Order and Notice of Consideration of Issuance of Amendments to Facility Operating License, Proposed No Significant Hazard Consideration Determination, and Opportunity for a Hearing
ML081920536
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/30/2008
From: David M
NRC/NRR/ADRO/DORL/LPLIII-2
To: Pardee C
Exelon Generation Co
marshall david 415-1547
Shared Package
ML081920542 List:
References
TAC MD9018, TAC MD9019
Download: ML081920536 (3)


Text

July 30, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BYRON STATION, UNIT NOS. 1 AND 2 - ORDER AND NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING (TAC NOS. MD9018 AND MD9019)

Dear Mr. Pardee:

Enclosed for your information is a copy of an Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and a ANotice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing.@ The order and notice relate to your application for amendment dated June 17, 2008, to revise Byron Station, Unit Nos. 1 and 2 (Byron),

Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would incorporate a one-cycle interim alternate repair criteria in the provisions for SG tube repair criteria during Byron, Unit No.

2, refueling outage 14 and the subsequent operating cycle. For TS 5.6.9, the amendment would revise the current reporting requirements. The proposed changes only affect Byron, Unit No. 2; however, they are docketed for both Byron units because the TS are common to both units.

The order and notice have been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA by S. Sands for/

Marshall J. David, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455

Enclosures:

Order and Notice cc w/encls: See next page

July 30, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BYRON STATION, UNIT NOS. 1 AND 2 - ORDER AND NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING (TAC NOS. MD9018 AND MD9019)

Dear Mr. Pardee:

Enclosed for your information is a copy of an Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and a ANotice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing.@ The order and notice relate to your application for amendment dated June 17, 2008, to revise Byron Station, Unit Nos. 1 and 2 (Byron),

Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator Tube Inspection Report. For TS 5.5.9, the amendment would incorporate a one-cycle interim alternate repair criteria in the provisions for SG tube repair criteria during Byron, Unit No.

2, refueling outage 14 and the subsequent operating cycle. For TS 5.6.9, the amendment would revise the current reporting requirements. The proposed changes only affect Byron, Unit No. 2; however, they are docketed for both Byron units because the TS are common to both units.

The order and notice have been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA by S. Sands for/

Marshall J. David, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-455

Enclosures:

Order and Notice cc w/encls: See next page DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 RidsNrrDorlDpr RidsAcrsAcnw&mMailCenter RidsOgcRp RidsNrrLATHarris SRohrer, NRR RidsNrrPMMDavid RidsRgn3MailCenter Package Adams Accession No.: ML081920542 Letter Adams Accession No. :ML081920536 FRN and Order Adams Accession No.: ML081920543 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME MDavid THarris RGibbs DATE 7/15/08 7/15/08 7/27/08 OFFICIAL RECORD COPY

Byron Station, Unit Nos. 1 and 2 cc:

Corporate Distribution Attorney General Exelon Generation Company, LLC Springfield, IL 62701 Via e-mail Via e-mail Byron Distribution Ms. Lorraine Creek Exelon Generation Company, LLC RR 1, Box 182 Via e-mail Manteno, IL 60950 Illinois Emergency Management Agency Chairman, Ogle County Board Division of Nuclear Safety Via e-mail Via e-mail Mrs. Phillip B. Johnson Mr. Dwain W. Alexander, Project Manager 1907 Stratford Lane Westinghouse Electric Corporation Rockford, IL 61107 Via e-mail Will County Executive Howard A. Learner Via e-mail Environmental Law and Policy Center of the Midwest Mr. Barry Quigley Via e-mail 3512 Louisiana Rockford, IL 61108 Byron Resident Inspector U. S. Nuclear Regulatory Commission Via e-mail