Information Request for an NRC Biennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection
ML082000855
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/18/2008
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Rencheck M
Indiana Michigan Power Co
References
Download: ML082000855 (8)


Text

July 18, 2008 Mr. Michael W. Rencheck Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT:

D.C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION

Dear Mr. Rencheck:

On October 6, 2008, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) baseline inspection at the D.C. Cook Nuclear Power Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedure IP 71111.17. The on-site portion of the inspection will take place on October 6 through October 10, 2008, and October 20 through October 24, 2008.

Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.

The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc to the Regional Office no later than August 11, 2008. The inspection team will review this information and, by August 22, 2008, will request specific items that should be available for review by September 22, 2008. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents in Group II (1) will be requested for review in the Regional Office prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, October 6, 2008. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

M. Rencheck The lead inspector for this inspection is Mr. Robert Daley. We understand that our regulatory contact for this inspection is Mr. John Mintz (269-465-5901(x1847)) of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630)829-9749 or via e-mail at robert.daley@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

Modification and 50.59 Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: L. Weber, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Planning Manager, Emergency Management and Homeland Security Division, Michigan State Police Department T. Strong, State Liaison Officer 2

M. Rencheck The lead inspector for this inspection is Mr. Robert Daley. We understand that our regulatory contact for this inspection is Mr. John Mintz (269-465-5901(x1847)) of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630)829-9749 or via e-mail at robert.daley@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

Modification and 50.59 Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl: L. Weber, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Planning Manager, Emergency Management and Homeland Security Division, Michigan State Police Department T. Strong, State Liaison Officer DOCUMENT NAME: Ltr. 071808 DCCook MOD50.59 RFI RCD.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DHills for RDaley: Is DHills DATE 07/18/08 07/18/08 OFFICIAL RECORD COPY 3

Letter to Mr. Michael Rencheck from Mr. David E. Hills dated July 18, 2008.

SUBJECT:

D.C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION DISTRIBUTION:

Tamara Bloomer RidsNrrDirsIrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov 4

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST Inspection Report: 05000315/2008008; 05000316/2008008(DRS)

Inspection Dates: October 6 through October 24, 2008 Inspection Procedures: IP 71111- 17, Permanent Plant Modifications Lead Inspector: R. Daley (630) 829-9749 I. Information Requested for In-Office Preparation Week The following information is requested by August 11, 2008, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by August 22, 2008. We will request that certain items be made available to the regional office prior to the inspection by September 22, 2008. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information for the last Permanent Modification inspection on April 3, 2006, to the present.

If you have any questions regarding this information, please call the team leader as soon as possible.

(1) List of permanent plant modifications to risk significant systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.

(2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should only include 10 CFR 50.59 evaluations for the following:

a. UFSAR changes that have been updated in accordance with 10 CFR 50.71(e)(4) since April 3, 2006;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been Issued.

1 Enclosure

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

(3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4) List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.

(5) List of calculation changes that have been issued for use.

(6) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and MOD 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance, (7) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.

(8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

(9) Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.

(10) List of any Sound Reasons to the Contrary evaluations performed in accordance with the requirements in 10 CFR 50.49, Section (k)(1).

(11) Name(s) and phone numbers for the regulatory and technical contacts.

(12) Current management and engineering organizational chart.

2 Enclosure

II. Information Requested to be Available Prior to Inspection (Request will be made by August 22, 2008 for availability of documents by September 22, 2008) or on First Day of Inspection (October 6, 2008)

(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications;
g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The Latest 10 CFR 50.59 FSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:

a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Current management and engineering organizational chart.

3 Enclosure

III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the team leader.

4 Enclosure