Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_57, Email from Rick Ennis, Fwd: VY Steam Dryer Crack Info, (April 16, 2004)
ML082340106
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/16/2004
From: Richard Ennis
Office of Nuclear Reactor Regulation
To: Anderson C, Allan Barker, Barrett R, Beckner W, Borchardt R, Scott Burnell, Clifford J, Jocelyn Craig, Dyer J, Charemagne Grimes, Howe A, Imbro E, John Jolicoeur, Kim T, Leeds E, Kamal Manoly, Anthony Mcmurtray, Reis T, Ruland W, Thomas Scarbrough, Diane Screnci, Neil Sheehan, Sheron B, Skay D, Terao D, Wang A, Wu C
NRC/EDO, NRC/FSME, Office of New Reactors, Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response, NRC/OCFO, Office of Public Affairs, Office of Nuclear Regulatory Research, NRC Region 1, NRC/RGN-III
SECY RAS
References
06-849-03-LR, 50-271-LR, Entergy-Intervenor-NEC-JH_57, RAS M-223
Download: ML082340106 (6)


Text

-4kS NrP- 2,7, NEC-JH_57 Rick Ennis - Fwd: VY Steam Dryer Crack Info Paae 11 From: Rick Ennis M' 2 -

To: ýA-4tlan Wang; Allan Barker; Allen Howe; Anthony McMurtray; Brian Sheron; Cheng-Ih Wu; Christopher Grimes; David Terao; Diane Screnci; Donna Skay; Eric Leeds; Gene Imbro; James Clifford; Jim Dyer; John Craig; John Jolicoeur; Kamal Manoty; Neil Sheehan; Richard Barrett; Richard Borchardt; Scott Burnell; Tae Kim; Terrence Reis; Thomas Scarbrough; William Beckner; William Ruland Date: 4116104 1:31PM

Subject:

Fwd: VY Steam Dryer Crack Info Attached is a little more detail on the steam dryer cracking at Vermont Yankee.

CC: Cliff Anderson; David Pelton DOCKETED USNRC August 12, 2008 (11:00am)

OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF US NUMLA RMUIATDR CMMMS"O Docket No.OfcilEhbt OL ý -

OF30b. ApplicaftLcom ense~r P veenqr E.

NBC SWa Ih I

-J" - 0 2-ý -Ds- c)5

CA1FEMP\GW)00001.TMP TMPPaae Paae I11I D

I CAEMP\W)0001 Mail Envelope Properties (40801878.B4F:15: 20516)

Subject:

Fwd: VY Steam Dryer Crack Info 11 Creation Date: 4/16/04 1:31PM From: Rick Ennis Created By: RXE@nrc.gov Recipients Action Date & Time kpl-po.KPDO Delivered 04/16/04 01:3 1PM CJA CC (Cliff Anderson) Opened 04/16104 01:3 1PM DLPI CC (David Pelton) Opened 04/19/04 07:13AM DPS (Diane Screnci) Opened 04/16104 01:53PM NAS (Neil Sheehan) Opened 04116104 01:43PM owfl-po.OWFN_DO Delivered 04/16/04 01:31PM SRB3 (Scott Burnell) Opened 04116/04 01:32PM owf2_po.OWFNW_.DO Delivered 04/16/04 01:31PM ACM2 (Anthony McMurtray) Opened 04/16/04 01:58PM CIWI (Cheng-Ih Wu) Opened 04/17/04 10:14AM DMS6 (Donna Skay) Opened 04/16/04 03:12PM DXT (David Terao) Opened 04/16/04 01:48PM EXI (Gene Ixnbro) Opened 04/21/04 01:46PM KAM (Kamal Manoly)

RJB3 (Richard Barrett) Opened 04/19/04 07:30AM RWB 1 (Richard Borchardt) Opened 04/16/04 02:20PM TGS (Thomas Scarbrough) Opened 04/16/04 01:34PM TXR (Terrence Reis) owf4_po.OWFNDO Delivered 04/16/04 01:3 1PM ABW (Alan Wang) Opened 04/16/04 02:02PM AGHI (Allen Howe) Opened 04/19/04 07:24AM ARB3 (Allan Barker) Opened 04/16/04 01:3 1PM BWS (Brian Sheron) Opened 04/16/04 04:44PM CIG (Christopher Grimes) Opened 04/16/04 01:35PM ETL (Eric Leeds)

JED2 (Jim Dyer) Opened 04/16/04 01:43PM JWC (James Clifford) Opened 04/19/04 09:09AM JWCI (John Craig) Opened 04/16/04 01:32PM TJK3 (Tae Kim) Opened 04116/04 01:40PM WDB (William Beckner) Opened 04/16104 01:32PM WHIR (William Ruland) Opened 04/16/04 01:56PM owf5_po.OWFN_DO Delivered 04/16104 01:31PM

FC:\TEMP\GW}O0001 .TMP Page 21 JRJ1 (John Jolicoeur) Opened 04/19/04 12:16PM Post Office Delivered Route kpl-po.KP_DO 04/16/04 01:3 1PM owfl-po,OWFNDO 04/16104 01:31PM owf2_po,OWFN_DO 04/16/04 01:3IPM owf4_po.OWFNDO 04/16/04 01:31PM owf5.po.OWFNDO 04/16/04 01:31PM Files Size Date & Time Mail MESSAGE 578 04/16/04 01:3 1PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

.1 I1

.1

Rick Ennis -Fwd: VY Steam Dryer Crack Info Page 1 From: Cliff Anderson To: Rick Ennis Date: 4/16/04 12:59PM

Subject:

Fwd: VY Steam Dryer Crack Info fyi

l Rir~k F~nni* V Y Steain Dryer Crack Info Paae1R II VY Steam n-Pr (-rqrk Info Paqe I I From: Raymond Lorson '

To: A. Randolph Blough; Brian Holian; Cliff Anderson; David Pelton; Hubert J. Miller; James Wiggins; Richard Crlenjak; Wayne Lanning Date: 4/16/04 12:11PM

Subject:

VY Steam Dryer Crack Info FYI:

The attached write-up summarizes what we know about the VY steam dryer cracks to date.

Ray

U While performing visual inspections of the reactor vessel steam dryer, Entergy and General Electric personnel identified several indications on both the interior and exterior surfaces of the dryer:

Two external cracks were identified on outer plenum vertical welds (the longest crack was approximately 3 inches in length). The licensee plans to grind out, repair and install additional supports to reinforce these welds; Two internal cracks were identified in the drain channel weld. The longest crack was 14 inches in length. These cracks are inaccessible for repair. The licensee (based on input from GE) believes that they can demonstrate that operation with these cracks is acceptable In addition to the cracks noted above, multiple axial indications were identified on the internal surface of the curved end plate of the dryer vane bank. The licensee has not determined whether these indications are cracks or manufacturing anomalies. The licensee (based on input from GE) believes that they can demonstrate that operation with these Indications is acceptable.

The licensee Is considering a press release on this topic and has indicated that the cracks are In low-stress, low-steam flow, areas of the dryer, and not in the areas affected at the EPU plants.

Region I reviewed the licensee's steam dryer Inspection activities during a scheduled, routine ISI inspection and is continuing to monitor this situation. Similar external weld cracks were identified and repaired earlier this spring at Nine Mile Unit 2.