May 21, 2008 Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING THE REFUELING WATER STORAGE TANK LEVEL AMENDMENT (TAC NOS. MD5778 AND MD5779)
Dear Mr. Tynan:
By letter dated January 9, 2008, as supplemented by letters dated February 6, and March 5, 2008, Southern Nuclear Operating Company, Inc. (the licensee), submitted an application to change the nominal trip setpoint and corresponding allowable value of the refueling water storage tank (RWST) Level - Low at which the semi-automatic switchover from the RWST to the containment emergency sump occurs. The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal and has determined that additional information is required to complete its evaluation.
This question was discussed by teleconference May 8, 2008, with members of your staff.
The NRC staffs RAI is enclosed. The licensee is required to provide a response to the RAI within 30 days.
Sincerely,
/RA by RMartin/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
RAI cc w/encl: See next page
May 21, 2008 Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING THE REFUELING WATER STORAGE TANK LEVEL AMENDMENT (TAC NOS. MD5778 AND MD5779)
Dear Mr. Tynan:
By letter dated January 9, 2008, as supplemented by letters dated February 6, and March 5, 2008, Southern Nuclear Operating Company, Inc. (the licensee), submitted an application to change the nominal trip setpoint and corresponding allowable value of the refueling water storage tank (RWST) Level - Low Low at which the semi-automatic switchover from the RWST to the containment emergency sump occurs. The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal and has determined that additional information is required to complete its evaluation. This question was discussed by teleconference May 8, 2008, with members of your staff.
The NRC staffs RAI is enclosed. The licensee is required to provide a response to the RAI within 30 days.
Sincerely,
/RA by RMartin/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION:
Public RidsNrrDeEicb (KDesai)
LPL2-1 R/F RidsOgcRp RidsNrrLAMO=Brien (hard copy)
RidsNrrDsSsib (MScott)
RidsNrrPMRJervey (hard copy)
RidsAcrsAcnw&mMailCenter RidsNrrDorlLpl2-1 (MWong)
RidsNrrDorlDpr RidsRgn2MailCenter (SShaeffer)
Accession No. ML081350721 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME RJervey MO=Brien RMartin for MWong DATE 5/21/08 5/21/08 5/21/08 OFFICIAL RECORD COPY
Enclosure REQUEST FOR ADDITIONAL INFORMATION VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 REGARDING THE REFUELING WATER STORAGE TANK LEVEL AMENDMENT DOCKET NOS. 50-424 AND 50-425 Please discuss the impact of the proposed change in the RWST Low Low level setpoint on the time available for operator manual actions during Emergency Core Cooling System switchover to recirculation mode. Please provide the basis and assumptions (including, as applicable, conservatisms and margins) for conclusions regarding adequacy of the time available.
Vogtle Electric Generating Plant, Units 1 & 2 cc:
Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295 Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA 30085-1349 Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA 30308-2216 Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA 30830 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830