ML082280104

From kanterella
Jump to navigation Jump to search
Fitness-For-Duty Program Semi-Annual Performance Data Report for January 1, 2008 Through June 30, 2008
ML082280104
Person / Time
Site: Millstone, Kewaunee, Surry, North Anna  Dominion icon.png
Issue date: 08/11/2008
From: Funderburk C
Dominion, Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
08-0499
Download: ML082280104 (28)


Text

Dominion Resources Services, Inc.

'i000 Dominion Boulevard, Glen Allen, VA 2.\(I(,(!

\\eb Address: www.dom.com August 11, 2008 United States Nuclear Regulatory Commission Serial No. 08-0499 Attention: Document Control Desk NLOS/vlh Washington, D. C. 20555-0001 Docket Nos. 50-305 50-245/336/423 50-280/281 50-338/339 License Nos. DPR-43 DPR-21/65 NPF-49 DPR-32/37 NPF-4/7 DOMINION ENERGY KEWAUNEE. INC.

DOMINION NUCLEAR CONNECTICUT. INC.

VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION UNIT 1 MILLSTONE POWER STATION UNITS 1. 2 AND 3 SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 FITNESS-FaR-DUTY PROGRAM SEMI-ANNUAL PERFORMANCE DATA REPORT Enclosed is the Dominion Energy Kewaunee, Inc. (DEK), Dominion Nuclear Connecticut, Inc. (DNC) and Virginia Electric and Power Company (Dominion) Semi-Annual Fitness-For-Duty (FFD) Program Performance Data report for January 1, 2008 through June 30, 2008. This report is submitted pursuant to 10 CFR 26.71 (d). includes summaries of management sanctions imposed, actions completed to improve the program, events reported to the NRC, and our random testing rate. Attachment 2 contains the standard FFD data forms for Innsbrook Technical Center (Corporate), Kewaunee Power Station, Millstone Power Station, North Anna Power Station, Surry Power Station, Westinghouse Electric Company and Institute of Nuclear Power Operations (INPO).

Serial No. 08-0499 Semi-Annual FFD Report page 2 of 3 If you have any questions, please contact Mr. Dave Sommers at (804) 273-2823.

Very truly yours,

'/"'<7 c.-: ;:nde~~rk, ~'i';~ctor Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Dominion Energy Kewaunee, Inc.,

Dominion Nuclear Connecticut, Inc., and Vi rgi nia Electric and Power Company Attach me nts Commitments made in this letter: None cc: U. S. Nuclear Regulatory Commission Attn: Regional Administrator Region I 475 Allendale Road King of Prussia, PA 19406-1415 U. S. Nuclear Regulatory Commission Attn: Regional Administrator Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission Attn: Regional Administrator Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352

Serial No. 08-0499 Semi-Annual FFD Report page 3 of 3 cc: Mr. P. S. Tam U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. S. P. Lingam U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. C. J. Sanders U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. J. B. Hickman U. S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector North Anna Power Station

ATTACHMENT 1

SUMMARY

OF EVENTS AND MANAGEMENT ACTIONS

SUMMARY

OF MANAGEMENT SANCTIONS IMPOSED JANUARY 1 THROUGH JUNE 30, 2008 DOMINION EMPLOYEES RANDOM TESTS (Resulted in denial of unescorted access authorization)

Confirmed positive test for illegal drug 1 CONTRACTOR EMPLOYEES RANDOM TESTS (Resulted in denial of unescorted access authorization.)

Confirmed positive test for illegal drug 4 Confirmed positive test for alcohol 1 PRE-ACCESS TESTS (Resulted in denial of unescorted access authorization.)

Confirmed positive test for illegal drug 20 Confirmed positive for alcohol 2

FOR CAUSE TESTS (Resulted in denial of unescorted access authorization)

Confirmed positive for illegal drug 1 Confirmed positive for alcohol 2 Failure to Cooperate/Refusal to test 1 FOLLOW-UP (Resulted in denial of unescorted access authorization)

Failure to Cooperate/Refusal to Test 1

SUMMARY

OF MANAGEMENT ACTIONS COMPLETED TO IMPROVE THE FFD PROGRAM JANUARY 1 THROUGH JUNE 30, 2008 No significant changes were made to the Fitness for Duty Program during this reporting period.

SUMMARY

OF EVENTS REPORTED TO THE NRC BY DOMINION JANUARY 1 THROUGH JUNE 30, 2008 No events were reported to the NRC during this reporting period

DOMINION RANDOM TESTING RATE JANUARY 1 THROUGH JUNE 30, 2008 Dominion Random Testing Rate: 26.99%

Employees Contractors Innsbrook Technical Center 26.65% 31.25%

Kewaunee Power Station 27.12% 27.64%

Millstone Power Station 26.30% 26.29%

North Anna Power Station 26.09% 25.89%

Surry Power Station 27.72% 30.90%

ATTACHMENT 2 FFD DATA FORMS INNSBROOK TECHNICAL CENTER KEWAUNEE POWER STATION MILLSTONE POWER STATION NORTH ANNA POWER STATION SURRY POWER STATION WESTINGHOUSE ELECTRIC COMPANY INSTITUTE OF NUCLEAR POWER OPERATIONS

Date: 07/14/2008 Page: 1 Time: 8:37 AM Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Dominion Resources Services, Inc. Between Jan 1, 2008 and Jun 30, 2008 INNSBROOK Report Period Cutoffs: Screen I Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04%/0.04%

Testing Results Licensee Employees Contractor Personnel Average Number with Unescorted Access 409 32 Categories Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive FOLLOW-UP 14 0 0 0 FOR-CAUSE OBSERVED BEHAVIOR 0 0 a 0 FOR-CAUSE POST EVENT 0 a 0 0 OTHER 2 0 0 0 PRE-ACCESS 59 0 8 0 PRE-ACCESS RANDOM 0 0 0 0 RANDOM FFD 109 0 10 0 RETURN TO DUTY 0 0 0 a Total 184 0 18 0

Breakdown of Confirmed Positive Tests for Specific Page: 2 Substances INNSBROOK Between Jan 1, 2008 and Jun 30, 2008 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor o o o o o o o Employee o o o o o o o Total o o o o o o o Breakdown of Confirmed Positive Tests for Marijuana

=

(initial screen cut-off level 50 ng/ml)

>=50 ng/ml <100 ng/ml >=100 ng/ml Contractor o o Employee o o Total o o

Date: 07/14/2008 Page: 3 Time: 8:37 AM Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Dominion Energy Kewaunee Between Jan 1, 2008 and Jun 30, 2008 KEWAUNEE Report Period Cutoffs: Screen / Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 100/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04%/0.04%

resting Results Licensee Employees Contractor Personnel Average Number with Unescorted Access 660 474 Categories Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive FOLLOW-UP 46 0 42 0 FOR-CAUSE OBSERVED BEHAVIOR 0 0 2 1 FOR-CAUSE POST EVENT 5 0 10 0 OTHER 2 0 2 0 PRE-ACCESS 53 0 535 1 PRE-ACCESS RANDOM 1 0 6 0 RANDOM FFD 179 0 131 0 RETURN TO DUTY 0 0 0 0 Total 286 0 728 2

Breakdown of Confirmed Positive Tests for Specific Page: 4 Substances KEWAUNEE Between Jan 1, 2008 and Jun 30, 2008 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor o 0 0 0 0 Employee o o o o o o o Total 1 o o 1 o o o Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level = 100 ng/ml)

>=50 ng/ml <100 ng/ml >=100 ng/ml Contractor 0 Employee o o Total o 1

Date: 07/14/2008 Page: 5 Time: 8:37 AM Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Dominion Nuclear Connecticut, Inc. Between Jan 1, 2008 and Jun 30, 2008 MILLSTONE Report Period Cutoffs: Screen I Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 50115 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04%10.04%

Testing Results Licensee Employees Contractor Personnel Average Number with Unescorted Access 1,293 871 Categories Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive FOLLOW-UP 46 0 30 1 FOR-CAUSE OBSERVED BEHAVIOR 0 0 5 2 FOR-CAUSE POST EVENT 3 0 7 0 OTHER 1 0 1 0 PRE-ACCESS 72 0 1,002 15 PRE-ACCESS RANDOM 0 0 17 0 RANDOM FFD 340 0 229 2 RETURN TO DUTY 0 0 0 0 Total 462 0 1,291 20

Breakdown of Confirmed Positive Tests for Specific Page: 6 Substances MILLSTONE Between Jan 1, 2008 and Jun 30, 2008 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor 3 0 6 8 o 2 Employee 0 0 0 o o o o Total 3 0 6 8 1 o 2 Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level = 50 ng/ml)

>=50 ng/ml <100 ng/ml >=100 ng/ml Contractor 3 5 Employee 0 0 Total 3 5

Date 07/14/2008 Page: 7 Time 8:37 AM Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company Between Jan 1, 2008 and Jun 30, 2008 NORTH ANNA Report Period Cutoffs: Screen / Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04%/0.04%

Testing Results Licensee Employees Contractor Personnel Average Number with Unescorted Access 1,012 139 Categories Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive FOLLOW-UP 36 0 2 0 FOR-CAUSE OBSERVED BEHAVIOR 0 0 0 0 FOR-CAUSE POST EVENT 1 0 1 0 OTHER 4 0 1 0 PRE-ACCESS 60 0 107 0 PRE-ACCESS RANDOM 1 0 3 0 RANDOM FFD 264 0 36 0 RETURN TO DUTY 0 0 0 0 Total 366 0 150 0

Breakdown of Confirmed Positive Tests for Specific Page: 8 Substances NORTH ANNA Between Jan 1, 2008 and Jun 30, 2008 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor o o o o o o o Employee o o o o o o o Total o o o o o o o Breakdown of Confirmed Positive Tests for Marijuana (initial screen cut-off level = 50 ng/ml)

>=50 ng/ml <100 ng/ml >=100 ng/ml Contractor o o Employee o o Total o o

Date: 07/14/2008 Page: 9 Time 8:37 AM Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Virginia Electric and Power Company Between Jan 1, 2008 and Jun 30, 2008 SURRY Report Period Cutoffs: Screen I Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04%/0.04%

Testing Results Licensee Employees Contractor Personnel Average Number with Unescorted Access 1,046 356 Categories Number DHHS/NRC Number DHHS/NRC Tested Positive Tested Positive FOLLOW-UP 39 0 27 0 FOR-CAUSE OBSERVED BEHAVIOR 1 0 5 0 FOR-CAUSE POST EVENT 2 0 9 1 OTHER 10 0 2 0 PRE-ACCESS 109 0 447 6 PRE-ACCESS RANDOM 0 0 20 0 RANDOM FFD 290 1 110 3 RETURN TO DUTY 2 0 0 0 Total 453 1 620 10

Breakdown of Confirmed Positive Tests for Specific Page: 10 Substances SURRY Between Jan 1, 2008 and Jun 30, 2008 ALCOHOL AMPHETAMINE COCAINE MARIJUANA OPIATES PHENCYCLIDINE REFUSAL Contractor a 4 5 a a a Employee o o o o o o Total 1 o 4 6 o o o Breakdown of Confirmed Positive Tests for Marijuana

=

(initial screen cut-off level 50 ng/ml)

>=50 ng/ml <100 ng/ml >=100 ng/ml Contractor 3 2 Employee o Total 4 2

Westinghouse Fitness for Duty Program

  • Westinghouse Performance Data Personnel Subject to 10CFR26 Customer: Dominion Generation - Kewaunee Power Station 1 Westinghouse Electric Company LLC 2 June 30, 2008 Company Six months ending 3 P.o. Box 158, BIN 38, Madison, PA 15663 Location 4 Peter J. Defilippi / Victoria R. Pancurak 5 724-722-5721 /5718 Contact Name Phone (include area code) 6 Cutoffs: Screen/Confirmation (ng/ml) II Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04% Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 7 700 0 840 Categories 8 # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 3 0 0 0 0 0 For Post accident 0 0 0 0 0 0 Cause Observed behavior £ 0 0 0 0 0 0 Random 0 0 0 0 0 0 Follow-up
  • 0 0 0 0 0 0 Other 0 0 0 0 0 0 Total 3 0 0 0 0 0 Semi-Annual FFD Report-Dominion Generation I Kewaunee - 1st Period 2008 8/3/2008

Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Adulterants 9 Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 0 0 0 0 0 0 0 0 0 0 0 0 Employees 0 0 0 0 0 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 0 0 0 0 0 o II TOTAL LEGEND 1= Barbiturates 2 =Benzodiazepines 3 =Methadone 4= Methaqualone

£ - These were tests repeated due to specimen suitability (specific gravity and creatinine concentrations) - they were NOT for observed behavior issues.

  • - includes "return to work" tests.

Testing anomalies or unusual occurrences: There were no testing anomalies or unusual occurrences noted during this period.

Semi-Annual FFD Report-Dominion Generation 1 Kewaunee - 151 Period 2008 8/3/2008

Westinghouse Fitness for Duty Program

  • Westinghouse Performance Data Personnel Subject to 10CFR26 Customer: Dominion Nuclear Generation - Millstone Power Station 1 Westinghouse Electric Company LLC 2 June 30, 2008 Company Six months ending 3 P.O. Box 158, BIN 38, Madison, PA 15663 Location 4 Peter J. Defilippi / Victoria R. Pancurak 5 724-722-5721 /5718 Contact Name Phone (include area code) 6 Cutoffs: Screen/Confirmation (ng/ml) Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04% Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 7 700 0 840 Categories 8 # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 0 0 0 0 0 0 For Post accident 0 0 0 0 0 0 Cause Observed behavior £ 0 0 0 0 0 0 Random 0 0 0 0 0 0 Follow-up
  • 0 0 0 0 0 0 Other 0 0 0 0 0 0 Total 0 0 0 0 0 0 Semi-Annual FFD Report-Dominion Generation / Millstone - 1st Period 2008 8/3/2008

Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Adulterants 9 Mariiuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 0 0 0 0 0 0 0 0 0 0 0 0 Employees 0 0 0 0 0 0 0 0 0 0 0 0 Long-Term Contractors 0 0 0 0 0 0 0 0 0 0 0 0 Short-Term Contractors 0 0 0 0 0 0 0 0 0 0 0 0 o II TOTAL LEGEND 1 = Barbiturates 2 = Benzodiazepines 3 = Methadone 4 = Methaqualone

£ - These were tests repeated due to specimen suitability (specific gravity and creatinine concentrations) - they were NOT for observed behavior issues.

  • - includes "return to work" tests.

Testing anomalies or unusual occurrences: There were no testing anomalies or unusual occurrences noted during this period.

Semi-Annual FFD Report-Dominion Generation 1 Millstone _1 st Period 2008 8/3/2008

Westinghouse Fitness for Duty Program

  • Westinghouse Performance Data Personnel Subject to 10CFR26 Customer: Dominion Generation - North Anna and Surry Power Plants 1 Westinghouse Electric Company LLC 2 June 30, 2008 Company Six months ending 3 P.O. Box 158, BIN 38, Madison, PA 15663 Location 4 Peter J. Defilippi 1 Victoria R. Pancurak 5 724-722-5721 15718 Contact Name Phone (include area code) 6 Cutoffs: Screen/Confirmation (ng/ml) Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 300/300 Barbiturates 300/300 Cocaine 300/150 Phencyclidine 25/25 Benzodiazepines 300/300 Opiates 300/300 Alcohol (% BAC) 0.04% Methadone 300/300 Methaqualone 300/300 Westinghouse Long-Term Short-Term Testing Results Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 7 700 0 840 Categories 8 # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 1 0 0 0 0 0 For Post accident 0 0 0 0 0 0 Cause Observed behavior £ 0 0 0 0 0 0 Random 0 0 0 0 0 0 Follow-up
  • 0 0 0 0 0 0 Other 0 0 0 0 0 0 Total 1 0 0 0 0 0 Semi-Annual FFD Report-Dominion Generation 1 North Anna-Surry - 1st Period 2008 8/3/2008

Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Adulterants 9 Mariiuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 0 0 0 0 0 0 0 0 0 0 0 0 Emplovees 0 0 0 0 0 0 0 0 0 0 0 0 Lona-Term Contractors Short-Term Contractors 0 0 0 0 0 0 0 0 a 0 0 0 TOTAL 0 0 0 0 0 0 0 0 a 0 0 0 o II LEGEND 1 =Barbiturates 2 = Benzodiazepines 3 =Methadone

=

4 Methaqualone

£ - These were tests repeated due to specimen suitability (specific gravity and creatinine concentrations) - they were NOT for observed behavior issues.

  • - includes "return to work" tests.

Testing anomalies or unusual occurrences: There were no testing anomalies or unusual occurrences noted during this period.

Semi-Annual FFD Report-Dominion Generation 1 North Anna-Surry -1st Period 2008 8/3/2008

Attachment 1 FITNESS-FOR-DUTY PROGRAM Performance Data Personnel Subject to 10CFR 26 Institute of Nuclear Power Operations 06/30108 COMPANY 6 MONTHS ENDING Atlanta, Georgia LOCATION John Nielsen 770/644-8808 CONTACT NAME PHONE (INCLUDING AREA CODE)

CUTOFFS: SCREEN/CONFIRMATION (ng/ml) TESTING RATE: 50%

ALCOHOL (% BAC) 0.04% COCAINE 300/150 PHENCYCLIDINE 25125 AMPHETAMINES 1000/500 MARIJUANA 100/15 OPIATES 300/300 50/15 TESTING RESULTS PERMANENT EMPLOYEES LOANED EMPLOYEES AVERAGE NUMBER WITH 215.3 57.8 UN ESCORTED ACCESS CATEGORIES TESTED POSITIVE TESTED POSITIVE PRE-ACCESS 37 0 30 0

-n POST 0 0 0 0 0

u ACCIDENT 0

c OBSERVED 0 0 0 0 (f) m BEHAVIOR RANDOM 59 0 13 0 FOLLOW-UP 0 0 0 0 OTHER 6 0 2 0 TOTAL 102 0 45 0 Pa2:e 1 of 2

Attachment 1 RANDOM TEST PROGRAM RESULTS INDIVIDUALS 2004 2005 2006 2007 2008 TESTED Number 1 0 0 0 0 0 0 N/A 0 N/A Positive Number 78 78 78 78 89 76 81 76 72 N/A Negative

% POSITIVE 1.35% N/A N/A N/A N/A N/A N/A N/A N/A N/A GRAPH OF 4

% POSITIVE 3

2 1 <lll lllllllllll 0 1111ll1ll11 11111111111 1111ll1ll11 11111111111 11111111111 1111ll1ll11 11111111111 11111111111 11111111111 1lll]111 ]l1 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES PERMANENT LOANED EMPLOYEES EMPLOYEES TOTAL ALCOHOL 0 0 0 AMPHETAMINES 0 0 0 COCAINE 0 0 0 MARIJUANA 0 0 0 OPIATES 0 0 0 PHENCYCLIDINE 0 0 0 Page 2 of 2