ML082490124

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination - 05000250-09-301 and 05000251-09-301
ML082490124
Person / Time
Site: Turkey Point  
Issue date: 09/05/2008
From: Widmann M
Division of Reactor Safety II
To: Stall J
Florida Power & Light Co
References
Download: ML082490124 (8)


See also: IR 05000250/2009301

Text

September 5, 2008

Mr. J. Art Stall

Senior Vice President Nuclear and Chief Nuclear Officer

Florida Power and Light Company

St. Lucie Nuclear Plant

P.O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION - 05000250/2009301 AND

05000251/2009301

Dear Mr. Stall:

In a telephone conversation on September 03, 2008, between Mr. James Conder, Operations

Initial License Supervisor, and Mr. Gerard W. Laska, Senior Operations Examiner,

arrangements were made for the administration of licensing examinations at the Turkey Point

Nuclear Plant. The Operating Test is scheduled to be administered during the weeks of

February 23, and March 2, 2009. The written examination is scheduled to be administered the

week of March 9, 2009. The on-site preparatory week is scheduled for the week of

February 2, 2009.

As agreed during the meeting, your staff of the will prepare the operating test and the written

examinations based on the guidelines in Revision 9, Supplement 1 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U. S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by December 8, 2008. The operating tests, written examinations, and the supporting

reference materials identified in Attachment 2 of ES-201 will be due by January 5, 2009. The

written examination outline was previously provided to your staff on August 19, 2008. Pursuant

to 10 CFR 55.40(b) (3), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

FP&L

2

In order to conduct the requested written examinations and operating test, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on

June 30, 2009. The public reporting burden for this collection of information is estimated to

average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and

maintaining the data needed, writing the examinations, and completing and reviewing the

collection of information. Send comments on any aspect of this collection of information,

including suggestions for reducing the burden, to the Information and Records Management

Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington,

DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html

http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

FP&L

3

Thank you for your cooperation in this matter. Mr. Conder has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Gerry Laska at (404) 562-4626, (Internet E-mail:

gwl1@nrc.gov), or me at (404) 562-4550, (Internet E-mail: mtw@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-250, 50-251

License Nos.: DPR-31, DPR-41

(cc: w/encl - See Page 4)

FP&L

4

cc w/encl:

William Jefferson, Jr.

Site Vice President

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Don E. Grissette

Vice President, Nuclear Operations - South

Region

Florida Power & Light Company

Electronic Mail Distribution

Michael Kiley

Plant General Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Abdy Khanpour

Vice President

Engineering Support

Florida Power and Light Company

Electronic Mail Distribution

M. S. Ross

Managing Attorney

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi

Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

William A. Passetti

Chief

Florida Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Alejandro Sera

Emergency Management Coordinator

Miami-Dade County

Electronic Mail Distribution

Craig Fugate

Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

Mano Nazar

Senior Vice President and Nuclear Chief

Operating Officer

Florida Power & Light Company

Electronic Mail Distribution

Peter Wells

(Acting) Vice President, Nuclear

Training and Performance Improvement

Florida Power and Light Company

P.O. Box 14000

Juno Beach, FL 33408-0420

Mark E. Warner

Vice President

Nuclear Plant Support

Florida Power & Light Company

Electronic Mail Distribution

Senior Resident Inspector

Turkey Point Nuclear Generating Station

U.S. Nuclear Regulatory Commission

9760 SW 344th St.

Florida City, FL 33035

Attorney General

Department of Legal Affairs

The Capitol PL-01

Tallahassee, FL 32399-1050

Mike A. Shehadeh, P.E.

City Manager

City of Homestead

Electronic Mail Distribution

County Manager of Miami-Dade County

111 NW 1st Street, 29th Floor

Miami, FL 33128

Florida Power and Light Company

ATTN: Mr. Ronald Barnes

Training Manager

Turkey Point Nuclear Plant

9760 SW 344th Street

Homestead, FL 33035

FP&L

5

Letter to J. Art Stall from Malcolm T. Widmann dated September 5, 2008

SUBJECT:

TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION - 05000250/2009301 AND

05000251/2009301

Distribution w/encl:

RIDSNRRDIRS

PUBLIC

B. Mozafari, NRR (PM: STL, TP)

September 5, 2008

Mr. J. Art Stall

Senior Vice President Nuclear and Chief Nuclear Officer

Florida Power and Light Company

St. Lucie Nuclear Plant

P.O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION - 05000250/2009301 AND

05000251/2009301

Dear Mr. Stall:

In a telephone conversation on September 03, 2008, between Mr. James Conder, Operations

Initial License Supervisor, and Mr. Gerard W. Laska, Senior Operations Examiner,

arrangements were made for the administration of licensing examinations at the Turkey Point

Nuclear Plant. The Operating Test is scheduled to be administered during the weeks of

February 23, and March 2, 2009. The written examination is scheduled to be administered the

week of March 9, 2009. The on-site preparatory week is scheduled for the week of

February 2, 2009.

As agreed during the meeting, your staff of the will prepare the operating test and the written

examinations based on the guidelines in Revision 9, Supplement 1 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U. S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by December 8, 2008. The operating tests, written examinations, and the supporting

reference materials identified in Attachment 2 of ES-201 will be due by January 5, 2009. The

written examination outline was previously provided to your staff on August 19, 2008. Pursuant

to 10 CFR 55.40(b) (3), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

FP&L

2

In order to conduct the requested written examinations and operating test, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on

June 30, 2009. The public reporting burden for this collection of information is estimated to

average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and

maintaining the data needed, writing the examinations, and completing and reviewing the

collection of information. Send comments on any aspect of this collection of information,

including suggestions for reducing the burden, to the Information and Records Management

Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington,

DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html

http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

_________________________

XG SUNSI REVIEW COMPLETE

OFFICE

RII:DRS

RII:DRS

SIGNATURE

/RA/

/RA/

NAME

Gerard Laska

Malcolm Widmann

DATE

09/03/2008

09/05/2008

9/ /2008

9/ /2008

9/ /2008

9/ /2008

9/ /2008

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO