Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse Task No: 061-010-04-0401 Task
Title:
Relieve Steam Binding of the MDFP K/A
Reference:
061 A2.04 (3.4/3.8)
I Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance _X__
Actual Performance _ _
Classroom ___
Simulator _ _
Plant _X_
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant is at 100% power The Motor Driven Feedwater Pump is in the Auxiliary Feedwater mode with casing temperature at 205°F Task Standard:
Isolate the Motor Driven Feedwater Pump discharge from the Steam Generators and vent the pump and pump seals from the Condensate Storage Tank Required Materials:
General
References:
DB-OP-06225, Motor Driven Feedwater Pump Operating Procedure Initiating Cue:
The Unit Supervisor directs you to relieve the Motor Driven Feedwater Pump steam binding in accordance with step 4.1.7 of DB-OP-06225, Motor Driven Feedwater Pump Operating Procedure You have a locked valve key and permission to operate any required locked valves Time Critical Task: No Validation Time:
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:
The plant is at 100% power The Motor Driven Feedwater Pump is in the Auxiliary Feedwater mode with casing temperature at 205°F INITIATING CUES:
The Unit Supervisor directs you to relieve the Motor Driven Feedwater Pump steam binding in accordance with step 4.1.7 of DB-OP-06225, Motor Driven Feedwater Pump Operating Procedure You have a locked valve key and permission to operate any required locked valves
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time
- 1.
PERFORMANCE STEP: Remove Close Control Power Fuses from AD 210, MDFP STANDARD: Remove Close Power fuse clip holder from breaker cubicle AD 210 on D2 Bus CUE:
Close Control Power Fuses have been removed SAT UNSAT
- 2.
PERFORMANCE STEP: Close FW 1008, MDFP Outlet Isolation STANDARD: Padlock unlocked and chain removed. FW 1008 closed COMMENT: This step must be done prior to any of the following steps CUE:
(FW 1008) Padlock has been UNLOCKED and chain REMOVED Handwheel rotated clockwise Valve stem travels IN SAT UNSAT
- 3.
PERFORMANCE STEP: Open FW 1007, MDFP Casing Vent STANDARD: Cap removed. FW 1007 opened COMMENT: Individual may simulate installing a crows foot and hose to route steam and hot water to floor drains CUE:
(FW 1007) cap removed Handwheel rotated counterclockwise Steam emits from the vent until water comes out Casing temperature is 100°F and lowering SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 4.
PERFORMANCE STEP: Close FW 1007, MDFP Casing Vent STANDARD: FW 1007 closed. The cap is installed COMMENT: Capping not critical CUE:
(FW 1007) Handwheel rotated clockwise Water flow stops Cap is installed SAT UNSAT
- 5.
PERFORMANCE STEP: Open FW 128, MDFP Outboard Seal Vent STANDARD: Cap removed. FW 128 opened COMMENT: Candidate may simulate installing a crows foot and hose to route steam and hot water to floor drains CUE:
(FW 128) cap removed Handwheel rotated counterclockwise Steam emits from the vent until water comes out SAT UNSAT
- 6.
PERFORMANCE STEP: Close FW 128, MDFP Outboard Seal Vent STANDARD: FW 128 closed. The cap is installed COMMENT: Capping not critical CUE:
(FW 128) Handwheel rotated clockwise Water flow stops Cap is installed SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 7.
PERFORMANCE STEP: Open FW 1004, MDFP Motor End Seal Vent STANDARD: Cap removed. FW 1004 opened COMMENT: Candidate may simulate installing a crows foot and hose to route steam and hot water to floor drains CUE:
(FW 1004) cap removed Handwheel rotated counterclockwise Water comes out SAT UNSAT
- 8.
PERFORMANCE STEP: Close FW 1004, MDFP Motor End Seal Vent STANDARD: FW 1004 closed. The cap is installed COMMENT: Capping not critical CUE:
(FW 1007) Handwheel rotated clockwise Water flow stops Cap is installed SAT UNSAT
- 9.
PERFORMANCE STEP: Open FW 172, MDFP Seal Water Cooler 1 Vent STANDARD: Cap removed. FW 172 opened COMMENT: Candidate may simulate installing a crows foot and hose to route steam and hot water to floor drains CUE:
(FW 1004) cap removed Handwheel rotated counterclockwise Water comes out SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 10. PERFORMANCE STEP: Close FW 172, MDFP Seal Water Cooler 1 Vent STANDARD: FW 172 closed. The cap is installed COMMENT: Capping not critical CUE:
(FW 172) Handwheel rotated clockwise Water flow stops Cap is installed SAT UNSAT
- 11. PERFORMANCE STEP: Open FW 173, MDFP Seal Water Cooler 2 Vent STANDARD: Cap removed. FW 173 opened COMMENT: Candidate may simulate installing a crows foot and hose to route steam and hot water to floor drains CUE:
(FW 173) cap removed Handwheel rotated counterclockwise Water comes out SAT UNSAT
- 12. PERFORMANCE STEP: Close FW 173, MDFP Seal Water Cooler 2 Vent STANDARD: FW 173 closed. The cap is installed COMMENT: Capping not critical CUE:
(FW 173) Handwheel rotated clockwise Water flow stops Cap is installed SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 13. PERFORMANCE STEP: Open FW 1008, MDFP Outlet Isolation Valve.
STANDARD: FW 1008 opened. Chain installed. Padlock locked COMMENT: Installing the chain and locking NOT critical CUE:
(FW 1008) Handwheel rotated counterclockwise Valve stem comes OUT Handwheel chained installed Padlocked locked SAT UNSAT
- 14. PERFORMANCE STEP: Install Close Control Power Fuses from AD 210, MDFP STANDARD: Close Power fuse clip holder installed in breaker cubicle AD 210 on D2 Bus CUE:
Close Control Power Fuses are installed SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the candidate)
END TIME
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.
H Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
Response:_____________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse Task No: 064-008-05-0401 Task
Title:
Emergency Shutdown an Emergency Diesel Generator K/A
Reference:
056 AA2.14 (4.4/4.6)
J Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance _X_
Actual Performance _ _
Classroom ___
Simulator _ _
Plant _X_
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
A loss of offsite power has occurred The reactor tripped Component Cooling Water Pump 1(2) did not start Task Standard:
Perform an emergency shutdown of an Emergency Diesel Generator by isolating fuel to the engine Required Materials:
General
References:
DB-OP-06316, Diesel Generator Operating Procedure Initiating Cue:
The Unit Supervisor directs you to emergency shutdown Emergency Diesel Generator 1(2) in accordance with section 5.4(5.10) of DB-OP-06316, Diesel Generator Operating Procedure Time Critical Task: No Validation Time: 15 Minutes
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET Train 1 INITIAL CONDITIONS:
A loss of offsite power has occurred The reactor tripped Component Cooling Water Pump 1 did not start INITIATING CUES:
The Unit Supervisor directs you to emergency shutdown Emergency Diesel Generator 1 in accordance with section 5.4 of DB-OP-06316, Diesel Generator Operating Procedure
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time
- 1.
PERFORMANCE STEP: Attempt to shutdown EDG 1 with Emergency Shutdown pushbutton STANDARD: Depress Emergency Shutdown Pushbutton on Panel C3621 CUE: Emergency shutdown pushbutton is DEPRESSED The EDG continues to run at 900 RPM SAT UNSAT
- 2. PERFORMANCE STEP: Attempt to shutdown EDG 1 with the Fuel Rack Lever STANDARD: Pull and hold the Fuel Rack Lever CUE:
Fuel Rack lever has been pulled back The EDG slows down and stops The EDG restarts when the Fuel Rack Level is released The EDG continues to run at 900 RPM SAT UNSAT
- 3.
PERFORMANCE STEP: Verify AC 101, EDG 1 Output Breaker, is open STANDARD: Recognize AC101 has NOT opened Comment: Candidate may route to Performance Step 6 to shutdown the EDG CUE: AC101 RED light is LIT; GREEN light is OFF (If candidate attempts to manually open AC101) AC101 does NOT open. RED light is LIT; GREEN light is OFF SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 4.
PERFORMANCE STEP: Isolate starting air to EDG 1 STANDARD: Unlock padlock Remove locking wire Close DA 30, Diesel Generator Air Receiver 1-1 Discharge Isolation Comment: Candidate may route to Performance Step 6 to shutdown the EDG CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 30 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 5.
PERFORMANCE STEP: Isolate starting air to EDG 1 STANDARD: Unlock padlock Remove locking wire Close DA 44, Diesel Generator Air Receiver 1-2 Discharge Isolation Comment: Candidate may route to Performance Step 6 to shutdown the EDG CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 44 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 6.
PERFORMANCE STEP: Isolate Fuel Oil to EDG 1 STANDARD: Unlock padlock Remove locking wire Close DO 40, DC Motor Driven Fuel Oil Pump Suction COMMENT: DO 49, Emergency Diesel Generator Day Tank 1 Outlet may be closed instead of DO 40 and DO 41 Critical if DO 49 is not closed CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DO 40 rotated CLOCKWISE; stem is IN (If DO 41 is also closed) The EDG slows and stops running SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 7.
PERFORMANCE STEP: Isolate Fuel Oil to EDG 1 STANDARD: Unlock padlock Remove locking wire Close DO 41, Engine Driven Fuel Oil Pump Suction COMMENT: DO 49, Emergency Diesel Generator Day Tank 1 Outlet may be closed instead of DO 40 and DO 41 Critical if DO 49 is not closed CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DO 41 rotated CLOCKWISE; stem is IN (If DO 40 is also closed) The EDG slows and stops running SAT UNSAT
- 8.
PERFORMANCE STEP: Isolate Fuel Oil to EDG 1 STANDARD: Unlock padlock Remove locking wire DO 49, Emergency Diesel Generator Day Tank 1 Outlet COMMENT: Critical if DO 40 and DO 41 are not closed CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DO 49 rotated CLOCKWISE; stem is IN The EDG slows and stops running SAT UNSAT
- 9.
PERFORMANCE STEP: Verify open EDG 1 output breaker STANDARD: Visual check of breaker AC101 CUE: AC101 RED light is LIT; GREEN light is OFF AC101 Breaker Switch rotated to OFF/OPEN AC101 RED light goes OFF; GREEN light LIGHTS SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 10. PERFORMANCE STEP: Isolate starting air to EDG 1 STANDARD: Unlock padlock Remove locking wire Close DA 30, Diesel Generator Air Receiver 1-1 Discharge Isolation Comment: DA 30 may have been unlocked and closed earlier CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 30 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 11. PERFORMANCE STEP: Isolate starting air to EDG 1 STANDARD: Unlock padlock Remove locking wire Close DA 44, Diesel Generator Air Receiver 1-2 Discharge Isolation Comment: DA 44 may have been unlocked and closed earlier CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 44 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 12. PERFORMANCE STEP: Observe the EDG stops by 0 RPM indicated on the engine tachometer STANDARD: Observe the engine tachometer indicator CUE: Engine speed indicates 0 RPM SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)
END TIME
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET Train 2 INITIAL CONDITIONS:
A loss of offsite power has occurred The reactor tripped Component Cooling Water Pump 2 did not start INITIATING CUES:
The Unit Supervisor directs you to emergency shutdown Emergency Diesel Generator 2 in accordance with section 5.10 of DB-OP-06316, Diesel Generator Operating Procedure
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time
- 1.
PERFORMANCE STEP: Attempt to shutdown EDG 2 with Emergency Shutdown pushbutton STANDARD: Depress Emergency Shutdown Pushbutton on Panel C3622 CUE: Emergency shutdown pushbutton is DEPRESSED The EDG continues to run at 900 RPM SAT UNSAT
- 2. PERFORMANCE STEP: Attempt to shutdown EDG 2 with the Fuel Rack Lever STANDARD: Pull and hold the Fuel Rack Lever CUE:
Fuel Rack lever has been pulled back The EDG slows down and stops The EDG restarts when the Fuel Rack Level is released The EDG continues to run at 900 RPM SAT UNSAT
- 3.
PERFORMANCE STEP: Verify AD 101, EDG 2 Output Breaker, is open STANDARD: Recognize AD101 has NOT opened Comment: Candidate may route to Performance Step 6 to shutdown the EDG CUE: AD101 RED light is LIT; GREEN light is OFF (If candidate attempts to manually open AD101) AD101 does NOT open. RED light is LIT; GREEN light is OFF SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 4.
PERFORMANCE STEP: Isolate starting air to EDG 2 STANDARD: Unlock padlock Remove locking wire Close DA 31, Diesel Generator Air Receiver 2-1 Discharge Isolation Comment: Candidate may route to Performance Step 6 to shutdown the EDG CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 31 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 5.
PERFORMANCE STEP: Isolate starting air to EDG 2 STANDARD: Unlock padlock Remove locking wire Close DA 45, Diesel Generator Air Receiver 2-2 Discharge Isolation Comment: Candidate may route to Performance Step 6 to shutdown the EDG CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 45 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 6.
PERFORMANCE STEP: Isolate Fuel Oil to EDG 2 STANDARD: Unlock padlock Remove locking wire Close DO 57, DC Motor Driven Fuel Oil Pump Suction COMMENT: DO 53, Emergency Diesel Generator Day Tank 2 Outlet may be closed instead of DO 57 and DO 58 Critical if DO 53 is not closed CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DO 57 rotated CLOCKWISE; stem is IN (If DO 58 is also closed) The EDG slows and stops running SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 7.
PERFORMANCE STEP: Isolate Fuel Oil to EDG 2 STANDARD: Unlock padlock Remove locking wire Close DO 58, Engine Driven Fuel Oil Pump Suction COMMENT: DO 53, Emergency Diesel Generator Day Tank 2 Outlet may be closed instead of DO 57 and DO 58 Critical if DO 53 is not closed CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DO 58 rotated CLOCKWISE; stem is IN (If DO 57 is also closed) The EDG slows and stops running SAT UNSAT
- 8.
PERFORMANCE STEP: Isolate Fuel Oil to EDG 2 STANDARD: Unlock padlock Remove locking wire DO 53, Emergency Diesel Generator Day Tank 2 Outlet COMMENT: Critical if DO 57 and DO 58 are not closed CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DO 53 rotated CLOCKWISE; stem is IN The EDG slows and stops running SAT UNSAT
- 9.
PERFORMANCE STEP: Verify open EDG 2 output breaker STANDARD: Visual check of breaker AD101 CUE: AD101 RED light is LIT; GREEN light is OFF AD101 Breaker Switch rotated to OFF/OPEN AD101 RED light goes OFF; GREEN light LIGHTS SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 10. PERFORMANCE STEP: Isolate starting air to EDG 2 STANDARD: Unlock padlock Remove locking wire Close DA 31, Diesel Generator Air Receiver 2-1 Discharge Isolation Comment: DA 31 may have been unlocked and closed earlier CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 31 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 11. PERFORMANCE STEP: Isolate starting air to EDG 2 STANDARD: Unlock padlock Remove locking wire Close DA 45, Diesel Generator Air Receiver 2-2 Discharge Isolation Comment: DA 45 may have been unlocked and closed earlier CUE: (If asked) Field Supervisor has given permission to unlock valve Padlock unlocked and locking wire removed DA 45 rotated CLOCKWISE; stem is DOWN SAT UNSAT
- 12. PERFORMANCE STEP: Observe the EDG stops by 0 RPM indicated on the engine tachometer STANDARD: Observe the engine tachometer indicator CUE: Engine speed indicates 0 RPM SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)
END TIME
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.
J Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
Response:_____________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Facility: Davis-Besse Task No: 000-011-05-0100 Task
Title:
Restore the Makeup System During a Control Room Evacuation K/A
Reference:
068 AA1.13 (4.1/4.2)
K Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing:
Simulated Performance _X__
Actual Performance _ _
Classroom ___
Simulator _ _
Plant _X_
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
A hazardous condition has forced the evacuation of the Control Room There is NO fire in the Control Room area The following DB-OP-02508, Control Room Evacuation, actions were completed prior to evacuating the Control Room:
- The Reactor and Turbine were tripped
- SFRCS was manually actuated
- MU 2B, Reactor Coolant Letdown Cooler Inlet Isolation, was closed
- Makeup Pump 2 was the standby pump and has been started
- MU 32, Pressurizer Level Control, was set to 100 inches Task Standard: Reestablish Letdown, shutdown Makeup Pump 2 and realign the Makeup Pump suctions to the Makeup Tank following a Control Room Evacuation Required Materials:
General
References:
DB-OP-02508, Control Room Evacuation
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Initiating Cue:
The plant is now stable post-trip The Unit Supervisor directs restore the Makeup System in accordance with Step 4.0 of of DB-OP-02508, Control Room Evacuation You have an emergency key ring Time Critical Task: No Validation Time: 16 Minutes
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet CUE SHEET INITIAL CONDITIONS:
A hazardous condition has forced the evacuation of the Control Room There is NO fire in the Control Room area The following DB-OP-02508, Control Room Evacuation, actions were completed prior to evacuating the Control Room:
- The Reactor and Turbine were tripped
- SFRCS was manually actuated
- MU 2B, Reactor Coolant Letdown Cooler Inlet Isolation, was closed
- Makeup Pump 2 was the standby pump and has been started
- MU 32, Pressurizer Level Control, was set to 100 inches INITIATING CUES:
The plant is now stable post-trip The Unit Supervisor directs restore the Makeup System in accordance with Step 4.0 of of DB-OP-02508, Control Room Evacuation You have an emergency key ring
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a check mark Start Time Sequence of steps 1, 2, and 8 is not critical
- 1.
PERFORMANCE STEP: Reestablish Letdown STANDARD: Open MU2B, Reactor Coolant Letdown Cooler Inlet Isolation, using local switch on BE 1172 on MCC E11B CUE:
Local switch (on BE 1172) has been placed in OPEN Green light goes OFF Red light LIGHTS (If asked) The Unit Supervisor directs you to stop Makeup Pump 2 SAT UNSAT
- 2.
PERFORMANCE STEP: Stop the standby Makeup Pump STANDARD: OPEN/STOP pressed on NP0372A to stop Makeup Pump 2 COMMENT: Critical to stop the Makeup Pump before stopping the oil pumps CUE:
OPEN/STOP has been pressed on NP0372A Red light goes OFF Green light LIGHTS 2 minutes has elapsed since the Makeup Pump was stopped SAT UNSAT
- 3.
PERFORMANCE STEP: Stop the standby Makeup Pump's Main Oil Pump STANDARD: Press local STOP Button on NP0372B for Makeup Pump 2 Main Oil Pump CUE: Local STOP button has been pressed on NP0372B RED light goes OFF Green light LIGHTS SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 4.
PERFORMANCE STEP: Stop the standby Makeup Pump's Aux Oil Pump STANDARD: Press local STOP Button on NP0372C for Makeup Pump 2 Aux Oil Pump CUE: Local STOP button has been pressed on NP0372C RED light goes OFF Green light LIGHTS 3 minutes has elapsed since the Main Oil Pump and the Aux Oil Pump were stopped SAT UNSAT
- 5.
PERFORMANCE STEP: Stop the standby Makeup Pump's Aux Gear Oil Pump STANDARD: Press local STOP Button on NP0372D for Makeup Pump 2 Aux Gear Oil Pump CUE: Local STOP button has been pressed on NP0372D RED light goes OFF Green light LIGHTS SAT UNSAT
- 6.
PERFORMANCE STEP: Check Makeup Tank level greater than 50 inches STANDARD: Visual check of LI MU16 CUE:
LI MU16 indicates 78 inches SAT UNSAT
- 7.
PERFORMANCE STEP: Align the suction of Makeup Pump 2 to the Makeup Tank STANDARD: NV 3971 switch placed in MAKEUP TANK position CUE:
Switch NV 3971 has been placed in Makeup Tank position Top Red light goes OFF Bottom Red light LIGHTS SAT UNSAT
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet
- 8.
PERFORMANCE STEP: Align the suction of Makeup Pump 1 to the Makeup Tank STANDARD: NV 6405 switch placed in MAKEUP TANK position CUE:
Switch NV 6405 has been placed in Makeup Tank position Top Red light goes OFF Bottom Red light LIGHTS SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the Evaluator)
END TIME
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No.
K Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
Response:_____________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________