MONTHYEARML24267A2552024-09-23023 September 2024 Change in the NRC Project Manager for the West Valley Demonstration Project IR 05000201/20240012024-05-0808 May 2024 West Valley Demonstration Project - Nuclear Regulatory Commission Monitoring Visit Report 05000201/2024001 ML23229A4712023-08-17017 August 2023 Change in the NRC Project Manager for the West Valley Demonstration Project IR 05000201/20230012023-03-28028 March 2023 West Valley Demonstration Project - U.S. Nuclear Regulatory Commission Monitoring Visit Report No. 05000201/2023001 ML23038A0402023-03-15015 March 2023 New York State Energy Research and Development Authority Results of a Teleconference to Discuss Disposition of Historical Records Related to the Former Nuclear Fuel Services, Inc ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000201/20220032022-12-0606 December 2022 West Valley Demonstration Project - U.S. Nuclear Regulatory Commission Monitoring Visit Report No. 05000201/2022003 IR 05000201/20220022022-09-28028 September 2022 West Valley Demonstration Project - U.S. Nuclear Regulatory Commission Monitoring Visit Report No. 05000201/2022002 IR 05000201/20210012022-08-10010 August 2022 West Valley Demonstration Project: U.S. Nuclear Regulatory Commission Monitoring Visit Report Nos. 05000201/2021001 and 05000201/2022001 ML22180A1892022-06-21021 June 2022 Notification of Temporary Change in Radiation Safety Officer Position for New York State Energy Research and Development Authoritys Radiation Protection Program for the Retained Premises of the Western New York Nuclear Service Center ML22145A2972022-05-0202 May 2022 Letter from J. Dean to M. Pagels, Et Al., West Valley Supplemental Environmental Impact Statement Final Scope Dated 5/2/2022 ML21349B3442021-12-17017 December 2021 U.S. Department of Energy West Valley Demonstration Project - Demolition Readiness of the Main Plant Process Building Decommission and Demolition Plan (Docket No. 50-201 (POOM-032) ML21245A2462021-11-0505 November 2021 NYSERDA Retained Premises Radiation Protection Plan Amendment Package ML21202A2122021-07-15015 July 2021 Response to NRC Letter: Request for Additional Information Regarding the License Amendment to Incorporate Updated Retained Premises Radiation Protection Requirements (EPID L-2020-LLA-0029), Dated June 3, 20 ML21118A0762021-06-0303 June 2021 NYSERDA - Request for Additional Information Regarding the License Amendment to Incorporate Updated Retained Premises Radiation Protection Requirements ML21126A0232021-04-27027 April 2021 Us Dept. of Energy, West Valley Demonstration Project, Air Dispersion Modeling Performed in Support of West Valley Demonstration Project (Wvdp) Main Plant Process Building (Mppb) Demolition Preparations ML21105A3522021-04-0505 April 2021 Notification of Change in Radiation Safety Officer for the New York State Energy Research and Development Authority'S Radiation Protection Program for the Retained Premises of the Western New York Nuclear Service Center ML21012A3072020-12-15015 December 2020 Responses to NRC Comments on the West Valley Demonstration Project Main Plant Process Building Decommissioning & Demolition Work Plan, Revision 4 ML21012A2992020-12-14014 December 2020 West Valley Supplemental Environmental Impact Statement Schedule and Probabilistic Performance Assessment Technical Discussions IR 05000201/20200022020-11-0202 November 2020 U. S. Nuclear Regulatory Commission Monitoring Visit Report No. 05000201/2020002, West Valley Demonstration Project, West Valley, New York ML20311A2002020-10-28028 October 2020 Response to NRC Letter: Initial Review for NYSERDA Request for License Amendment: Retained Premises Radiation Protection Requirements (LAR-20-001), Dated March 11, 2020 (EPID L-2020-LLA-0023), Dated March 30, 2020 ML20261H5452020-09-24024 September 2020 Change in the NRC Project Manager for the West Valley Demonstration Project ML20268B2372020-09-24024 September 2020 Change in the NRC Project Manager for the West Valley Demonstration Project ML20265A3552020-09-22022 September 2020 Comments on Rev.4 Main Plant Process Building Demolition & Decommissioning Plan ML20115E4972020-04-27027 April 2020 Second Round of Comments on U.S. Department of Energy West Valley Demonstration Project'S Final Study Document: Vitrification Facility Air Emissions During Open-Air Demolition, Measured Vs Predicted, WVDP-579, Rev. 0 (Docket No. 05000201 (P ML20084G6412020-03-30030 March 2020 Letter, A.Snyder to P. Bembia, NYSERDA, Initial Review for NYSERDA Request for License Amendment: Retained Premises Radiation Protection Requirements (LAR-20-001), Dated March 11, 2020 ML20076C3102020-03-11011 March 2020 Resubmittal of Request for License Amendment: Retained Premises Radiation Protection Requirements ML20055E0492020-02-19019 February 2020 Response to Comments on U.S. DOE, Wvdp Air Study IR 05000201/20200012020-02-10010 February 2020 U.S. Nuclear Regulatory Commission Monitoring Visit Report 05000201/2020001, West Valley Demonstration Project, West Valley, New York ML20042D4972020-02-0606 February 2020 Western New York Nuclear Service Center - Request for License Amendment: Retained Premises Radiation Protection Requirements (LAR-20-001) ML19319A2932019-12-0404 December 2019 Comments on U.S. Department of Energy West Valley Demonstration Project Final Study Document: Vitrification Facility Air Emissions During Open-Air Demolition, Measured Vs Predicted, WVDP-579 ML19267A2102019-09-12012 September 2019 U.S. Department of Energy West Valley Demonstration Project Main Plant Process Building Decommissioning & Demolition Plan, WVDP-586, Revision 3 ML20265A3952019-06-19019 June 2019 June 19, 2019 Letter from Brian C. Bower to Amy Snyder, West Valley Main Plant Process Building, Rev. 3 IR 05000201/20190012019-06-18018 June 2019 U.S. Nuclear Regulatory Commission Monitoring Visit Report 05000201/2019001, West Valley Demonstration Project, West Valley, Ny ML19149A2362019-05-30030 May 2019 NRC Response Letter to DOE-WVDP on the Main Process Plant Demolition Work Plan ML19149A5552019-05-28028 May 2019 Vaughan Letter on CSM Corrections Needed - 5-28-19 ML18282A5232018-11-0707 November 2018 NRC Response to Nyserda'S Requests for Clarification of License Responsibility ML18290A5662018-11-0101 November 2018 Response to NYSERDA 10 CFR 50.59 Evaluation IR 05000201/20180022018-10-25025 October 2018 U. S. Nuclear Regulatory Commission Monitoring Visit Report No. 05000201/2018002, West Valley Demonstration Project, West Valley, New York ML18262A2542018-09-12012 September 2018 NYSERDA Letter Dated September 12, 2018 Requesting Clarification License Responsibility ML18236A3882018-08-27027 August 2018 U.S. Department of Energy West Valley Demonstration Project Main Plant Process Building Decommissioning & Demolition Plan, WVDP-586, Revision 1, Dated February 27, 2017 ML18179A3992018-07-26026 July 2018 Response Letter - the U.S. Army Corps of Engineers Buffalo District Design - Level Sediment Sampling and Analysis Plan - Springville Dam and Cattaraugus Creek Sediment Sampling, Dated April 2018 ML18222A2192018-06-19019 June 2018 NRC Solar Letter IR 05000201/20180012018-06-0707 June 2018 U.S. Nuclear Regulatory Commission Monitoring Visit Report No. 05000201/2018001. West Valley, Demonstration Project, West Valley, New York ML18192C1592018-05-0202 May 2018 May 2, 2018 Letter from NYSERDA Regarding Conforming CSF-1 to Current Site Conditions ML18087A6662018-04-0909 April 2018 Cover Letter TER for Wvnsnsc Off-Site Evaluation IR 05000201/20170012018-02-22022 February 2018 U.S. Nuclear Regulatory Commission Monitoring Visit Report No. 05000201/2017001, West Valley Demonstration Project, West Valley, New York ML18092A0562018-02-0505 February 2018 U.S. Department of Energy West Valley Demonstration Project (DOE-WVDP) Responses to U.S. Nuclear Regulatory Commission (NRC) Comments on DOE-WVDP Main Plant Process Building (Mppb) Decommissioning & Demolition (D&D) Plan ML17347A1252018-01-16016 January 2018 Letter to Us Army Corps of Engineers - NRC Comments on Springville Dam Sampling and Analysis Plan ML17270A1192017-09-28028 September 2017 NRC Comments on the U.S. DOE West Valley Demonstration Project Main Plant Process Building Decommissioning & Demolition Plan, WVDP-586, Revision 1 (Docket No. 05000201 (POOM-032) 2024-09-23
[Table view] |
Text
Department of Energy West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 14171-9799 September 5, 2008 Mr. Keith I. McConnell, Deputy Director Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs United States Nuclear Regulatory Commission Washington, D.C. 20555-0001
SUBJECT:
Response to the Additional U.S. Nuclear Regulatory Commission Staff Review of the Cover Design for the Nuclear Regulatory Commission Licensed Disposal Area
REFERENCES:
- 1) Letter (99363), K. 1. McConnell to B. C. Bower, "Additional U.S. Nuclear Regulatory Commission Staff Review of the Cover Design for the Nuclear Regulatory Commission Licensed Disposal Area at West Valley, New York," dated May 30, 2008
- 2) Letter CRR:98235- 439, B. C. Bower to K. 1. McConnell, "U.S.
Department of Energy (DOE) Supplemental Response to U.S. Nuclear Regulatory Commission (NRC) Comments on 30% Design for the Nuclear Regulatory Commission Licensed Disposal Area (NDA) Cap and Slurry Wall," dated November 6, 2007
Dear Mr. McConnell:
The U.S. Department of Energy West Valley Demonstration Project (DOE-WVDP) appreciates the reviews and comments received from the NRC staff on the NDA Cap and Slurry Wall Project, Your staff indicated that they consider that there are "no imminent risks or hazards posed by the current design," and have provided suggestions that would enhance performance of the facility (Reference 1). To that end, the following is in response to these suggestions.
As you are aware, NRC guidance NUREG 1623 was created to address permanent installations while the NDA Cap and Slurry Wall project is a relatively "short term," 30-year installation being implemented under the Resource Conservation and Recovery Act (RCRA) Corrective Action program as an Interim Measure, not a final remedy. As such, it is felt that some requirements of NUREG 1623 are overly restrictive for our project.
Regarding rock quality, DOE-WVDP agrees that specifying the rock specific density alone could allow for poor rock quality. Therefore, we will add a maximum adsorption requirement to the riprap to maintain the absorption below 0.80%. Additionally, we have been working with the U.S. Army Corps of Engineers (USACE) who have been utilizing local quarries for riprap on many of their long-term shore and stream bank protection projects in and around Western New York. Enclosed is information provided by USACE personnel regarding available rock from local quarries. It is our intent to utilize local quarries for the rock specified in this project.
Mr. Keith 1. McConnell September 5, 2008 Regarding rock placement, it is DOE-WVDP's belief that the New York State Department of Transportation (NYSDOT) Section 620 requirements were not employed in the current (existing) rock placement. We believe that there is little value in testing the existing rock in the ravine leading from the NDA to Erdman Brook. This rock will be covered with the newly placed rock which will meet the above rock quality specifications. Due to the slope, limited access, and safety issues, the stone gradation, thickness, and placement will be performed to the current NYSDOT Section 620 specifications per a future revision to existing construction documents.
Regarding rock gradations and testing, construction specifications will be revised to incorporate specified rock gradation and gradation testing. Gradation will be specified per the local conditions based on the 30-year design life of the installation for the RCRA Interim Measure and modeled hydrologic response to /2of the Probable Maximum Precipitation (PMP) (Reference 2).
Regarding NRC's suggestions for flood protection, the rock size that will be specified for the lower portion of the slope leading to Erdman Brook. The rock will be compatible with erosion protection requirements and assure prevention of undermining of the riprap covered slope.
Based on review of the topography leading to Erdman Brook, there is limited space for a flat run-out before the water monitoring station. Rock size will be specified to minimize the potential for erosion (e.g., gullying and head-cut concerns) over the 30-year design life of this RCRA Interim Measure. Toe protection will be provided by the placement of a sufficient quantity of launchable stone to stabilize erosion.
Upon completion of the NDA cap and slurry wall project, as-built design drawings and specifications will be issued and available for the evaluation and assessment for the future long-term performance and designs.
Should you have any questions, please contact Ms. Moira Maloney of my staff at (716) 942-4255.
Sinrely,
/( C. Bower, Director West Valley Demonstration Project
Enclosure:
USACE Table, DOE WVDP Riprap Needs for NDA Floodway & Outfall to Erdman Brook cc: P. Gardina, EPA, w/enc.
G. Baker, NYSDOH, w/enc.
P. Concannon, NYSDEC, w/enc.
P. J. Bembia, NYSERDA, AC-NYS, w/enc.
D. Garber, WVES, WV-ADM, w/o enc.
J. R. Gerber, WVES, AC-ESHQ, w/o enc.
K. K. Gupta, WVES-AC-WDP, w/enc.
D. C. Meess, WVES, AC-WDP, w/enc.
MPK:99737 - 439
DOE WVOP Riprap Needs for NDA Floodway & Outfall to Erdmann Brook Quarry Samples Lithology Specific Gravlty Absorption % Sodium Sulfate % [a] UA Abrasion (100 revs) % [bJ Schmidt Hammer (-I Weathering Idl Range from NUREG Table D-1:
Upper Range for Fair to Good Medium to Massive Bedding - Non-arillaceous 2.60- 2.75 0,10- 0.67 1.0- 6.7 1.0- 6.7 54-70 -
Frontier Ouarry Ledgerock Shaty Dolomite to Shaly Argillaceous Dolomite 2.79- 2.81 0.24- 0.44 - - 0.35 (80 cycles)
(now LaFarge Lockport) Dolomite to Dolomitic Limestone 2.61 - 2.66 0.53- 0.77 - - 0.083 - 0.53 (80 cycles)
Dolomite 2.62-2.80 0.26- 1.93 - 22.3 - 0.33 (80 cycles)
Niagara Stone Lockport Dolomite 2.64-2.72 1.07 - 1.51 - - - 0.024 80 cycles)
Genstar Stone Products Lockport Dolomite 2.67 0.846 ý 1.16 - - - 0.099 - 0.322 (80 cycles)
Buffalo Crushed Stone Onondaga Limestone (with Chert) 2.69 -2.71 0.10-0.70 - 19.1 - -
Buffalo Slag Company Onondaga Limestone (with Chenl) 2.64- 2.70 0.034 - 0.21 - 18 - 0.0116 -0.50 (80 cycles)
NOTES:
a - Lockport Dolomite can emit sulfury odor when cru*hed and associated groundwater can extlibity surfury odor from sulfate reducing baderia; the presence of sodium sulfate is assured at unknown levels.
b - Only one test result was available for each quarry with most reporting insignificant to minor slaking; all samples were found acceptable for streambank armor stone applications.
c - These local rock formations ar highly resistaent to impact at Schnidt Hammer scales, especially since several members are thick bedded and crystaline rock d - Test is similar to UA Abras*on; all samples were found acceptable for streambank armor stone applications and likely this interim remedy.