March 18, 2009
Ms. Julie Keys
Nuclear Energy Institute
1776 I Street, NW, Suite 400
Washington, DC 20006-3708
SUBJECT: DRAFT REVISIONS TO THE LICENSE RENEWAL INTERIM STAFF
GUIDANCE PROCESS AND NRC REGULATORY ISSUE SUMMARY 2007-16
Dear Ms. Keys and Other Stakeholders:
The U.S. Nuclear Regulatory Commission (NRC or the staff) is informing you of the opportunity
to provide comments on the staffs Draft License Renewal Interim Staff Guidance (ISG)
LR-ISG-2007-01, entitled License Renewal Interim Staff Guidance Process, Revision 1
(LR-ISG process). The staff also requests comment on a proposed revision to NRC Regulatory
Issue Summary (RIS) 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for
Holders of Renewed Licenses. The proposed revisions to the LR-ISG process and RIS are
enclosed and available in the NRCs Agencywide Documents Access and Management System
(ADAMS), under Accession Nos. ML082180346 and ML083500028, respectively.
Once approved, the revised LR-ISG process will supersede the existing guidance entitled, The
Interim Staff Guidance Process, issued on December 12, 2003 (ML023520620). The proposed
revision includes several updates to the existing ISG process. One update involves enhanced
review and documentation of determinations on the applicability of the provisions of
Section 54.37(b) of Title 10 of the Code of Federal Regulations (10 CFR 54.37(b)), and the
requirements of Section 50.109, Backfitting, of 10 CFR (10 CFR 50.109) to LR-ISGs. This
update addresses recommendations made in a report issued by the NRCs Office of the
Inspector General, OIG-07-A-15, Audit of the NRCs License Renewal Program, dated
September 6, 2007 (ML072490486). Another update involves extending the LR-ISG process to
include certain guidance documents associated with environmental reviews for license renewal
applications. The staff is also proposing to eliminate the previous clarification and
compliance LR-ISG designations. As an alternative, the staff will document the basis for
applicability of 10 CFR 54.37(b) or 10 CFR 50.109 in a proposed new backfitting discussion
section of each LR-ISG. Other updates include administrative changes, such as references to
the NRCs organizational structure.
The staff also identified the need to revise RIS 2007-16 to address recommendations from
OIG-07-A-15. The proposed RIS revision clarifies the requirements of 10 CFR Part 54 and the
role of the LR-ISG process for including newly identified SSCs under 10 CFR 54.37(b).
Enclosed is a Federal Register notice for request of public comment. Please provide your
comments as indicated in the notice. If you have any additional questions on this matter, please
contact Mr. Matthew Homiack of my staff by telephone at 301-415-1683 or by e-mail at
Matthew.Homiack@nrc.gov.
J. Keys -2-
This letter is also being sent to other stakeholders interested in the LR-ISG process, similarly
making them aware of the opportunity to comment on these documents.
Sincerely,
/RA/
Brian E. Holian, Director
Division of License Renewal
Office of Nuclear Reactor Regulation
Enclosures:
As stated
cc w/encls: See next page
ML082180410 (Package); ML082180273 (Letters); ML082180299
(FRN); ML082180346 (Guidance); ML083500028 (Revised RIS 2007)
OFFICE PM:DLR:RPOB LA:DLR BC:DLR:RPOB
NAME MHomiack IKing TTate
DATE 3/18/2009 3/18/2009 3/18/2009
OFFICE BC:DLR:RERB OGC D:DLR
NAME BPham MBaty BHolian
DATE 12/16/2008 12/16/2008 3/18/2009
Letter to: Julie Keys and Other Stakeholders from: Brian Holian, dated: March 18, 2009
SUBJECT: DRAFT REVISIONS TO THE LICENSE RENEWAL INTERIM STAFF
GUIDANCE PROCESS AND NRC REGULATORY ISSUE SUMMARY 2007-16
HARD COPY:
DLR RF
E-MAIL:
PUBLIC
RidsNrrDlr
RidsNrrDlrRpb1
RidsNrrDlrRpb2
RidsNrrDlrRer1
RidsNrrDlrRer2
RidsNrrDlrRerb
RidsNrrDlrRpob
RidsNrrDci
RidsNrrDra
RidsNrrDe
RidsNrrDss
RidsOgcMailCenter
RidsNrrAdes
RidsOpaMail
RidsOcaMailCenter
RConte, RI
GHopper, RII
AStone, RIII
NOKeefe, RIV
MHomiack, NRR
LR-ISG Stakeholders
cc:
Ms. Christine S. Salembier, Commissioner Mr. Garry G. Young
State Liaison Officer Manager, License Renewal Services
Department of Public Service 1448 SR 333, N-GSB-45
112 State Street, Drawer 20 Russellville, AR 72802
Montipelier, VT 05620-2601
Ms. Lorrie Bell, Project Manager
Mr. Frederick W. Polaski Wolf Creek Nuclear Operating Corporation
Manager License Renewal P.O. Box 411
Exelon Corporation Burlington, KS 66839
200 Exelon Way
Kennett Square, PA 19348 Mr. Roger Stewart
Progress Energy Carolinas, Inc.
Mr. Clifford I. Custer 3581 West Entrance Road
Project Manager, License Renewal RNP A9
FirstEnergy Nuclear Operating Company Hartsville, SC 29550
P.O. Box 4
Route 168 (Mail Stop SIM-2) Mr. Michael H. Crowthers, Supervisor
Shippingport, PA 15077 Nuclear Regulatory Affairs
Mr. Paul Gunter, Director Two North Ninth Street (GENPL4)
Reactor Watchdog Project Allentown, PA 18101-1179
Nuclear Information & Resource Service
6930 Carroll Avenue, Suite 340 Mr. Michael A. Balduzzi
Takoma Park, MD 20912 Sr. Vice President & COO
Regional Operations, NE
Mr. Hugh Jackson Entergy Nuclear Operations
Public Citizen's Critical Mass Energy & 440 Hamilton Avenue
Environment Program White Plains, NY 10601
215 Pennsylvania Avenue, SE
Washington, DC 20003 Mr. Ulrich Witte
Northern Lights Engineering, LLC
Mr. Chalmer Myer 71 Edgewood Way
40 Inverness Center Parkway Westville, CT 06515
Post Office Box 1295
Birmingham, AL 35201 Ms. Lisbeth Gronlund, Co-Director
Global Security Program
Ms. Mary Olson Union of Concerned Scientists
Nuclear Information & Resource Service Two Brattle Sq.
Southeast Office Cambridge, MA 02238-9105
P.O. Box 7586
Asheville, NC 28802