test, to detect small defects in the coating, been performed to ensure that leakage from the tank has not occurred and possibly undermined the sand layer supporting the bottom of the tank?
- 2.
Since the aluminum tank wall is a structural, load-carrying element of the tank, what is the condition of the tank at the aluminum/liner interface? What is the condition of the tank wall under the liner?
- 3.
Does the manufacturer of the tank liner material have a projected lifetime for the liner in the specific medium that the liner can be exposed to and what is that lifetime? Based on operational experience with this liner material (in particular, experience with use of this liner material in environments similar to the St. Lucie, Unit 1 storage tank), what is the expected lifetime of this liner?
- 4.
In reference to the discolored areas on the liner discussed in Paragraph 5.1.1 and other places in the relief request, how has it been confirmed that this discoloration is not from oil or other fluids leaking into the tank from below that tank?