L-HU-08-019, Request for Continuation of NRC Reviews for Nuclear Management Co. Submittals on the Docket as of September 22, 2008

From kanterella
(Redirected from ML082470648)
Jump to navigation Jump to search

Request for Continuation of NRC Reviews for Nuclear Management Co. Submittals on the Docket as of September 22, 2008
ML082470648
Person / Time
Site: Monticello, Prairie Island  
(DPR-022, DPR-042, DPR-060, SNM-2506)
Issue date: 09/03/2008
From: Koehl D
Nuclear Management Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-HU-08-019
Download: ML082470648 (2)


Text

NE>

Committed to Nudear Excellence September 3,2008 ATTN: Document Control Desk U.S. Nuclear Regulatory Commissi~n Washington, D.C. 20555-0001 Prairie lsland Nuclear Generating Plant, Units 1 and 2 Dockets 50-282, 50-306 and 72-1 0 License Nos. DPR-42 and DPR-60 L-HU- 08-01 9 10 CFR 50.80, 50.90 10 CFR 72.50, 72.56

~on'ticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 Prairie lsland lndependent Spent Fuel Storage Installation Docket 72-1 0 Materials License No. SNM-2506 REQUEST FOR CONTINUATION OF NRC REVIEWS FOR NMC SUBMITTALS ON THE DOCKET AS OF SEPTEMBER 22,2008.

Reference:

1) Letter from NMC to NRC "Application for Order and Conforming License Amendments to Transfer Operating Authority under Facility Operating Licenses DPR-22, DPR-42, DPR-60 and Materials License SNM-2506".

dated April 16,2008. (TAC Nos. MD 8523 through MD 8525 and L24245)

By letter dated April 16, 2008 (Reference I), NMC submitted an application requesting the transfer of operating authority from Nuclear Management Co, LLC (NMC) to Northern States Power Company, a Minnesota corporation (NSPM) for the Monticello Nuclear Generating Plant, Prairie lsland Nuclear Generating Plant and the Prairie lsland lndependent Spent Fuel Storage Installation.

Via this letter, NMC and NSPM are requesting the NRC to continue with the reviews of any and all docketed NMC submittals prior to the effective date of the upcoming NRC Order consenting to the transfer of operating authority. NSPM assumes responsibility for actions and commitments submitted by NMC, beyond the scheduled effective date of September 22,2008.

Summaw of Commitments This letter contains no new commitments or revisions to existing commitments.

414 Nicollet Mall, MP-4 Minneapolis, MN 55401

Document Control Desk Page 2 I declare under the penalty of perjury that the foregoing is true and correct.

Executed on: fb-./.~

Vice President and Chief Nuclear Officer Nuclear Management Company, LLC Officer-Northern States Power Company Cc:

Administrator, USNRC, Region 111 USNRC NRR Project Manager, PlNGP USNRC Senior Resident Inspector, PlNGP USNRC NRR Project Manager MNGP USNRC Senior Resident Inspector, MNGP Director, Spent Fuel Project Office