Requalification Program Inspection - Millstone, Unit 2
ML081990571
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/17/2008
From: Caruso J
Operations Branch I
To: Christian D
Dominion Resources
Shared Package
ML081840020 List:
References
Download: ML081990571 (5)


Text

July 17, 2008 Mr. David A. Christian, Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - MILLSTONE UNIT 2

Dear Mr. Christian:

In a telephone conversation on July 2, 2008, Mr. John G. Caruso, Acting Chief Operations Branch, and Mr. Michael Coty, Unit 2 Supervisor Requalification Training, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Millstone Unit 2 facility. The inspection is planned for the week of September 8, 2008, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by August 29, 2008.

Mr. Coty has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Mr. D. Christian 2 Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Caruso at (610) 337-5389.

Sincerely,

/RA/

John G. Caruso, Acting Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65

Mr. D. Christian 2 Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC=s document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Caruso at (610) 337-5389.

Sincerely,

/RA/

John G. Caruso, Acting Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65 SUNSI Review Complete: JC (Reviewer=s Initials)

ADAMS PKG: ML081840020 ADAMS ACC#ML081990571 DOCUMENT NAME: G:\DRS\Operations Branch\Caruso\Requal FY08-MS2 Sept 08\60dayrpi.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB NAME CJBixler/DS/JC for JGCaruso/JGC DATE 07/17/08 07/17/08 OFFICIAL RECORD COPY

Mr. D. Christian 3 cc w/encl:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support W. Bartron, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.

Mr. D. Christian 4 Distribution w/encl: VIA E-MAIL S. Collins, RA M. Dapas, DRA M. Gamberoni, DRS D. Roberts, DRS S. Hansell, DRS J. Caruso, DRS Examiner, DRS S. Williams, RI OEDO L. Vick, NRR/ADRO/DIRS/IOLB M. Kowal, NRR R. Nelson, NRR J. Hughey NRR, PM J. Lamb, NRR, PM D. Jackson, DRP B. Norris, DRP, Acting Branch Chief N. Sieller, DRP S. Shaffer, SRI J. Benjamin, RI J. Krafty, RI C. Kowalyshyn, OA Distribution w/encl:

DRS Master Exam File (C. Bixler) (w/concurrences)

DRS File