ML081990486

From kanterella
Jump to navigation Jump to search
Transmittal of License Termination Plan, Revision 1
ML081990486
Person / Time
Site: Rancho Seco
Issue date: 07/10/2008
From: Redeker S
Sacramento Municipal Utility District (SMUD)
To: John Hickman
Document Control Desk, NRC/FSME
References
MPC&D 08-060
Download: ML081990486 (2)


Text

0 SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT 9

The Power To Do More.

P.O. Box 15830, Sacramento, CA 95852-1830; 1-888-742-SMUD (7683)

MPC&D 08-060 July 10, 2008 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 RANCHO SECO LICENSE TERMINATION PLAN, REVISION 1 Attention: John Hickman Attached are copies of the changed pages for Revision 1 to the Rancho Seco License Termination Plan (LTP). The LTP revision incorporates RAI responses and makes other editorial changes for clarification.

If you or members of your staff have questions requiring additional information or clarification, please contact Robert Jones at (916) 732-4843.

Sincerely, Steve R k

Ver Manag

, Plant Closure and Decommissioning Cc w/ attachment:

Elmo Collins, NRC, Region IV RANCHO SECO NUCLEAR PLANT

  • 14440 Twin Cities Road, Herald, CA 95638-9799; (209) 333-2935

Rancho Seco LTP Revision 1.0 Replacement Pages The listing below provides the replacement pages for Revision 1.0 of the LTP. The listing below only identifies the LTP pages that result in changes to page numbers from Revision O0ofthe 2006 LTP. The replacement pages are based on double-sided pages.

All changes to Revision 1.0 can be found in the Revision Section that precedes the Table of Contents of the LTP.

Cover:

Remove Revision 0 cover page and replace with Revision 1.0 cover page.

TOC:

Remove Revision 0 TOC replace with Revision 1.0 TOC Chapter 1:

None Chapter 2:

Remove all of Revision 0 Chapter 2 including Chapter TOC and Attachments A and B. Replace with Chapter 2 including Chapter TOC and Attachments A and B.

Chapter 3:

Remove Revision 0 pages 3-9 to 3-11 and replace with Revision 1.0 pages 3-9 to 3-11.

Chapter 4:

Remove Revision 0 pages 4-15 to 4-16 and replace with Revision 1.0 pages 4-15 to 4-16.

Chapter 5:

Remove all of Revision 0 Chapter 5 and replace with Revision 1.0 Chapter 5 including TOC.

Chapter 6:

Remove all of Revision 0 Chapter 6.0 including Attachments A through Z and replace with Revision 1.0 of chapter 6 including Attachments A-Z.

Chapter 7:

None Chapter 8:

None