|
---|
Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] Category:License-Operator
MONTHYEARML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21279A2192021-10-0606 October 2021 301 Post Exam Comments ML21074A2712021-03-12012 March 2021 VCS 2021-301 Corporate Notification Letter Aka 210-day Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19352G6942019-12-16016 December 2019 VC Summer 2019-301 Written Exam Approval Letter ML19340A0612019-12-0606 December 2019 VC Summer 2019-301 Exam Approval Letter ML19022A2132019-01-18018 January 2019 VCS 2019 Corporate Notification Letter Aka 210-Day Letter ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000395/20183012018-08-14014 August 2018 /2018301 Exam Admin Items 2D ML18226A3442018-08-14014 August 2018 VC Summer U2 2017-302 Exam Administrative Items ML18116A6892018-04-26026 April 2018 (Vcsns), Unit 1 - Regulatory Issue Summary, RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18057A7672018-02-26026 February 2018 301 Exam Final Items (Delayed Release-2 Year) ML18057A7402018-02-26026 February 2018 VCS Unit 1 2017-301 Exam Draft Items (Delayed Release-2 Years) ML18057B5352018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2C ML18057A8142018-02-26026 February 2018 301 Exam Administrative Items (Delayed Release-2 Year) ML18057B5102018-02-26026 February 2018 V. C. Summer 05000395/2011301 Exam Draft Items 2A ML18057A9362018-02-26026 February 2018 301 Exam Administrative Items IR 05000395/20113012018-02-26026 February 2018 VC Summer 05000395/2011301 Exam Administrative Items 2D ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18032A2372018-02-0101 February 2018 Form ES-201 Vogtle 3&4, V.C. Summer 2&3 Initial NRC Written Exam Sample Plan - ADAMS 2A - Public Exam Draft Items - Delay Release 2 Years ML17298A5532017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items RO As-Given Written Exam ML17298C0122017-10-25025 October 2017 V. C. Summer, Unit 2, 05200027/2016301 Public Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML17298B9692017-10-25025 October 2017 /2016-301 Public Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17298A5722017-10-25025 October 2017 VC Summer 05000395/2017301 Exam Report Items SRO As-Given Written Exam ML17263B2132017-09-14014 September 2017 V. C. Summer Nuclear Power Plant - Operator Licensing Examination Approval 05000395/2017301 ML17193A9242017-07-12012 July 2017 (U1) 2016-301 Exam Final Items - Delay Release ML17193A9262017-07-12012 July 2017 (U1) 2016-301 Exam Administrative Items - Delay Release ML17181A3762017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2D ML17181A3542017-06-30030 June 2017 V.C. Summer 2015-301 Exam Draft Items for ADAMS 2A ML17181A3622017-06-30030 June 2017 V.C. Summer 2015-301 Exam Final Items for ADAMS 2B ML17181A3672017-06-30030 June 2017 V.C. Summer 2015-301 Exam Administrative Items for ADAMS 2C ML17097A4452017-04-0505 April 2017 Notification of Licensed Operator Initial Examination 05000395/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16279A3232016-10-0303 October 2016 September 2016 - Summer Unit 1 NRC Generic Fundamentals Examination Results ML16201A2232016-07-15015 July 2016 Preparation and Scheduling of Operator Licensing Examinations ML16179A2682016-06-24024 June 2016 (Unit 1) 2016-301 RO As-Given Written Exam ML16179A2712016-06-24024 June 2016 (Unit 1) 2016-301 SRO As-Given Written Exam ML16158A5002016-05-31031 May 2016 VC Summer Operator Licensing Written Examination Approval 05000395/2016301 ML15280A3802015-10-0505 October 2015 September 2015 - NRC Generic Fundamentals Examination Results ML17193A9232015-08-10010 August 2015 (U2) 2016-301 Exam Draft Items - Delay Release ML15211A3932015-07-30030 July 2015 Initial Exam 2015-302 Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Exam Post Exam Comments2015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments ML15173A4402015-06-26026 June 2015 VC Summer 2015-301 Initial Exam Post Exam Comments RC-15-0076, VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam2015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4382015-06-22022 June 2015 VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam ML15173A4392015-05-20020 May 2015 VC Summer 2015-301 Initial Exam Final SRO Written Exam ML15140A6092015-05-19019 May 2015 VC Summer Nuclear Power Plant - Operator Licensing Written Examination Approval 05000395/2015-301 ML14308A2142014-10-30030 October 2014 Notification of Licensed Operator Initial Examination 05000395/2015301 2022-05-05
[Table view] Category:Other HQ and Regional Correspondence
MONTHYEARML0821702982008-07-31031 July 2008 Transmittal of Anticipated Schedule for Operator Licensing Examinations in Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations. ML0818401472008-07-0101 July 2008 Requalification Program Inspection - V.C. Summer - 30-Day Letter 2008-07-31
[Table view] |
Text
SCE&G 2 July 1, 2008 Mr. Jeffrey B. Archie Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - V. C. SUMMER NUCLEAR PLANT
Dear Mr. Archie:
In a telephone conversation on June 26, 2008, Mr. Bruno Caballero, Operations Engineer, Mr.
Rob Ray, Operations Training Supervisor, and Mr. Eric Warden, Requal Supervisor, made arrangements for the NRC to inspect the licensed operator requalification (LOR) program at the V. C. Summer Nuclear Plant. The inspection is planned for the week of August 11, 2008, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1985, AAmerican National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.@
In accordance with 10 CFR 55.59 (c), the NRC has requested that you submit (two weeks prior to the inspection/make ready upon arrival), the material as specified in enclosure one, in order to support the NRC's inspection program needs. Mr. Ray and Mr. Warden have been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
SCE&G 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruno Caballero at (404) 562-4608 or me at (404) 562-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operator Licensing Branch Division of Reactor Safety Docket No. 50-395 License No. NPF-12
Enclosure:
Materials Request List (cc w/encl: See Page 3)
July 1, 2008 Mr. Jeffrey B. Archie Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - V. C. SUMMER NUCLEAR PLANT
Dear Mr. Archie:
In a telephone conversation on June 26, 2008, Mr. Bruno Caballero, Operations Engineer, Mr.
Rob Ray, Operations Training Supervisor, and Mr. Eric Warden, Requal Supervisor, made arrangements for the NRC to inspect the licensed operator requalification (LOR) program at the V. C. Summer Nuclear Plant. The inspection is planned for the week of August 11, 2008, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI/ANS-3.5-1985, AAmerican National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.@
In accordance with 10 CFR 55.59 (c), the NRC has requested that you submit (two weeks prior to the inspection/make ready upon arrival), the material as specified in enclosure one, in order to support the NRC's inspection program needs. Mr. Ray and Mr. Warden have been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/
NAME B. Caballero M. Widmann J. Dodson DATE 06/26/08 07/01/08 06/26/08 7/ /2008 7/ /2008 7/ /2008 7/ /2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SCE&G 3 cc w/encl:
R. J. White Robert M. Fowlkes Nuclear Coordinator General Manager S.C. Public Service Authority Mail Code 802 Engineering Services Electronic Mail Distribution South Carolina Electric & Gas Company Electronic Mail Distribution Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius LLP Thomas D. Gatlin Electronic Mail Distribution General Manager Nuclear Plant Operations (Mail Code 303)
Susan E. Jenkins South Carolina Electric & Gas Company Assistant Director, Division of Waste Electronic Mail Distribution Management Bureau of Land and Waste Management David A. Lavigne Department of Health and Environmental General Manager Control Organization Development Electronic Mail Distribution South Carolina Electric & Gas Company Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt. Senior Resident Inspector S.C. Department of Health and South Carolina Electric and Gas Company Environmental Control Virgil C. Summer Nuclear Station Electronic Mail Distribution U.S. NRC 576 Stairway Road Bruce L. Thompson Jenskinsville, SC 29065 Manager Nuclear Licensing (Mail Code 830) Mr. L. A. Blue South Carolina Electric & Gas Company Training Manager Electronic Mail Distribution Virgil C. Summer Nuclear Station P. O. Box 88 (Mail Code P-40)
Jenkinsville, SC 29065
SCE&G 4 Letter to Jeffrey B. Archie from Malcolm T. Widmann dated July 2, 2008
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - V. C. Summer Nuclear Plant Distribution w/encl:
RIDSNRRDIRS PUBLIC R. Martin, NRR (PM: HAT, SUM)
Materials Request List The items listed below are being requested per telephone conversation on June 26, 2008 to support the upcoming IP-71111.11B inspection in August 2008 at V.C. Summer. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by July 25, 2008. Please have the items listed in paragraph "B" ready for our review upon arrival on August 11, 2008.
A. In-office inspection material:
- 1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions
- 2. Copy of an Organizational Chart for the training department including the simulator group
- 3. Copy of the weekly schedules for the weeks that the 2008 annual operating exams will be administered, including a list of personnel scheduled for testing the week of 08/11/08
- 4. A copy of the written exams (all weeks) that were administered for the last biennial requal exam (2007), including all biennial re-take exams
- 5. Copies of the simulator scenarios and JPMs (simulator and in-plant) that have already been administered and that will be administered the week of 08/11/08. (exam security related item)
- 6. Self assessment reports, Condition Reports, and LERs resulting from human performance errors since the last requal inspection
- 7. A copy of the governing site procedure(s) for the conduct license operator requalification training (classroom and simulator) and exam development/administration
- 8. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANSB3.5-1985 requirements B. On-site inspection material:
- 1. Requal training attendance records for the current two year requal training cycle
- 2. Exam results since last requal inspection (weekly exams operating exams), copies of exam that had pass/failure rates significantly outside the average
- 3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requal exam. (exam security related item)
- 4. All training feedback forms since the last requal inspection
- 5. All remedial training packages since the last requal inspection Enclosure
2
- 6. A list of all personnel that reactivated their licenses since the last requal inspection
- 7. Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection
- 8. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection
- 9. All Medical Exam Records
- 10. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience
- 11. Simulator:
List of all open simulator discrepancies (DR=s)
Copy of the Simulator Management and Configuration Procedures List of all closed simulator DR=s for last 12 months List of Simulator Performance tests
- 12. Security procedures for the simulator
- 13. Program evaluation for the previous 2 years training cycle Enclosure