ML081350362
| ML081350362 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/28/2008 |
| From: | David Helker Exelon Generation Co, Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML081350362 (1) | |
Text
Exekln@
Exelon Nuclear www.exeloncorp.com 200 Exon WayNucear Kennett Square, PA 19348 TS 5.5.10.d April 28, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
Subject:
Submittal of Changes to Technical Specifications Bases In accordance with the requirement of Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Technical Specification 5.5.10.d, Exelon Generation Company, LLC, hereby submits a complete updated copy of the Unit 2 and Unit 3 Technical Specifications Bases. The enclosed Bases include changes through April 15, 2008.
If you have any questions or require further information, please contact Tom Loomis (610-765-5510).
Sincerely, David P. Helker Manager, Licensing & Regulatory Affairs Exelon Generation Company, LLC
Enclosures:
- 1) PBAPS Unit 2 Bases
F. Bower, USNRC Senior Resident Inspector, PBAPS (wo/enc)
J. Hughey, Project Manager, USNRC (w/enc)
R. I. McLean, State of Maryland (wo/enc)
R. R. Janati, Commonwealth of Pennsylvania (wo/enc) xoo/