July 10, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NOS. 1 & 2, PROPOSED ALTERNATIVE RELIEF REQUEST FOR PRESSURIZER SAFETY VALVES-Q1/2B13-RR-V-2 (TAC NOS. MD6788 AND MD6789)
Dear Mr. Johnson:
By letter dated September 17, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072600203), Southern Nuclear Operating Company, Inc. submitted a request to allow proposed alternative Q1/2B13-RR-V-2, which involved an extension to the ASME OM Code 5-year test interval for Unit 1 Pressurizer Safety Valve (PSV) Serial Number (S/N) N56963-01-0003 and Unit 2 PSVs S/N N56963-01-0005 and S/N N56963-01-0013. The ASME OM Code 5-year test interval for these valves expired in March 2006, October 2006, and September 2007, respectively.
By letter dated June 26, 2008, (ADAMS Accession No. ML081790344), SNC submitted a withdrawal of this request. The letter identified that a risk analysis had been performed for the missed surveillances associated with these valves. The letter also identified that the U1 PSVs had been replaced with valves that meet the test-to-test surveillance date criteria, and that the Unit 2 PSVs would be replaced during the fall 2008 refueling outage with valves that meet the test-to-test surveillance date criteria.
This letter acknowledges this withdrawal and concludes the work performed on these tasks.
Sincerely,
/RA/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: See next page
ML081790344), SNC submitted a withdrawal of this request. The letter identified that a risk analysis had been performed for the missed surveillances associated with these valves. The letter also identified that the U1 PSVs had been replaced with valves that meet the test-to-test surveillance date criteria, and that the Unit 2 PSVs would be replaced during the fall 2008 refueling outage with valves that meet the test-to-test surveillance date criteria.
This letter acknowledges this withdrawal and concludes the work performed on these tasks.
Sincerely,
/RA/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: See next page Distribution:
Public RidsAcrsAcnw_MailCenterResource RidsNrrPMRJerveyResource LPL2-1 R/F RidsNrrDorlLpl2-1Resource RidsNrrLAGLappertResource RidsOgcRpResource RidsNrrDirscptbResource RidsRgn2MailCenterResource ADAMS Accession No. Ml081690888 OFFICE NRR/LPL2-1/PM NRR/LPL4/LA NRR/LPL2-1/BC NAME RJervey GLappert MWong DATE 7/10/08 7/10/08 7/10/08
Joseph M. Farley Nuclear Plant, Units 1 & 2 cc:
Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319 Mr. B. D. McKinney, Licensing Manager Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm P.O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Mr. J. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201 State Health Officer Alabama Department of Public Health 434 Monroe St.
Montgomery, AL 36130-1701 Chairman Houston County Commission P.O. Box 6406 Dothan, AL 36302 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company, Inc.
P.O. Box 470 Ashford, AL 36312