ML082410187
| ML082410187 | |
| Person / Time | |
|---|---|
| Site: | Callaway (NPF-030) |
| Issue date: | 08/20/2008 |
| From: | Graessle L AmerenUE |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC05538 | |
| Download: ML082410187 (6) | |
Text
AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 August 20, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC05538 WAmerefln UE Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness for Duty Program Performance Data Report for AmerenUE Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for AmerenUE's Callaway Nuclear Plant in accordance with 10CFR26.71(d). This report applies to the period beginning January 1, 2008 and ending June 30, 2008.
The enclosure includes the following:
Attachment A - Fitness For Duty Program Performance Data
- Personnel Subject to 10CFR26
- Breakdown of Confirmed Positive Tests for Specific Substances Attachment B - Fitness For Duty Management Action with regard to:
- Initiatives Taken / Lessons Learned
- Reportable Fitness For Duty Events under IOCFR26.73 If you have questions in regard to the Performance Data Report, please contact me at (573) 676-8129.
Sincerely, Luke H. Graessle Manager, Regulatory Affairs LHG: DSH: KRF: AEE/rmm Enclosure z4 6 _-)/-
Mk a subsidiary of Ameren Corporation
ULNRC05538 August 20, 2008 Page 2 cc:
Mr. Elmo E. Collins, Jr.
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4125 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738
ULNRC05538 August 20, 2008 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed).
Electronic distribution for the following can be made via Other Situations ULNRC Distribution:
A. C. Heflin F. M. Diya T. E. Herrmann L. H. Graessle S. A. Maglio S. L. Gallagher L. M. Belsky (NSRB)
T. B. Elwood Ms. Diane M. Hooper (WCNOC)
Mr. Dennis Buschbaum (TXU)
Mr. Scott Bauer (Palo Verde)
Mr. Stan Ketelsen (PG&E)
Mr. Scott Head (STP)
Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission
ULNRC05538 August 20, 2008 Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92)
AmerenUE Jan 1 - Jun 30, 2008 Company Callaway Plant 6 Months Location Aaron Enloe (573) 676-4300 Contact Name Phone (Include Area Code) 0 Appendix A to 1 OCFR26 Cuttoffs: Screen/Confirmation (ng/ml)
Marijuana Cocaine Opiates 20/
300/
300/
15 150 150 Amphetamines Phencyclidine Alcohol 1000/
250 25/
25
(.04% BAC)
Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 850 216 114 Categories Tested Positive Tested Positive Tested Positive Pre-Access 104 0
0 0
265 1
Post Accident 1
0 1
0 3
0 Observed Behavior 0
0 1
0 0
0 Random 219 0
57 0
31 0
Follow-up 2
0 1
0 9
0 Other 10 0
1 0
9 0
Total 336 0
61 0
317 1
Attachment A Page 1 of 2
ULNRC05538 August 20, 2008 Breakdown of Confirmed Positive Tests for Specific Substances
- Left Side Right Side Record of test results that would have been Positive at the NRC cutoff level.
Record of MRO confirmed positives based on Union Electric's more stringent cutoff level.
Attachment A Page 2 of 2
ULNRC05538 August 20, 2008 Initiatives Taken:
None.
Reportable Fitness For Duty Events Under 10CFR26.73:
None.
Management Actions:
One short term contractor tested positive for Marijuana during a Pre-Access collection. They were denied access to the plant.
Test Results:
Ameren UE Callaway Nuclear Plant performs random testing of the workforce at an annual rate of at least 50% in accordance with 10CFR26.24.a.2. For the six months beginning January 1, 2008 and ending June 30, 2008 random screens were performed at a rate of 26.0% of the population.
Attachment B Page 1 of 1