Surry Inspection / Activity Plan 09/02/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 09:21:42 Report 22 3
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 01/19/2009 01/23/2009 1, 2 7111111B IP 1
EB3ISI
- UNIT 1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 1
7111108P IP 1
EB3SGISI
- UNIT 1 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 05/04/2009 05/08/2009 1
7111108P IP 5
TFPI
- TRIENNIEL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]
06/08/2009 06/12/2009 1, 2 7111105T IP Baseline Inspections Fire Protection [Triennial]
06/22/2009 06/26/2009 1, 2 7111105T IP 4
OL EXAM
- INITIAL EXAM PREP Not Applicable SURRY/NOVEMBER 2009 EXAM AT POWER FACILITIES 06/29/2009 07/02/2009 1
V23314 4
OL EXAM
- INITIAL EXAM - WEEK 1 Not Applicable SURRY/NOVEMBER 2009 EXAM AT POWER FACILITIES 07/20/2009 07/24/2009 1
V23314 3
PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 07/20/2009 07/24/2009 1, 2 2515/175 IP EP Baseline Inspection Exercise Evaluation 07/20/2009 07/24/2009 1, 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 07/20/2009 07/24/2009 1, 2 7111404 IP Baseline Inspections Drill/Exercise Performance 07/20/2009 07/24/2009 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 07/20/2009 07/24/2009 1, 2 71151-EP02 IP Baseline Inspections Alert & Notification System 07/20/2009 07/24/2009 1, 2 71151-EP03 IP 1
PSB1-RP
- TI 2515 GROUND WATER INSPECTION Generic Safety Inspection Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 09/14/2009 09/18/2009 1, 2 2515/173 IP Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09/14/2009 09/18/2009 1, 2 60855.1 IP 2
PSB1-RP
- RP OCCUPATIONAL INSPECTION WK 1 (OUTAGE)
Baseline Inspections Access Control to Radiologically Significant Areas 10/26/2009 10/30/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 10/26/2009 10/30/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/26/2009 10/30/2009 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/26/2009 10/30/2009 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/26/2009 10/30/2009 1, 2 71151-PR01 IP 1
EB3ISI
- UNIT 2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 11/02/2009 11/06/2009 2
7111108P IP 2
PSB1-RP
- RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)
Baseline Inspections Access Control to Radiologically Significant Areas 11/16/2009 11/20/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 11/16/2009 11/20/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 11/16/2009 11/20/2009 1, 2 7112202 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Surry Inspection / Activity Plan 09/02/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 09:21:42 Report 22 5
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 11/30/2009 12/04/2009 1
71152B IP Baseline Inspections Identification and Resolution of Problems 12/14/2009 12/18/2009 1
71152B IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.