July 30, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNIT NOS. 1 AND 2 - ORDER AND NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING (TAC NOS. MD9018 AND MD9019)
Dear Mr. Pardee:
Enclosed for your information is a copy of an Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and a ANotice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing.@ The order and notice relate to your application for amendment dated June 17, 2008, to revise Byron Station, Unit Nos. 1 and 2 (Byron),
Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would incorporate a one-cycle interim alternate repair criteria in the provisions for SG tube repair criteria during Byron, Unit No.
2, refueling outage 14 and the subsequent operating cycle. For TS 5.6.9, the amendment would revise the current reporting requirements. The proposed changes only affect Byron, Unit No. 2; however, they are docketed for both Byron units because the TS are common to both units.
The order and notice have been forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA by S. Sands for/
Marshall J. David, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455
Enclosures:
Order and Notice cc w/encls: See next page
July 30, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BYRON STATION, UNIT NOS. 1 AND 2 - ORDER AND NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING (TAC NOS. MD9018 AND MD9019)
Dear Mr. Pardee:
Enclosed for your information is a copy of an Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and a ANotice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing.@ The order and notice relate to your application for amendment dated June 17, 2008, to revise Byron Station, Unit Nos. 1 and 2 (Byron),
Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would incorporate a one-cycle interim alternate repair criteria in the provisions for SG tube repair criteria during Byron, Unit No.
2, refueling outage 14 and the subsequent operating cycle. For TS 5.6.9, the amendment would revise the current reporting requirements. The proposed changes only affect Byron, Unit No. 2; however, they are docketed for both Byron units because the TS are common to both units.
The order and notice have been forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA by S. Sands for/
Marshall J. David, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455
Enclosures:
Order and Notice cc w/encls: See next page DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 RidsNrrDorlDpr RidsAcrsAcnw&mMailCenter RidsOgcRp RidsNrrLATHarris SRohrer, NRR RidsNrrPMMDavid RidsRgn3MailCenter Package Adams Accession No.: ML081920542 Letter Adams Accession No. :ML081920536 FRN and Order Adams Accession No.: ML081920543 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME MDavid THarris RGibbs DATE 7/15/08 7/15/08 7/27/08 OFFICIAL RECORD COPY
Byron Station, Unit Nos. 1 and 2 cc:
Corporate Distribution Exelon Generation Company, LLC Via e-mail Byron Distribution Exelon Generation Company, LLC Via e-mail Illinois Emergency Management Agency Division of Nuclear Safety Via e-mail Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Via e-mail Howard A. Learner Environmental Law and Policy Center of the Midwest Via e-mail Byron Resident Inspector U. S. Nuclear Regulatory Commission Via e-mail Attorney General Springfield, IL 62701 Via e-mail Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board Via e-mail Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 Will County Executive Via e-mail Mr. Barry Quigley 3512 Louisiana Rockford, IL 61108