V EDO Principal Correspondence Control FROM:
DUE: 06/12/08 EDO CONTROL: G20080363 DOC DT: 05/12/08 FINAL REPLY:
Thomas Gurdziel
- Oswego, New York TO:
Borchardt, EDO FOR SIGNATURE OF :
GRN CRC NO:
- Leeds, NRR DESC:
ROUTING:
Entergy/Indian Point (EDATS: OEDO-2008-0411)
DATE: 05/23/08 Borchardt Virgilio Mallett Ash Ordaz Cyr/Burns Collins, RI
- Adams, OEDO ASSIGNED TO:
NRR CONTACT:
Leeds SPECIAL INSTRUCTIONS OR REMARKS:
1T0p4aA'e-Eb L o oOI E--- $ý (b 5 '. E-bD -D [
EDATS Number: OEDO-2008-041.1 Source: OEDO Genera Inoraio Assigned To: NRR Other Assignees:
Subject:
Entergy/Indian Point
==
Description:==
CC Routing: Region I ADAMS Accession Numbers -
Incoming: NONE OEDO Due Date: 6/12/2008 5:00 PM SECY Due Date: NONE Response/Package: NONE Othe Inforatio Cross Reference Number: G20080363 Related Task:
File Routing: EDATS Staff Initiated: NO Recurring Item: NO Agency Lesson Learned: NO Roadmap Item: NO Action Type: Letter Priority: Medium Sensitivity: None Signature Level: NRR Urgency: NO OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions:
Doumn Infomaio Originator Name: Thomas Gurdziel Date of Incoming: 5/12/2008 Originating Organization: Citizens Document Received by OEDO Date: 5/22/2008 Addressee: R. William Borchardt, EDO Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of I
9 Twin Orchard Drive Oswego, NY 13126 May 12, 2008.
Mr. R. William Borchardt Executive Director for Operations US Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Mr. R. William Borchardt:
Loss Prevention, or Hedging a Bet I thought I would take the time now to point out some steps that may make your life a little easier in the future. Your agency is not getting along too well with one of our Senators. As you know, she is running for President. If she does become President, taking these steps, starting now, may be beneficial.
Step 1 The required-by-law backup power emergency sirens at Entergy/Indian Point are still not accepted as operable. Very substantial immediate enforcement type action is needed here.
Step 2 The unloading of the Entergy/Indian Point Unit 1 spent fuel pool has not begun but the contaminated water leakage into the ground continues. Take action here.
Step 3 The report of the contaminated groundwater at the Entergy/Indian Point site has been completed. (I read it and the work reported appeared quite thorough.) There are two recommendations: leave the contaminated groundwater in place using a terminology of "Monitored Natural Attenuation" (which, I think, means decay in place), and stop the source of the contaminated water. I have not seen any document in ADAMS that states that all Entergy ownership organizations agree to follow the recommendations. Find out why not.
Step 4 More generally, consider as a part of relicensing, plant owner decisions and results attained. Specifically, if Entergy Corporation and 7 lower tier ownership organizations cannot complete a $15 million project one year AFTER the required date, should you really allow them 20 more years? (The 7 are: Entergy Nuclear Holding Company, EN Holding Co #3 LLC, EN Inv. Co. LLC, Entergy International Holdings LTD, Entergy Global LLC, Entergy Nuclear Holding Company #1, and EN New York Inv. Co). Oh, don't forget 2 more: EN Indian Point 2 LLC and EN Indian Point 3 LLC.
And, probably there are even more for Unit 1.
EDO -- G20080 3 6 3
Step 5 Make clear to all US NRC employees that your primary mission is to ensure the safe power operation (or safe cold shutdown) of the existing plants, NOT promote high capacity factors or nuclear industry growth.
Your staff may notice that this letter, dated March 13, 2008, was sent already. I am sending it again since it has not been answered. This way, it will not get lost in the upper management turnover. Please note that, with the possible exception of Step 3, these points are still valid two months later.
NRC FORM 253 U.S. NUCLEAR REGULATORY COMMISSION DATE OF REQUEST CONTROL NUMBER (9-96)
MESSENGER/COURIER RECEIPT
.522-2.:-- 0?
TO:
OFFICE BUILDING ROOM NUMBER FROM:
OFFIC D
BUILDING ROOM NUMBER
/ 0owtas 6&cze(~k<(WSP3 7
DESCRIPTION MESSENGER/COURIER SIGNATURE 2'(o MESSENGER/COURIER DATE RECEIVED
-7o6&'-O( 3-0-22 2m A'MESSENGER/COUIRIER DATE RECEIVED TIME RECEIVED RECIPIENT'S SIGNATURE RECIPIENT DA ECELED SENDER:
MESSENGER/COURIER:
REClPIEI*JT:
- 1. Complete "DATE OF REQUEST," "TO:," "FROM:,"
- 1. Deliver package to recipient or next messenger/
- 1. Provide signature, date received, and time received and unclassified "DESCRIPTION" blocks, courier enroute to addressee, in the appropriate blocks.
- 2. Obtain MESSENGER/COURIER signature, date
- 2. Obtain MESSENGER/COURIER or RECIPIENT
- 2. Retain RECIPIENT'S COPY.
received, and time received in first blocks provided, signature, date received, and time received in the
- 3. Return original to mesenger/courier immediately,
- 3. Retain "SENDER'S SUSPENSE COPY."
appropriate blocks provided, who will return it to the sender.
NRC FORM 253 (9-96)
PRINTED ON RECYCLED PAPER RECIPIENT'S COPY