Text
June 3, 2008 EA-08-148 Mr. Britt T. McKinney Senior Vice-President & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd. - NUCSB3 Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION - NRC INVESTIGATION REPORT NO. 1-2007-027
Dear Mr. McKinney:
This refers to the investigation conducted by the U.S. Nuclear Regulatory Commissions (NRC)
Office of Investigations (OI) from April 26, 2007 to January 30, 2008, at your Susquehanna Steam Electric Station (Susquehanna). The investigation was initiated after you informed the NRC on April 7, 2007, that contract carpenters had removed a Unit 2 high radiation area barrier and posting without approval of the Health Physics (HP) department on April 6, 2007, in an area where dose rates were up to 200 mRem per hour.
As a result of the OI investigation, the NRC confirmed the results of your independent investigation that the contract carpenters had removed the barrier and posting without approval or knowledge of the HP department. The OI investigation also found that one of the carpenters deliberately took action that resulted in the removal of the barrier. Specifically, the carpenter intentionally unscrewed the clip holding the chain to the top of one of the stanchions and removed the chain and the postings. The NRC concluded that the carpenter acted willfully and that the deliberate action caused Susquehanna to be in violation of Technical Specification 5.7.1, High Radiation Areas, of Facility Operating License NPF-22, which requires that each entry into such an area be barricaded and conspicuously posted as a high radiation area.
Based on the evidence developed during this investigation, the NRC has determined that this violation is appropriately categorized at Severity Level (SL) IV. In making this determination, the NRC considered that the potential for workers to receive an over-exposure during the short duration the high radiation area was unbarricaded was low. The NRC also considered whether the severity level should have been increased, given the willful nature of the violation, but determined not to escalate the severity, given that: (1) the violation involved the acts of a non-supervisory individual in your organization; (2) the significance of the underlying violation was low; and, (3) there was no tangible benefit to be gained from having been responsible for causing the violation. Therefore, the severity is appropriately categorized at SLIV.
This SL IV violation is not being cited because the issue was previously dispositioned as a licensee-identified violation of Technical Specification 5.7.1 of very low significance (Green) in the Susquehanna integrated inspection report 2007-003, issued July 24, 2007 (ML072070055).
B. McKinney 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction.
Sincerely,
/RA/
David C. Lew, Director Division of Reactor Projects Docket No. 50-388 License No. NPF-22
Enclosure:
Factual Summary cc w/encl:
C. Gannon, Vice President, Nuclear Operations R. Paley, General Manager, Plant Support R. Pagodin, General Manager, Nuclear Engineering R. Sgarro, Manager, Nuclear Regulatory Affairs R. Smith, General Manager, Site Preparedness and Services M. Crowthers, Supervising Engineer, Nuclear Regulatory Affairs R. Peal, Mgr, Training, Susquehanna M. Rose, Manager, Quality Assurance J. Scopelliti, Community Relations Manager, Susquehanna B. Snapp, Esq., Associate General Counsel, PPL Services Corporation Supervisor, Document Control Services R. Osborne, Allegheny Electric Cooperative, Inc.
D. Allard, Dir, PA Dept of Environmental Protection Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee, Sierra Club E. Epstein, TMI-Alert (TMIA)
J. Powers, Dir, PA Office of Homeland Security R. French, Dir, PA Emergency Management Agency
B. McKinney 3
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if you choose to provide one, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction.
Sincerely,
/RA/
David C. Lew Director Division of Reactor Projects Docket No. 50-388 License No. NPF-22 Distribution w/encl:
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP F. Jaxheimer, DRP, Sr RI Susquehanna G. Ottenberg, DRP, Actg RI Susquehanna S. Farrell, DRP, OA Susquehanna S. Williams, RI OEDO R. Nelson, NRR M. Kowal, NRR J. Kim, NRR B. Vaidya, NRR, PM J. Hughey, Backup, NRR A. DeFrancisco, ORA R. Summers, ORA D. Holody, ORA M. Gamberoni, DRS E. Wilson, OI K. Farrar, RC C. Carpenter, OE A. Sapountzis, OE OEMAIL Region I Docket Room (with concurrences)
SUNSI Review Complete: PGK (Reviewer=s Initials)
DOCUMENT NAME: S:\\Enf-allg\\Enforcement\\Proposed-Actions\\Region1\\HRABarrierPPLRev2.doc ML081550624 After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" =
No copy OFFICE RI/DRP RI/DRP RI/OI RI/ORA RI/ORA NAME RFuhrmeister/RLF PKrohn/PGK EWilson/EPW KFarrar/KLF DHolody DATE 05/23/08 05/23/08 05/29/08 05/29/08
/ /08 OFFICE RI/DRP NAME DLew/DCL DATE 05/ 30 /08 OFFICIAL RECORD COPY