July 11, 2008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of )
Docket No. 50-259 Tennessee Valley Authority )
BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 1 - IMPLEMENTATION OF MITIGATING SYSTEMS PERFORMANCE INDICATORS This is in response to the NRC letter dated May 21, 2008 (ADAMS Accession No. ML081150701), which outlined an approach for NRCs oversight of the Unit 1 Mitigating Systems Performance Index (MSPI). The Unit 1 situation is unique in the Reactor Oversight Process due to its restart in May 2007 after being shut down for more than 20 years. TVA has reviewed the NRC approach for MSPI presented in the May 21, 2008, letter and finds it satisfactory with the below clarification.
TVA has worked with Institute of Nuclear Power Operations (INPO) to develop an INPO Consolidated Data Entry process for BFN Unit 1 MSPI submittals that is consistent with the current process for Unit 2. The use of this process eliminates the need to develop and implement a plant-specific calculator.
No new regulatory commitments are made in this submittal. If you have any comments regarding this letter, please contact me at (256)729-2636.
Sincerely, Original signed by D. T. Langley Manager of Licensing and Industry Affairs
U.S. Nuclear Regulatory Commission Page 2 July 11, 2008 cc:
NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Eva Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
U.S. Nuclear Regulatory Commission Page 3 July 11, 2008 JEE:MWO:BDL cc:
G. P. Arent, EQB 1B-WBN W. R. Campbell, Jr. LP 3R-C S. M. Douglas, POB 2C-BFN R. F. Marks, Jr., PAB 1C-BFN D. C. Matherly, BFT 2A-BFN L. E. Nicholson, LP 4K-C R. G. West, NAB 2A-BFN B. A. Wetzel, LP 4N-C S. A. Vance, WT 6A-K E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA-K, s:licensing/lic/submit/Unit 1 PIs/MSPI.doc