June 11, 2008 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
Entergy Nuclear Generation Co. and
)
Entergy Nuclear Operations, Inc.
)
Docket No. 50-293-LR
)
)
ASLBP No. 06-848-02-LR (Pilgrim Nuclear Power Station)
)
NRC STAFF PROPOSED TRANSCRIPT CORRECTIONS The staff of the Nuclear Regulatory Commission (Staff) hereby proposes the following corrections to the transcript of the April 10, 2008 hearing regarding the application for renewal of the operating license for the Pilgrim Nuclear Power Station (Pilgrim). Omitted from the list are obvious typographical errors, capitalization errors and grammatical errors that do not alter the meaning of the statements.
Staff Proposed Corrections to the April 10, 2008 Hearing Transcript Transcript Page/Line Transcript Correction 564/5 Add they between then and can" 567/11 Replace STAFF with AUDIENCE MEMBER 586/7&22 Change Tenure to Ten year 588/6 Change bending to thinning 588/22 Change contained to titled 659/23 Change in toward to into 663/16 Change 12 to 2012 666/7 Add have between not and any
668/3 Add do between to and more 668/11 Change see to seem 674/12 Change MR. SULLIVAN to UNKNOWN 675/24 Change scarfing to scraping 685/13 Change scarfed to scraped 686/21, 688/22,24 Change mls to mils 696/2 Change bi to big 718/24 Change relates to related 724/23 Change thin to pin 737/5 Change phase to phased 739/4 Change HPSI and RPSI to HPCI and RCIC 744/2, 746/3 Change Tebo to Thibault 744/5, 746/4 Change THE CLERK to MS. THIBAULT 755/4 Change expect to expected 765/3 Change MR. LEWIS to DR. AHLFELD 770/7 Change iron to ions 772/7 Change Set hats to So thats 789/4 Change MR. COX to MR. CHAN 795/20 Change HCIC to HPIC 795/23 Change whole to hole 809/25 Change PARTICIPANT to MS. LAMPERT 818/8 Add had between you and contamination 832/5 Change CHAIR YOUNG to MS. UTTAL 848/15 Change ruling to a rule
848/17 Change PARTICIPANT to MR. LEWIS 859/17 Change COMMISSIONER EDWARDS to MR. GUNDERSON 864/1 Change Our cause to Is cost Respectfully submitted,
/RA/
Susan L. Uttal Counsel for NRC Staff Dated at Rockville, Maryland this 11th day of June, 2008
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
Entergy Nuclear Generation Co. and
)
Entergy Nuclear Operations, Inc.
)
Docket No. 50-293-LR
)
(Pilgrim Nuclear Power Station)
)
ASLBP No. 06-848-02-LR
)
CERTIFICATE OF SERVICE I hereby certify that copies of NRC STAFF PROPOSED TRANSCRIPT CORRECTIONS in the above-captioned proceeding have been served on the following by electronic mail and by deposit in the U.S. Nuclear Regulatory Commissions internal mail system, or, as indicated by an asterisk (*), by electronic mail and by deposit in the U.S. Mail system this 11th day of June, 2008.
Administrative Judge Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Richard.Cole@nrc.gov Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Paul.Abramson@nrc.gov Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Ann.Young@nrc.gov Office of Commission Appellate Adjudication Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMAIL.Resource@nrc.gov Atomic Safety and Licensing Board Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (VIA INTERNAL MAIL ONLY)
Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: Hearing.Docket@nrc.gov Sheila Slocum Hollis*
Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.com Terence A. Burke, Esq.*
Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 E-mail: tburke@entergy.com Mary Lampert*
148 Washington Street Duxbury, MA 02332 E-mail: mary.lampert@comcast.net David R. Lewis, Esq*.
Paul A. Gaukler, Esq.
Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Chief Kevin M. Nord*
Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 E-mail: nord@town.duxbury.ma.us Town Manager*
Town of Plymouth 11 Lincoln St.
Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us Richard R. MacDonald*
Town Manager 878 Tremont Street Duxbury, MA 02332 E-mail: macdonald@town.duxbury.ma.us Matthew Brock*
Assistant Attorney General, Chief Environmental Protection Division Office of the Attorney General One Ashburton Place, 18th Floor Boston, MA 02108 E-mail: matthew.brock@state.ma.us Diane Curran*
Harmon, Curran, Spielberg, & Eisenberg, LLP 1726 M Street N.W., Suite 600 Washington, D.C. 20036 E-mail: dcurran@harmoncurran.com
/RA/
Susan L. Uttal Counsel for the NRC Staff