OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION April 23, 2008 Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CLINTON NUCLEAR GENERATING STATION SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT TEMPORARY INSTRUCTION INSPECTION

Dear Mr. Pardee:

In a telephone conversation on April 9, 2008, Mr. G. Mosley, B.5.b Project Manager, of your staff and Mr. B. Palagi, Senior Operations Engineer, of my staff made arrangements for the NRC to inspect the site specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Clinton Nuclear Generating Station. The inspection is planned for the week of May 19, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to the NRC by the week of May 5, 2008. Additionally, to facilitate the efficient conduct for this inspection, please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 2. Mr. G. Mosley has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.

Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

In order for your Clinton Nuclear Generating Station staff to understand the scope and level of detail that will be reviewed, we are providing a copy of the Temporary Inspection (TI) procedure that will be used to perform this inspection. This procedure, TI-2525/171, Verification of Site Specific Implementation of B.5.B Phase 2 & 3 Mitigating Strategies, dated 02/06/08, attached as Enclosure 3, contains Sensitive Unclassified Non-Safeguards Information.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 Public

Enclosures:

1.

Documentation Requested Prior to the Inspection

2.

Arrangements/Documents Requested to Be Available Onsite during the Inspection Week Nonpublic

Enclosure:

3.

Temporary Inspection 2515/171 See Attached Distribution

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION C. Pardee In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

In order for your Clinton Nuclear Generating Station staff to understand the scope and level of detail that will be reviewed, we are providing a copy of the Temporary Inspection (TI) procedure that will be used to perform this inspection. This procedure, TI-2525/171, Verification of Site Specific Implementation of B.5.B Phase 2 & 3 Mitigating Strategies, dated 02/06/08, attached as Enclosure 3, contains Sensitive Unclassified Non-Safeguards Information.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 Public

Enclosures:

1.

Documentation Requested Prior to the Inspection

2.

Arrangements/Documents Requested to Be Available Onsite during the Inspection Week Nonpublic

Enclosure:

3.

Temporary Inspection 2515/171 See Attached Distribution DOCUMENT NAME: G:\\DRS\\Work in Progress\\Ltr. 042308 CLI OL OUO RFI B5b - Cover Letter.doc To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME BPalagi:jb:co MRing AB for HPeterson DATE 04/23/08 04/23/08 04/23/08 OFFICIAL RECORD COPY

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Letter to Charles G. Pardee from Hironori Peterson dated April 23, 2008.

SUBJECT:

CLINTON NUCLEAR GENERATING STATION SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT TEMPORARY INSTRUCTION INSPECTION cc w/encl 1 & 2:

Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Chairman, Illinois Commerce Commission Illinois Emergency Management Agency cc w/encl 1, 2, and 3: J. Klinger, State Liaison Officer Illinois Emergency Management Agency

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Letter to Charles G. Pardee from Hironori Peterson dated April 23, 2008.

SUBJECT:

CLINTON NUCLEAR GENERATING STATION SITE SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT TEMPORARY INSTRUCTION INSPECTION cc w/encl 1 & 2:

Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Chairman, Illinois Commerce Commission Illinois Emergency Management Agency cc w/encl 1, 2, and 3: J. Klinger, State Liaison Officer Illinois Emergency Management Agency DISTRIBUTION w/encls 1 & 2:

TEB RAG1 SPS1 MMT RidsNrrDirsIrib MAS KGO JKH3 RML2 SRI Clinton CAA1 DRSIII DRPIII PLB1 TXN