July 2, 2008

Mr. Barry S. Allen

Site Vice President

FirstEnergy Nuclear Operating Company

Davis-Besse Nuclear Power Station

5501 North State Route 2

Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - NOTIFICATION OF AN

NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION 05000346/2008004

Dear Mr. Allen:

On August 25, 2008, the NRC will begin the on-site portion of the Triennial Heat Sink

Performance Inspection at your Davis-Besse Nuclear Power Station. This inspection will

be performed in accordance with NRC baseline inspection procedure (IP) 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a

productive inspection, we have enclosed a request for documents needed for the

inspection. The documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than July 14, 2008.

By July 25, 2008, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

  • The second group of documents requested is those items needed to support our in-

office preparation activities. This set of documents, including the calculations associated

with the selected heat exchangers, should be available at the Regional Office no later

than August 18, 2008. This information should be separated for each selected

component, especially if provided electronically (e.g., folder with component name that

includes calculations, condition reports, maintenance history, etc.). During the in-office

preparation activities, the inspector may identify additional information needed to support

the inspection.

  • The last group includes the additional information above as well as plant specific

reference material. This information should be available on-site to the inspector on

August 25, 2008. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

Please send the information to the following e-mail address gerard.odwyer@nrc.gov. A

hard-copy with the required information is also an acceptable option.

B. Allen

-2-

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the on-site

inspection.

All requested documents are to be for the time period from the on-site inspection period

back to the last Heat Sink Performance Inspection. If nothing addressing a request was

done in that time period, then the request applies to the last applicable document in the

previous time period.

The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about

the material requested, or the inspection, please call Mr. ODwyer at (630) 829-9624.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-346

License Nos. NPF-3

Enclosure:

TRIENNIAL HEAT SINK INSPECTION

DOCUMENT REQUEST

cc w/encl:

The Honorable Dennis Kucinich

J. Hagan, President and Chief

Nuclear Officer - FENOC

J. Lash, Senior Vice President of

Operations and Chief Operating Officer - FENOC

Manager - Site Regulatory Compliance - FENOC

D. Pace, Senior Vice President of

Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC

Manager - Fleet Licensing - FENOC

C. OClaire, Chief, Ohio Emergency Management Agency

R. Owen, Administrator, Ohio Department of Health

Public Utilities Commission of Ohio

President, Lucas County Board of Commissioners

President, Ottawa County Board of Commissioners

B. Allen

-2-

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the on-site

inspection.

All requested documents are to be for the time period from the on-site inspection period

back to the last Heat Sink Performance Inspection. If nothing addressing a request was

done in that time period, then the request applies to the last applicable document in the

previous time period.

The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about

the material requested, or the inspection, please call Mr. ODwyer at (630) 829-9624.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records System (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS), accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-346

License Nos. NPF-3

Enclosure:

TRIENNIAL HEAT SINK INSPECTION

DOCUMENT REQUEST

DISTRIBUTION LIST

See Next Page

DOCUMENT NAME: R:\\Ltrs to licensees\\DAV-BESSE 070208 RFI 2008-004 CEA .doc

9 Publicly Available

9 Non-Publicly Available 9 Sensitive

9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE

RIII

RIII

NAME

AMStone for GODwyer: ls

AMStone

DATE

07/02/08

07/02/08

OFFICIAL RECORD COPY

Letter to Mr. Barry S. Allen to Ms. Ann Marie Stone dated July 2, 2008.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - NOTIFICATION OF AN

NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION 05000346/2008004

cc w/encl:

The Honorable Dennis Kucinich

J. Hagan, President and Chief

Nuclear Officer - FENOC

J. Lash, Senior Vice President of

Operations and Chief Operating Officer - FENOC

Manager - Site Regulatory Compliance - FENOC

D. Pace, Senior Vice President of

Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC

Manager - Fleet Licensing - FENOC

C. OClaire, Chief, Ohio Emergency Management Agency

R. Owen, Administrator, Ohio Department of Health

Public Utilities Commission of Ohio

President, Lucas County Board of Commissioners

President, Ottawa County Board of Commissioners

DISTRIBUTION:

RAG1

TEB

TJW2

RidsNrrDirsIrib

MAS

KGO

JKH3

JER7

CAA1

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

1

Inspection Report: 05000346/2008004

Inspection Dates:

August 25, 2008 - August 29, 2008

Inspection Procedure:

IP 71111.07, Triennial Heat Sink Performance Inspection

Lead Inspector:

Gerard ODwyer

(630) 829-9624

gerard.odwyer@nrc.gov

I.

Information Requested By July 14, 2008

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous two years or since the last Triennial heat sink

inspection.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. System health report(s) and maintenance rule system notebooks for all the GL 89-13

heat exchangers.

II.

Information Requested By August 18, 2008

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests confirming thermal performance

for those heat exchangers which are performance tested;

b. Copy of system description and design basis document for the heat exchangers

(as applicable);

c. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers;

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

2

d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable

for each heat exchanger; and

e. Provide a list of calculations with a description which currently apply to each heat

exchanger.

2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat

exchanger to be done during the on-site portion of the inspection.

3. Copies of procedures developed to implement the recommendations of GL 89-13,

e.g., the GL 89-13 Heat Exchanger Program description.

4. Updated Final Safety Analysis Report pages for the GL 89-13 Heat Exchanger

Program.

5. Maximum Cooling Water system inlet temperature limit that still allows full licensed

power operation of the nuclear reactor. Please provide the document that states this

limit (e.g., USAR or TRM) and the operating procedure that ensures this limit is not

exceeded.

III.

Information Requested to be Available on First Day of Inspection, August 25, 2008

1. For the specific heat exchangers selected:

a. Provide the Design Basis Documents and Updated Final Safety Analysis Report

pages for the selected heat exchangers;

b. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

c. Copy of the vendor manuals including component drawings for each heat

exchanger;

d. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers;

e. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria);

f.

Copy of the calculations or documents which evaluate the potential for water

hammer or excessive tube vibration in the heat exchanger or associated piping;

g. List of engineering-related Operator Workarounds/Temporary Modifications for

these heat exchangers since the last Heat Sink Performance;

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

3

h. Copy of the evaluations of data for the two most recent completed tests

confirming the thermal performance of each heat exchanger;

i.

Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests;

j.

Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers;

k. Copies of the documents that verify the structural integrity of the heat exchanger,

e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results;

l.

The cleaning and inspection maintenance schedule for each heat exchanger for

the next five years;

m. Copy of the document describing the inspection results for the last two clean and

inspection activities completed on each heat exchanger;

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger; and

p. Information regarding any alarms which monitor on-line performance.

2. For the ultimate heat sink:

a. For underwater UHS weirs or excavations;

(1) Maintenance or inspection of inaccessible below-water portions of the UHS

system including results of underwater diving inspections and assessments of

sediment intrusion and/or removal of sediment.

b. For all heat sinks;

(1) Inspections and/or maintenance related to preventing macrofouling (silt, dead

mussel shells, debris, etc.) and aquatic life such as fish, algae, grass or kelp.

(2) Inspections and/or maintenance related to preventing biotic fouling.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

4

(3) Copies of chemistry procedures and surveillances that monitor for pH,

calcium hardness, etc.

(4) Copies of any design change performed on the system.

(5) Copies of procedures for a loss of UHS.

(6) Copies of procedures associated with operating during adverse weather

conditions, e.g. icing or high temperatures or low levels.

(7) Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

(8) Copies of surveillance procedures and testing results conducted on the level

instrumentation relied upon to determine UHS reservoir capability.

3. For the safety related service water system (or equivalent):

a. Last two performance tests, such as the ASME inservice test, for all pumps, all

valves and the cooling towers, if applicable, in the safety-related service water

system. If the components are not performance tested, please provide

documentation verifying performance by the methods actually used;

b. Copies of the documents that verify flow testing was done at maximum design flow

during the last two years or since the last time it was done. Copies of the

documents that verify maximum design flow testing will continue to be periodically

done in the future;

c. Copies of any design changes performed on the system;

d. Copies of procedures for a loss of service water system;

e. Copies of inspections and/or maintenance related to macrofouling (silt, dead

mussel shells, debris, etc.) and aquatic life such as fish, algae, grass or kelp;

f.

Copies of inspections and/or maintenance related to preventing biotic fouling;

g. Copies of chemistry procedures and surveillances that monitor for pH, calcium

hardness, etc.;

h. Copies of procedures and/or test results to survey or monitor interface valves

between the safety related section of the service water system and the non-safety

related section;

i.

Copies of the pipe testing and/or inspection program procedures and surveillances;

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

5

j.

Copies of the documents that verify the structural integrity of the heat exchanger,

e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection

results;

k. History of any thru wall pipe leak on the system; and

l.

Copies of the procedures to monitor assess and disposition active through wall

pipe leaks, including structural evaluations and/or planned corrective actions.

If the information requested above will not be available, please contact Mr. ODwyer as soon as

possible at (630) 829-9624 or email gerard.odwyer@nrc.gov.