ML081500707
| ML081500707 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 04/23/2008 |
| From: | - No Known Affiliation |
| To: | Division of License Renewal |
| References | |
| Download: ML081500707 (2) | |
Text
1 IPRenewal NPEmails From:
STROUD, MICHAEL D [MSTROUD@entergy.com]
Sent:
Wednesday, April 23, 2008 4:40 PM To:
Subject:
RE: Draft Telecon Summary--April 3, 2008 on Metal Fatigue, Bolted Connections, and Boraflex
- Kim, We have no clarifications or changes to this telecom.
Thanks Mike From: Kimberly Green [1]
Sent: Wednesday, April 23, 2008 12:38 PM To: STROUD, MICHAEL D; Tyner, Donna
Subject:
Draft Telecon Summary--April 3, 2008 on Metal Fatigue, Bolted Connections, and Boraflex Mike and Donna, Attached is the draft telecon summary of April 3, 2008, on metal fatigue, bolted connections, and boraflex.
Please let me know if any clarification/changes are necessary.
- Thanks, KimberlyGreen SafetyPM (301)4151627 kimberly.green@nrc.gov
Hearing Identifier:
IndianPointUnits2and3NonPublic_EX Email Number:
102 Mail Envelope Properties (A79A58994C541C48BBCFB319610763CB03A3AAB5)
Subject:
RE: Draft Telecon Summary--April 3, 2008 on Metal Fatigue, Bolted Connections, and Boraflex Sent Date:
4/23/2008 4:40:25 PM Received Date:
4/23/2008 4:41:07 PM From:
STROUD, MICHAEL D Created By:
MSTROUD@entergy.com Recipients:
"Kimberly Green" <Kimberly.Green@nrc.gov>
Tracking Status: None Post Office:
LITEXETSP002.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 695 4/23/2008 4:41:07 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: