FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 4408.1 Mark B. Bezilla Vice President i
440-280-5382 Fax. 440-280-8029 July 8, 2008 PY-CEI/OEPA-0491 L Ohio Environmental Protection Agency Division, of Water Pollution:Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049
SUBJECT:
Perry Nuclear Power Plant, June NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of June 2008. No violations occurred during this period.
If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.
Sincerely,
/
Mark Bezilla
/ ~ (.~\\
Enclosures A Station Code 004 Report B Station Code 094 Report C Station Code 601 Report D Station Code 602 Report E Station' Code 800 Report cc: NRC Region III NRC Resident Inspector NRR Project Manager NRC. Document-Control Desk _(Docket, No. 50-440)
~jŽEi~
Iu~
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 Page 1 of 8 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
3IB00016*ID 004.,
2008-06-01 To: 2008-06-30 CCB 125 Liz Ryan Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day I/Day 2/Week I/Month 1/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-06-01 69 98.0 AH AA 0.05 2008-06-02 67 76.6 AH AA 0.05 2008-06-03 69 96.1 6.78 AA 8.0 8.048 AH AA 0.05 2008-06-04 68 97.1 AH AH 2008-06-05 67 74.8 AH AA 0.05 2008-06-06 72 90.4 8.83 AH AA 0.05 2008-06-07 81 116.4 AH AA 0.05 2008-06-08 76 121.0 AH AA 0.05 2008-06-09 76 125.2 AH AA 0.05 2008-06-10 77 112.1 8.74 AH AA0.05 2008-06-11 76 116.1 AH AA 0.05 2008-06-12 75 124.7 AH 0.06 2008-06-13 74 122.9 8.71 AH AA 0.05 2008-06-14 75 126.0 AH AA 0,05 2008-06-15 75 110.8 AH AA.0.05 2008-06-16 76 131.4 AH AA 0.05 2008-06-17 76 131.1 8.62 AH AA 0.05 2008-06-18 75 135.6 AH AA 0.05 2008-06-19.
74 122.6 AH AA 0.05 2008-06-20 74 132.7 8.57 AH AA 0.05 2008-06-21 75 132.7 AH AA 0.05 2008-06-22 76 135.8 AH AA 0.05 2008-06-23 76 137.5 AN AA 0.05 2008-06-24 76 137.1 8.58 AH AA 0.05 2008-06-25 75 133.3 AH AA 0.05 2008-06-26 76 112.9 AH 0.06 2008-06-27 77 137.7 8.62 AH AA 0.05 2008-06-28 77 145.7 AH AA 0.05 2008-06-29 75 149.0 AH AA 0.05 2008-06-30 73 149.1 AH AA 0.05 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Represgntative VP)- Jucd lfneignificantd imprisonmenties for submitting false information, including the possibility of When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 1 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
7/1/2008
Page 2 of 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
'COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
3IB00016*ID 004 2008-06-01 To: 2008-06-30 CCB125 Liz Ryan PChlorination/Bromination PARAMETER Drto Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2008-06-01 100 2008-06-02 100 2008-06-03 51 2008-06-04 0
2008-06-05 100 2008-06-06 105 2008-06-07 100 2008-06-08 100 2008-06-09 100 2008-06-10 110 2008-06-11 100 2008-06-12 100 2008-06-13 100 2008-06-14 100 2008-06-15 100 2008-06-16 100 2008-06-17 100 2008-06-18 101 2008-06-19 100 2008-06-20 102 2008-06-21 100 2008-06-22 100 2008-06-23 100 2008-06-24 100 2008-06-25 100 2008-06-26 100 2008-06-27 100 2008-06-28 100 2008-06-29 100 2008-06-30 100 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative Ii
\\
I significant penalties for submitting false information, including the possibility of VP-Nod
&fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator... OH, Page 2 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
7/1/2008
Page 3 of 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
31B00016*ID STATION CODE:
094 MONITORING PERIOD:
2008-06-01 To: 2008-06-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Water Flow Rate H
Zinc, Total Copper, Total Oxidants, Total*
Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY 1/Day I/Day 2/Week I/Month 1/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-06-01 2008-06-02 2008-06-03 2008-06-04 2008-06-05 2008-06-06 2008-06-07 2008-06-08 2008-06-09 2008-06-10 2008-06-11 2008-06-12 2008-06-13 2008-06-14 2008-06-15 2008-06-16 2008-06-17 2008-06-18 2008-06-19 2008-06-20 2008-06-21 2008-06-22 2008-06-23 2008-06-24 2008-06-25 2008-06-26 2008-06-27 2008-06-28 2008-06-29 2008-06-30 Name/Title of Responsible I certify unde the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information istrue, accurate and complete I am aware that there are Representative significant penalties for submitting false information, including the possibility of V
-fine and imprisonment.
Y O 11 i When completed'maUl this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 3 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f..
7/1/2008
Page 4 of 8 Ohio EPA. - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
31B00016*ID STATION CODE:
094 MONITORING PERIOD:
2008-06-01 To: 2008-06-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Chlorination/Bromination Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2008-06-01 2008-06-02 2008-06-03 2008-06-04 2008-06-05 2008-06-06 2008-06-07 2008-06-08 2008-06-09 2008-06-10 2008-06-11 2008-06-12 2008-06-13 2008-06-14 2008-06-15 2008-06-16 2008-06-17 2008-06-18 2008-06-19 2008-06-20 2008-06-21 2008-06-22 2008-06-23 2008-06-24 2008-06-25 2008-06-26 2008-06-27 2008-06-28 2008-06-29 2008-06-30 Name/Title of Responsible I certifyunder the oenalty of law that I have personally examined and am familiar Signature of Date(MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative_
J PM 1 il rl tinsignificant penalties for submitting false information, including the possibility of 7
S o When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 4 https:Hebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
7/1/2008
p~* ~
Page 5 of 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
3IB00016*ID STATION CODE:
601 MONITORING PERIOD :
2008-06-01 To: 2008-06-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS 4108 6653 4106 4106 FREQUENCY Continuous 1 / 2 Weeks 1/ 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2008-06-01 2008-06-02 2008-06-03 2008-06-04 2008-06-05 2008-06-06 2008-06-07 2008-06-08 2008-06-09 2008-06-10 2008-06-11 2008-06-12 2008-06-13 2008-06-14 2008-06-15 2008-06-16 2008-06-17 2008-06-18 2008-06-19 2008-06-20 2008-06-21 2008-06-22 2008-06-23 2008-06-24 2008-06-25 2008-06-26 2008-06-27 2008-06-28 2008-06-29 2008-06-30 NameI1 tue of Responsilre I certify under the penalty of law that I have personally examined and am familiar signature of Date tNVVhl/oo V T)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are, Representative significant penalties for submitting false information, including the possibility of
/
V* P-Ký I
L I,
fine and imprisonment.
lo 16,'
o/~
When completed.mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 5 7 7
https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
7/1/2008
Page 6 of 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
3IB00016*ID STATION CODE:
602 MONITORING PERIOD:
2008-06-01 To: 2008-06-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL Total Suspended Oil and Grease, Iron, Total Copper, Total PARAMETER Flow Rate pH Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653
- 4106, 4106 4107 4107 FREQUENCY Continuous I/ 2 Weeks I / 2 Weeks
/ 2 Weeks 1/2 Weeks 1/ 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2008-06-01 2008-06-02 2008-06-03 2008-06-04 2008-06-05 2008-06-06.
2008-06-07 2008-06-08 2008-06-09 2008-06-10 2008-06-11 2008-06-12 2008-06-13 2008-06-14 2008-06-15 2008-06-16 2008-06-17 2008-06-18 2008-06-19 2008-06-20 2008-06-21 2008-06-22 2008-06-23 2008-06-24 2008-06-25 2008-06-26 2008-06-27 2008-06-28 2008-06-29 2008-06-30 lanamefitle of Responsible
[certify under the penalty of law that I have personally examined and am familiar Signature o0 Date (MMIDD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative Vp de6Lý significant penalties for submitting false information, including the possibility of
-7
/
VP-N) fine and imprisonment.
- 2 0" iO":
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, I
Page 6
/
https ://ebiz.epa.ohio.g-ov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
7/1/2008
Page 7 of 8 Ohio EPA - baily DischargeiMonitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
3IB000161*ID 800 2008-06-01 To: 2008-06-30 CCB125 Liz Ryan Water Zinc, Total Copper, Total PARAMETER Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS 4103 4107 4107 FREQUENCY I/Day 1/Month 1/Month SAMPLING TYPE Continuous Grab Grab 2008-06-01 60 2008-06-02 61 2008-06-03 61 23.33 6.317 2008-06-04 62 2008-06-05 59 2008-06-06 61 2008-06-07 67 2008-06-08 66 2008-06-09 68 2008-06-10 69 2008-06-11 68 2008-06-12 69 2008-06-13 66 2008-06-14 68 2008-06-15 69 2008-06-16 70 2008-06-17 71 2008-06-18 70 2008-06-19 68 2008-06-20 69 2008-06-21 69 2008-06-22 70
.2008-06-23 70 2008-06-24 71 2008-06-25 70 2008-06-26 70 2008-06-27 72 2008-06-28 72 2008-06-29 72 2008-06-30 72 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative-
,ignificant penalties for submitting false information, including the possibility of fine and imprisonment.
V O
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 7 https ://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
7/1/2008
Page 8 of 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 PERMIT NUMBER:
3IB00016*ID MONITORING PERIOD:
2008-06-01 To: 2008-06-30 PARAMETER COMMENTS:
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2008-06-01 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-02 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-03 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-04 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-06 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-08 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-09 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-10 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-11 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-12 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-16 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-21 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-23 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-25 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-27 4106 No brominatirn event this date 004 Oxidants, Total Residual 34044 2008-06-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-29 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-06-30 4106 No bromination event this date 004 Chlorine, Total Residual 50060 2008-06-04 4106 No Chlorination this day https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?actType=viewWithXslt&f...
7/1/2008