ML081710296

From kanterella
Jump to navigation Jump to search
Site Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection Ti 2515/171
ML081710296
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/19/2008
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
References
Download: ML081710296 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION June 19, 2008 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION TI 2515/171

Dear Mr. Stall:

In a conversation on June 18, 2008, Alvin Robertson and Son Ninh made arrangements for the NRC to inspect the site specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Turkey Point Nuclear Plant. The inspection is planned for the week of July 28, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to the NRC Team Lead and NRR Inspector (one copy each) by July 7, 2008, prior to the planned inspection. Please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 2. Alvin Robertson has been advised of this request and provided with the name and address of the NRC lead inspector and the NRR inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission,

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION FP&L 2

Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Son Ninh at (404) 562-4503 or me at (404) 562-4629.

Sincerely,

/RA/

Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosures:

1.

Documentation Requested Prior To The Inspection

2.

Arrangements/Documents Requested To Be Available Onsite During The Inspection Week cc w/o encl: (See page 3)

OFFICE RII:DRP RII:DRP SIGNATURE MDS for MDS NAME S. Ninh M. Sykes DATE 06/19/2008 06/19/2008 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION FP&L 3

cc w/o encl William Jefferson, Jr.

Senior Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Olga Hanek (Acting) Licensing Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Don E. Grissette Vice President Nuclear Training and Performance Improvement Florida Power & Light Company Electronic Mail Distribution Michael Kiley Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution P. Infanger Licensing Manager Turkey Point Nuclear Generating Station Electronic Mail Distribution Mark Warner Vice President Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President Nuclear Technical Services Florida Power & Light Company Electronic Mail Distribution M. S. Ross Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution Mano Nazar Senior Vice President and Nuclear Chief Operating Officer Florida Power & Light Company Electronic Mail Distribution Senior Resident Inspector Florida Power and Light Company Turkey Point Nuclear Generating Station U.S. NRC 9760 SW 344th St.

Florida City, FL 33035 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Alejandro Sera Emergency Management Coordinator Miami-Dade County Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Mike A. Shehadeh, P.E.

City Manager City of Homestead Electronic Mail Distribution

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION FP&L 4

Letter to J. Art Stall from Marvin D. Sykes dated June 19, 2008

SUBJECT:

SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION TI 2515/171 Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS B. Mozafari, NRR Distribution w/o encl:

PUBLIC