ML081430623
| ML081430623 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/22/2008 |
| From: | Eric Duncan Plant Support Branch II |
| To: | Schwarz C Entergy Nuclear Operations |
| References | |
| Download: ML081430623 (5) | |
Text
May 22, 2008 Mr. Christopher J. Schwarz Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
SUMMARY
OF THE PALISADES MAY 12, 2008, NON-PUBLIC MEETING TO DISCUSS END OF CYCLE SECURITY PERFORMANCE FOR CALENDAR YEAR 2007
Dear Mr. Schwarz:
On May 12, 2008, the Nuclear Regulatory Commission (NRC) held a Non-Public Meeting at the Palisades Nuclear Plant, located at 27780 Blue Star Memorial Highway, Covert, Michigan. The purpose of the meeting was to discuss the NRC End-of-Cycle assessment of Palisades Nuclear Plant security performance for the 2007 calendar year.
Mr. Eric Duncan, Chief, Plant Support Branch, Division of Reactor Safety, Region III, opened the meeting with an introduction of NRC officials, the reason for the meeting, and a review of the NRCs Reactor Oversight Process. Mr. Duncan then discussed the Palisades Nuclear Plant Security Performance for the 2007 calendar year and provided the licensee with an opportunity to provide any response and remarks.
Mr. Duncan then adjourned the meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and the attendance listing will be available electronically for public
C. Schwarz inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255;72-007 License No. DPR-20
Enclosure:
Meeting Attendees cc w/encl:
Senior Vice President Vice President Oversight Senior Manager, Nuclear Safety & Licensing Senior Vice President and COO Assistant General Counsel Manager, Licensing W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor T. Strong, Chief, State Liaison Officer, State of Michigan Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Michigan Office of the Attorney General
C. Schwarz inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255;72-007 License No. DPR-20
Enclosure:
Meeting Attendees cc w/encl:
Senior Vice President Vice President Oversight Senior Manager, Nuclear Safety & Licensing Senior Vice President and COO Assistant General Counsel Manager, Licensing W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor T. Strong, Chief, State Liaison Officer, State of Michigan Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Michigan Office of the Attorney General DOCUMENT NAME: PalisadesMeetingSummary.doc 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME GHansen: jb CLipa EDuncan DATE 05/22/08 05/22/08 05/22/2008 OFFICIAL RECORD COPY
Letter to Christopher J. Schwarz from Eric Duncan dated May 22, 2008.
SUBJECT:
SUMMARY
OF THE PALISADES MAY 12, 2008, NON-PUBLIC MEETING TO DISCUSS END OF CYCLE SECURITY PERFORMANCE FOR CALENDAR YEAR 2007 DISTRIBUTION:
FES TEB RidsNrrDirsIrib MAS KGO JKH3 JBG Palisades SRI CAA1 DRPIII DRSIII PLB1 TXN
Enclosure MEETING PRINCIPAL ATTENDEES May 12, 2008 Entergy Christopher Schwarz Site Vice President Tom Kirwin Plant Manager Charles Arnone Nuclear Oversight Supervisor Laurie Lahti Licensing Manager Nuclear Regulatory Commission Eric Duncan Chief, Plant Support Branch, Region III Christine Lipa Chief, Branch 4, Division of Reactor Projects, Region III John Ellegood Senior Resident Inspector, Palisades John (Jack) Giessner Resident Inspector, Palisades