IR 05000313-08-003 and 05000368-08-003, Arkansas Nuclear One, Units 1 and 2 - Notification of Inspection and Request for Information
ML081210484
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/30/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Mitchell T
Entergy Operations
References
IR-08-003
Download: ML081210484 (6)


See also: IR 05000313/2008003

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

April 30, 2008

Timothy G. Mitchell

Vice President Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000313/2008003 AND

05000368/2008003) AND REQUEST FOR INFORMATION

Dear Mr. Mitchell:

From June 2 - 13, 2008, reactor inspectors from U.S. Nuclear Regulatory Commission (NRC)

Region IV office will perform the baseline inspection of changes, tests, experiments, and

permanent plant modifications at Arkansas Nuclear One, Units 1 and 2, using NRC Inspection

Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent Plant

Modifications. Experience has shown that this inspection is resource intensive both for the

NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. Upon review of these documents, the inspectors will select additional

documentation for review upon arrival. It is important that all of these documents are up to date

and complete in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Dick Scheide of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Wayne Sifre, at (817) 860-8193 (Wayne.Sifre@nrc.gov).

-1- Enclosure

Arkansas Nuclear One -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-313; 50-368

Licenses: DPR-51; NPF-6

Enclosure:

IP 71111.17 Document Request

cc: w/enclosure

Senior Vice President

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President, Oversight

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Manager, Licensing

Entergy Operations, Inc.

Arkansas Nuclear One

1448 SR 333

Russellville, AR 72802

Associate General Counsel

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

-2- Enclosure

Arkansas Nuclear One -3-

Senior Manager, Nuclear Safety & Licensing

Entergy Operations, Inc.

1340 Echelon Parkway

Jackson, MS 39213-8298

Section Chief, Division of Health

Radiation Control Section

Arkansas Department of Health and

Human Services

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Section Chief, Division of Health

Emergency Management Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Pope County Judge

Pope County Courthouse

100 West Main Street

Russellville, AR 72801

-3- Enclosure

Arkansas Nuclear One -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Branch Chief, DRP/E (Jeffrey.Clark@nrc.gov)

Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

SUNSI Review Completed: ___Y__ ADAMS: 7 Yes Initials: __WS____

7 Publicly Available 7 Non-Sensitive

ML

SRI:EB1 C:EB1

WSifre/lmb RBywater

/RA/ /RA/

4/29/08 4/30/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

-4- Enclosure

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification.

Inspection Dates: June 2 - 13, 2008

Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors: W. Sifre, Senior Reactor Inspector

G. George, Reactor Inspector

S. Makor, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com preferred), in care of W. Sifre, by May 23, 2008, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection week. We ask that the

specific items requested be available and ready for review on the first day of inspection. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector(s), and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the inspector as soon as possible.

  • A list of all 50.59 screenings performed since June, 2005 which did not result in an

evaluation.

  • A list of all 10 CFR 50.59 evaluations performed which did not result in an application for

license amendment to NRC from June 2005 to the present. Note: Description of items to

be screened and evaluated should be brief, but of sufficient detail so that inspectors can

determine the significance of the issue.

evaluations.

  • A list of all Condition Reports (i.e., corrective action reports) related to 10 CFR 50.59

activities, including screenings and evaluations from June 2005 to the present.

  • A list of all permanent plant modifications dating from June 2005, with sufficient detail to

enable the inspector to determine the significance of each modification.

  • Arkansas Nuclear One procedure for implementing and controlling permanent plant

modifications.

-1- Enclosure

  • A list of all Condition Reports (i.e., corrective action reports) related to your permanent

plant modification program and its implementation since June 2005.

Inspector Contact Information:

W. Sifre G. George S. Makor

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-860-8193 817-276-6562 817-276-6507

Wayne.Sifre@nrc.gov Gerond.George@nrc.gov Shiattin.Makor@nrc.gov

Mailing Address:

US NRC Region IV

Attn: W. Sifre

612 E. Ryan Plaza Drive, Suite 400

Arlington, TX 76011-4125

-2- Enclosure