MONTHYEARBVY 24-028, Pre-Notice of Disbursement from Decommissioning Trust2024-10-31031 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-10-30030 October 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust 2024-09-18
[Table view] Category:Safety Evaluation
MONTHYEARML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18242A6392018-10-11011 October 2018 Safety Evaluation of License Transfer Request (License DPR-28, Docket Nos. 50-271 and 72-59 ML18156A1802018-08-15015 August 2018 Enc 2 SER ISFSI Only Tech Spec Amendment Package ML18165A4232018-07-25025 July 2018 Issuance of Amendment to Change the Physical Security Plan to Reflect an ISFSI-Only Configuration ML18099A1662018-05-0101 May 2018 Entergy Vermont Yankee Quality Assurance Program Manual - Review and Acceptance of Changes ML18053A1132018-03-30030 March 2018 VY ISFSI Only EP Final SER - Jack Parrott ML17082A3102017-06-20020 June 2017 Request for Exemptions from 10 CFR 30.11 for Vermont Yankee Alternate Disposal of Low-Activity Waste Water at Us Ecology Idaho ML17013A3032016-12-12012 December 2016 Draft Final SER ML16165A4672016-06-16016 June 2016 Safety Evaluation of the Entergy Vermont Yankee, Quality Assurance Program Manual, Revision 4 ML16165A4662016-06-16016 June 2016 Quality Assurance Program Manual Vermont Yankee Nuclear Power Station and Independent Spent Fuel Storage Facility - Review and Acceptance of Changes ML16014A1692016-03-14014 March 2016 Vermont Yankee Nuclear Power Station - Issuance of Amendment No. 265 to Renewed Facility Operating License Re: Cyber Security Plan Implementation Schedule (CAC No. MF6403) ML16008B1032016-01-20020 January 2016 Evaluation of 10CFR 50.54(p)(2) Changes to the Security Plans ML15233A1662015-12-11011 December 2015 Issuance of Amendment No. 264 to Renewed Facility Operating License Changes to the Emergency Plan and Emergency Action Levels ML15292A2562015-11-0202 November 2015 Correction Letter Regarding Staff Review of Entergy'S Update to the Irradiated Fuel Management Plan ML15117A5512015-10-0707 October 2015 Issuance of Amendment for Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML15274A3792015-10-0505 October 2015 Review of Update to the Irradiated Fuel Management Plan ML15120A3152015-05-0707 May 2015 Relief Request ISI-06, Inservice Inspection Limited Examinations for the Fourth 10-Year Interval ML15097A3612015-04-16016 April 2015 Request for Consent to Cancel Lines of Credit ML14304A5882015-02-12012 February 2015 Issuance of Amendment No. 261, Revise Technical Specifications to Eliminate Certain Requirements During Movement of Irradiated Fuel and Core Alterations Consistent with TSTF-51 ML14346A0652015-02-0404 February 2015 Issuance of Amendment No. 261, Revise Site Emergency Plan for Permanently Defueled Condition to Reflect Change in On-Shift Staffing and Emergency Response Staffing ML14217A0722014-12-22022 December 2014 Issuance of Amendment No. 260, Revise and Remove Certain Requirements from Technical Specification Section 6.0, Administrative Controls, No Longer Applicable for Its Permanently Defueled Condition ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML13238A3982013-08-28028 August 2013 Relief Requests for the Fifth 10-Year Inservice Testing Program Interval ML13228A1972013-08-22022 August 2013 Relief Request ISI-05 - Fifth 10-Year ISI Interval - Alternative to Maintain Certain ISI Related Activities on 2001 Edition, 2003 Addenda ASME Section XI Code ML13212A2012013-08-15015 August 2013 Issuance of Amendment No. 258 Change to Licensing Basis Regarding Station Blackout ML13127A1762013-05-21021 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13105A1752013-04-26026 April 2013 Issuance of Amendment No. 257 Request to Revise Requirement of the Recirculation Pump Discharge Bypass Valves ML13042A2722013-04-17017 April 2013 Issuance of Amendment 256 Revision to License Condition 3.P and 3.S ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML13055A0092013-03-0101 March 2013 Relief Request ISI-PT-02 - Fourth 10-Year ISI Interval - Alternative to System Leakage Test for the Reactor Pressure Vessel Head Flange Leak-Off Lines ML1300903212013-01-30030 January 2013 Issuance of Amendment Rod Worth Minimizer Bypass Allowance TS Change (TAC No. Me 7927) ML1300902152013-01-30030 January 2013 Issuance of Amendment Change to Suppression Chamber Drywell Leak Rate Test Surveillance Frequency ML12261A2922012-11-13013 November 2012 Issuance of Amendment to Renewed Facility Operating License Cyber Security Plan Implementation Schedule Milestone ML1214501962012-05-31031 May 2012 Closeout of Bulletin 2011-01, Mitigating Strategies, ML1207601522012-03-28028 March 2012 Core Plate Hold Down Bolt Inspection Plan and Analysis - Vermont Yankee Nuclear Power Station ML1127904592011-11-0404 November 2011 Issuance of Amendment Revised Reactor Vessel Pressure-Temperature Limitation Curves ML1127205902011-09-30030 September 2011 Issuance of Emergency Amendment Modification of Technical Specification for Single Loop Operation ML1121014312011-08-25025 August 2011 Issuance of Amendment Elimination of Technical Specification Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool ML11152A0132011-07-20020 July 2011 License Amendment, Cyber Security Plan ML1103400782011-02-23023 February 2011 Issuance of Amendment Control Rod Block Actuation Logic System Functional Test ML1100601792011-02-0909 February 2011 Issuance of Amendment Regarding Modification to Technical Specification 4.12 as Result of Changes Made by License Amendment Nos. 230 and 239 and to Revise Wording in TS 3.7.A.8 ML1025717732010-10-0606 October 2010 License Amendment, Issuance of Amendment Scram Discharge Volume Vent and Drain Valves ML1026002492010-10-0101 October 2010 Relief Request VY-ISI-014, Alternative Examination Requirement for Nozzle-To-Vessel Weld and Inner Radius Using ASME Code Case N-702-Vermont Yankee Nuclear Power Station ML1004316132010-03-0808 March 2010 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML1001203062010-01-26026 January 2010 Issuance of Amendment Revision to Requirements for Inoperable Containment Isolation Valves ML0936208072010-01-22022 January 2010 Cover Letter, (Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point, Palisades, Pilgrim, and Vermont Yankee Nuclear Power St ML0936208952010-01-22022 January 2010 Safety Evaluation,(Non-Proprietary) Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, Fitzpatrick, Indian Point,Palisades,Pilgrim, and Vermont Yankee Nuclear Power ML0933604432010-01-0404 January 2010 License Amendment 241 Revision of High Radiation Area Controls 2023-05-01
[Table view] |
Text
July 16, 2008 Vice President, Operations Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - REVIEW OF THE SPENT FUEL MANAGEMENT PLAN (TAC NO. MD8035)
Dear Sir or Madam:
By letter dated March 21, 2007 (Agencywide Documents and Management System (ADAMS)
Accession No. ML070860696), Entergy Nuclear Operations, Inc. (the licensee) submitted the report pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.54(bb) titled Vermont Yankee Nuclear Power Station - Program for Maintenance of Irradiated Fuel and supplemental submittal (ML081200753) dated April 24, 2008, titled Response to Request for Additional Information. These submittals address how Vermont Yankee Nuclear Power Station (VY) will meet the requirements set forth in 10 CFR 50.54(bb).
The Nuclear Regulatory Commission (NRC) staff completed its review and determined that we are unable to provide preliminary approval of Entergy VYs spent fuel management program under 10 CFR 50.54(bb). The NRC staffs basis for not providing preliminary approval of Entergy VYs spent fuel management plan is documented in the enclosed safety evaluation. It is requested that the licensee provide a revised spent fuel management plan within 90 days.
Sincerely,
/RA/
James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
Safety Evaluation cc w/encl: See next page
Vermont Yankee Nuclear Power Station cc:
Regional Administrator, Region I Ms. Carla A. White, RRPT, CHP U. S. Nuclear Regulatory Commission Radiological Health 475 Allendale Road Vermont Department of Health King of Prussia, PA 19406-1415 P.O. Box 70, Drawer #43 108 Cherry Street Mr. David R. Lewis Burlington, VT 05402-0070 Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, N.W. Ms. Charlene D. Faison Washington, DC 20037-1128 Manager, Licensing Entery Nuclear Operations Mr. David O=Brien, Commissioner 440 Hamilton Avenue Vermont Department of Public Service White Plains, NY 10601 112 State Street Montpelier, VT 05620-2601 Resident Inspector Vermont Yankee Nuclear Power Station Mr. James Volz, Chairman U. S. Nuclear Regulatory Commission Public Service Board P.O. Box 176 State of Vermont Vernon, VT 05354 112 State Street Montpelier, VT 05620-2701 Massachusetts Emergency Management Agency Chairman, Board of Selectmen ATTN: John Giarrusso, Town of Vernon Nuclear Preparedness Manager P.O. Box 116 400 Worcester Rd.
Vernon, VT 05354-0116 Framingham, MA 01702-5399 Operating Experience Coordinator Jonathan M. Block, Esq.
Vermont Yankee Nuclear Power Station Main Street P.O. Box 250 P.O. Box 566 Governor Hunt Road Putney, VT 05346-0566 Vernon, VT 05354 G. Dana Bisbee, Esq.
Deputy Attorney General 33 Capitol Street Concord, NH 03301-6937 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108
Vermont Yankee Nuclear Power Station cc:
Senior Vice President Vice President Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
P.O. Box 31955 P.O. Box 31955 Jackson, MS 39286-1995 Jackson, MS 39268-1995 Mr. Oscar Limpias Senior Manager, Nuclear Safety & Licensing Vice President, Engineering Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations P.O. Box 31953 P.O. Box 31955 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Senior Vice President and COO Mr. John A. Ventosa Entergy Nuclear Operations, Inc.
GM, Engineering 440 Hamilton Avenue Entergy Nuclear Operations White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Assistant General Counsel Entergy Nuclear Operations, Inc.
Mr. Joseph P. DeRoy 440 Hamilton Avenue VP, Operations Support White Plains, NY 10601 Entergy Nuclear Operations, Inc.
P.O. Box 31955 Vice President, Operations Jackson, MS 39286-1995 Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station Mr. John R. Dreyfuss P.O. Box 250 Director, NSA Governor Hunt Road Entergy Nuclear Operations Vernon, VT 05354 Vermont Yankee Nuclear Power Station P.O. Box 250 Mr. James H. Sniezek Governor Hunt Road 5486 Nithsdale Drive Vernon, VT 05354 Salisbury, MD 21801 Manager, Licensing Mr. Garrett D. Edwards Entergy Nuclear Operations, Inc. 814 Waverly Road Vermont Yankee Nuclear Power Station Kennett Square, PA 19348 P.O. Box 250 Governor Hunt Road Vernon, VT 05354
Vermont Yankee Nuclear Power Station cc:
Ms. Stacey M. Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. Norman L. Rademacher Director, NSA Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernont, VT 05354 Mr. Raymond Shadis New England Coalition Post Office Box 98 Edgecomb, ME 04556 Mr. James P. Matteau Executive Director Windham Regional Commission 139 Main Street, Suite 505 Brattleboro, VT 05301 Uldis Vanags State Nuclear Engineer Vermont Department of Public Service 112 State Street Montpelier, VT 05620-2601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306
July 16, 2008 Vice President, Operations Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - REVIEW OF THE SPENT FUEL MANAGEMENT PLAN (TAC NO. MD8035)
Dear Sir or Madam:
By letter dated March 21, 2007 (Agencywide Documents and Management System (ADAMS)
Accession No. ML070860696), Entergy Nuclear Operations, Inc. (the licensee) submitted the report pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.54(bb) titled Vermont Yankee Nuclear Power Station - Program for Maintenance of Irradiated Fuel and supplemental submittal (ML081200753) dated April 24, 2008, titled Response to Request for Additional Information. These submittals address how Vermont Yankee Nuclear Power Station (VY) will meet the requirements set forth in 10 CFR 50.54(bb).
The Nuclear Regulatory Commission (NRC) staff completed its review and determined that we are unable to provide preliminary approval of Entergy VYs spent fuel management program under 10 CFR 50.54(bb). The NRC staffs basis for not providing preliminary approval of Entergy VYs spent fuel management plan is documented in the enclosed safety evaluation. It is requested that the licensee provide a revised spent fuel management plan within 90 days.
Sincerely,
/RA/
James Kim, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271
Enclosure:
Safety Evaluation cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlLpl1-1 RidsNrrPMJKim RidsOgcMailCenter LPL1-1 RF RidsNrrDprPfpb RidsNrrLASLittle RidsAcrsAcnw&mMailCenter RidsNrrDorlDpr RPowell, RI CPittiglio RidsRgn1MailCenter RidsNrrOd RidsNrrAdes SWilliams, EDO RI Accession No.: ML081700564 OFFICE LPLI-1/PM LPLI-1/LA PFFB/BC (A) OGC LPLI-1/BC NAME JKim SLittle MDusaniwskyj SUttal MKowal DATE 6/19/08 6/24/08 6/25/08 7/14/08 7/16/08 OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO SPENT FUEL MANAGEMENT PROGRAM ENTERGY NUCLEAR OPERATIONS, INC.
VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 On March 21, 2007, Entergy Nuclear Operations, Inc. (Entergy) submitted a report pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.54(bb) titled Vermont Yankee Nuclear Power Station - Program for Maintenance of Irradiated Fuel. On March 12, 2008, the Nuclear Regulatory Commission (NRC) staff issued a request for additional information (RAI) to Entergy.
On April 24, 2008, Entergy submitted a report in response to the NRC staffs RAI dated March 12, 2008 (ML080710307). The NRC staff has reviewed Entergys submittals and, has concluded that it cannot give preliminary approval of Entergys spent fuel management program at this time.
Entergys response to the NRC staffs RAIs stated, Entergy VY plans to use funds from the decommissioning trust fund to cover spent fuel management costs. Title 10 of the Code of Federal Regulations (10 CFR) 50.75, requires that licensees provide decommissioning funding assurance for decommissioning costs. Such costs do not include spent fuel management costs under 10 CFR 50.54(bb). Funds placed in the decommissioning trust fund may only be used for decommissioning, unless the funds are in addition to decommissioning funds and if they have been earmarked for spent fuel management. Entergy has not earmarked such funds and does not have a separate subaccount to address spent fuel management costs. Furthermore, 10 CFR 50.75 allows a licensee who has submitted a site-specific cost estimate to take credit for projected earnings on the decommissioning trust fund using up to 2 percent annual real rate of return through the decommissioning period. A licensee may use a credit of greater than 2 percent and only up to the time of license expiration, if the licensees rate-setting authority has specifically authorized a higher rate. This is not the case for Entergy VY. Entergy VYs plan uses a real rate of return of greater than 2 percent through the specified SAFSTOR period, based on Entergys position that it is reasonable to consider historical performance of the fund, and Entergys pending request for license renewal, in order to show sufficient funds would be available to complete decommissioning.1 VYs use of greater than 2 percent is not authorized by a rate-setting authority, and as noted, no licensee may use a greater than 2 percent real rate of return after their license expiration. Therefore, it is unacceptable for VY to use greater than 2 percent real rate of return.
1 Although Entergy VY states that part of the basis for using greater than a 2 percent real rate of return is based on historical performance, Entergys trust fund balance as of December 31, 2006, was $416.5 million and as of December 31, 2007, was $439.6 million. Assuming an inflation rate of 3.3 percent based on recent historical figures, the trust fund only achieved a real rate of return of approximately 2 percent for the period from December 31, 2006 to December 31, 2007.
Enclosure
The NRC staff performed independent calculations regarding the Entergy plan. A 2 percent real rate of return on the trust fund balance of $439.6 million as of December 31, 2007, was applied.
The expenses identified in Table 3.5 of Entergy VYs submittal (ML080430658) dated February 6, 2008, titled Decommissioning Cost Analysis for the Vermont Yankee Nuclear Power Station were deducted from the decommissioning fund balance. The staff also added the $60.0 million (Entergys parent company commitment) in 2026. The NRC staffs result for the scenario analyzed, did not demonstrate that sufficient funds would be available to address decommissioning costs after the spent fuel expenditures projected to be spent prior to the completion of decommissioning were deducted. The review was based on the scenario that used a current license expiration date of 2012 with SAFSTOR and decontamination starting in 2043 (Table 3.5 of Entergy VYs submittal (ML080430658) dated February 6, 2008).
Withdrawals of the trust fund under 10 CFR 50.82(a)(8)(i)(A) are limited to legitimate decommissioning activities consistent with the definition of decommissioning. In addition, withdrawals under 10 CFR 50.82(a)(8)(i)(C) are not permitted if they would inhibit the ability of the licensee to complete funding of any shortfalls in the decommissioning trust needed to ensure the availability of funds to ultimately release the site and terminate the license. For the scenario that was indentified in Entergy VYs submittal and supplement, Entergy VY did not identify or acknowledge in their proposed spent fuel management plan the necessity for an exemption in accordance with 10 CFR 50.12, from the requirements of 10 CFR 50.82(a)(8)(i)(A) in order to use the decommissioning trust funds for spent fuel management expenses. In addition, Entergy did not propose to include a financial mechanism in the amount of the initial spent fuel management expenditures of approximately $160.0 million or other sufficient amount to provide reasonable assurance the spent fuel management withdrawals would not inhibit the ability of the licensee to complete radiological decommissioning.
Based on the foregoing discussion, the NRC staff is unable to provide preliminary approval of Entergy VYs spent fuel management program under 10 CFR 50.54(bb).
Principal Contributor: Larry Pittglio Date: July 16, 2008 Enclosure