UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 2, 2008 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - SURRY POWER STATION
Dear Mr. Christian:
On August 14, 2008, the NRC staff completed its performance review of Surry Power Station, Units 1 and 2 for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use OnlySecurity-Related Information" will include the Physical Protection/Security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Surry Power Station, Units 1 and 2 was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include: TI 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative; and TI 2515/176 Emergency Diesel Generator Technical Specification Surveillance Requirements Regarding Endurance and Margin Testing.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document
X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE
/RA/
/RA/
NAME JDodson MBates DATE 9/ /2008 9/ /2008 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO
VEPCO 3
cc w/encl:
Donald E. Jernigan Site Vice President Virginia Electric and Power Company Electronic Mail Distribution Sonny Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Chris L. Funderburk Director, Nuclear Licensing & Operations Support Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution
VEPCO 4
Distribution w/encl:
S. P. Lingam, NRR Richard Jervey, NRR C. Evans (Part 72 Only)
L. Slack, RII EICS OE Mail (email address if applicable)
RIDSNRRDIRS PUBLIC RidsNrrDirsIpab@nrc.gov Institute of Nuclear Power Operations (INPO)