MONTHYEARIR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont IR 05000271/20210022022-02-0808 February 2022 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report Nos. 05000271/2021002 and 07200059/2021001 IR 05000271/20210012021-08-10010 August 2021 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont - NRC Inspection Report No. 05000271/2021001 IR 05000271/20200022021-01-0606 January 2021 NRC Inspection Report Nos. 05000271/2020002 and 07200059/2020001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont IR 07200059/20204012020-10-21021 October 2020 Independent Spent Fuel Storage Installation Security Report 07200059/2020401 (Public) ML20189A5662020-07-0707 July 2020 NRC Inspection Report No. 05000271/20200001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont IR 05000271/20190022019-09-18018 September 2019 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont - NRC Inspection Report No. 05000271/2019002 IR 07200059/20184012018-11-20020 November 2018 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2018401 (Cover Letter Only - Public) IR 05000271/20180032018-10-17017 October 2018 NRC Inspection Report No. 05000271/2018003, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, Vermont IR 05000271/20180022018-07-12012 July 2018 Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, Vermont - NRC Inspection Report No. 05000271/2018002 IR 05000271/20180012018-04-19019 April 2018 NRC Inspection Report No. 05000271/2018001, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, Vermont IR 05000271/20174012017-12-20020 December 2017 Vernon, Vermont - (Entergy Nuclear Operations, Inc.) NRC Inspection Report No. 05000271/2017401 (Cover Letter) IR 05000271/20170032017-10-19019 October 2017 NRC Inspection Report No. 05000271/2017003, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20170022017-07-27027 July 2017 NRC Inspection Report No. 05000271/2017002, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20170012017-04-26026 April 2017 NRC Inspection Report No. 05000271/2017001, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20160042017-01-30030 January 2017 NRC Inspection Report No. 05000271/2016004, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20160032016-10-20020 October 2016 NRC Inspection Report No. 05000271/2016003, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, Vermont IR 05000271/20160022016-07-25025 July 2016 IR 05000271/2016002 on 4/11-14/16, 5/16-19/16, 6/11-30/16, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20160012016-05-0404 May 2016 IR 05000271/2016001, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT, and Exercise of Enforcement Discretion IR 05000271/20150102016-01-28028 January 2016 IR 05000271/2015010, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20150092015-10-22022 October 2015 IR 05000271/2015009 on 7/20-23/2015, 9/14-17/2015 and 9/30/2015, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20154032015-09-0101 September 2015 NRC Inspection Report No. 05000271/2015403, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Plant Vernon, Vermont IR 05000271/20150082015-07-30030 July 2015 IR 05000271/2015008 and 07200059/2015001 on 4/1/15 - 6/30/15, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT IR 05000271/20150072015-05-0808 May 2015 NRC Inspection Report No. 05000271/2015007, Energy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, Vermont IR 05000271/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Vermont Yankee Nuclear Power Station (Report 05000271/2014001) IR 05000271/20145012015-02-19019 February 2015 NRC Emergency Preparedness Annual Inspection Report No. 05000271/2014501; and NRC Security Annual Inspection Report No. 05000271/2014401 IR 05000271/20150012015-02-12012 February 2015 IR 05000271-15-001; on 01/01/2015 - 01/24/2015; Vermont Yankee Nuclear Power Station (Vermont Yankee); Surveillance Testing IR 05000271/20140052015-02-10010 February 2015 IR 05000271-14-005; 10/01/2014 - 12/31/2014; Vermont Yankee Nuclear Power Station (Vy); Fire Protection, Drill Evaluation, and Follow-up of Events and Notices of Enforcement Discretion IR 05000271/20140042014-10-27027 October 2014 IR 05000271-14-004; 07/01/2014 - 09/30/2014; Vermont Yankee Nuclear Power Station; Equipment Alignment, Plant Modifications, and Problem Identification and Resolution IR 05000271/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Vermont Yankee Nuclear Power Station (Report 05000271-14-006) IR 05000271/20140032014-08-0404 August 2014 IR 05000271-14-003; 04/01/2014 - 06/30/2014; Vermont Yankee Nuclear Power Station; Routine Integrated Inspection Report IR 05000271/20144032014-05-22022 May 2014 IR 05000271-14-403; 4/14/2014 - 4/17/2014; Vermont Yankee Nuclear Power Station; Access Control and Equipment Performance and Maintenance - Letter Only IR 05000271/20140072014-05-12012 May 2014 IR 05000271-14-007; 3/17/2014 - 4/03/2014; Vermont Yankee Nuclear Power Station; Component Design Bases Inspection IR 05000271/20140022014-05-0808 May 2014 IR 05000271-14-002; 01/01/2014 - 03/31/2014; Vermont Yankee Nuclear Power Station; Maintenance Effectiveness IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report IR 05000271/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Vermont Yankee Nuclear Power Station (Report 05000271/2013001)(w/Inspection Plan) IR 05000271/20130052014-02-0606 February 2014 IR 05000271-13-005; 10/01/2013 - 12/31/2013; Vermont Yankee Nuclear Power Station; Flood Protection Measures, Maintenance Risk Assessments and Emergent Work Control IR 05000271/20134032013-12-17017 December 2013 IR 05000271-13-403; 11/18/2013 to 11/21/2013; Vermont Yankee Nuclear Power Station; Baseline Security Inspection (Letter Only) IR 05000271/20134042013-11-0606 November 2013 IR 05000271/2013404; 9/23/13 to 9/25/13; Vermont Yankee Nuclear Power Station; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats Letter Only IR 05000271/20130042013-11-0505 November 2013 IR 05000271-13-004; 07/01/2013 - 09/30/2013; Vermont Yankee Nuclear Power Station; Maintenance Effectiveness, Occupational as Low as Is Reasonably Achievable Planning and Controls, Problem Identification and Resolution IR 05000271/20130072013-10-21021 October 2013 IR 05000271-13-007; September 9 to 27, 2013, Vermont Yankee Nuclear Power Station; Triennial Fire Protection Inspection IR 05000271/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Vermont Yankee Nuclear Power Station (Report 05000271-13-006) IR 05000271/20130032013-08-0909 August 2013 IR 05000271-13-003, 07200059-13-001; on 04/01/2013 - 06/30/2013; Vermont Yankee Nuclear Power Station; Adverse Weather Protection, Equipment Alignment, and Refueling and Other Outage Activities IR 05000271/20130082013-07-31031 July 2013 IR 05000271-13-008; Entergy Nuclear Operations, Inc; 06/10/2013 - 06/27/2013; Vermont Yankee Nuclear Power Station, Biennial Baseline Inspection of Problem Identification and Resolution IR 05000271/20135032013-07-15015 July 2013 IR 05000271-13-503 June 3-7, 2013, Vermont Yankee Nuclear Power Station, NRC Evaluated Emergency Preparedness Exercise IR 05000271/20130022013-04-19019 April 2013 IR 05000271-13-002; 01/01/2013 - 03/31/2013; Vermont Yankee Nuclear Power Station; Equipment Alignment, Plant Modifications, Problem Identification and Resolution and Other Activities 2023-08-15
[Table view] Category:Letter
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] |
See also: IR 05000271/2008402
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
April 23, 2008
Mr. Theodore A. Sullivan
Site Vice President
Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station
185 Old Ferry Road
P.O. Box 500
Brattleboro, VT 05302-0500
SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION - NRC PHYSICAL
SECURITY BASELINE INSPECTION REPORT 05000271/2008402;
PRELIMINARY GREATER THAN GREEN FINDING
Dear Mr. Sullivan:
On March 14, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security
baseline inspection at your Vermont Yankee Nuclear Power Station. The inspection covered
one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight
Process. The enclosed inspection report documents the inspection results, which were
discussed on March 14, 2008, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and
compliance with the Commission=s rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed
personnel.
Based on the results of this inspection, a finding was identified which was preliminarily
determined to be greater than very low safety significance (i.e., greater than Green as
determined by the Physical Protection Significance Determination process (PPSDP)). The
deficiency was identified by the licensee.
When separated from its Enclosure, this
document is DECONTROLLED.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
T. Sullivan 2
The deficiency was promptly corrected or compensated for, and the plant was in compliance
with applicable physical protection and security requirements within the scope of this inspection
before the inspectors left the site. The finding is also an apparent violation (AV) of NRC
requirements and is being considered for escalated enforcement action in accordance with the
Enforcement Policy, which can be found on the NRCs Web Site at http://www.nrc.gov/reading-
room/adams.html.
Before we make a final significance decision regarding the preliminary greater than Green
finding, we are providing you an opportunity (1) to attend a Regulatory Conference where you
can present to the NRC your perspective on the facts and assumptions the NRC used to arrive
at the finding and assess its significance, or (2) submit your position on the finding to the NRC in
writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of
this letter and we encourage you to submit supporting documentation at least one week prior to
the conference in an effort to make the conference more efficient and effective. If a Regulatory
Conference is held, it will be closed to public observation because it involves security sensitive
information. If you decide to submit only a written response, such submittal should be sent to
the NRC within 30 days of the receipt of this letter. If you decline a Regulatory Conference and
choose not to submit a written response, the NRC will proceed with its final determination.
Please contact Mr. James Trapp of my staff at (610) 337-5186 within 10 business days of the
date of your receipt of this letter to notify the NRC of your intentions. If we have not heard from
you within 10 days, we will continue with our significance determination decision.
You will be advised by separate correspondence of the results of our deliberations on this
matter. No response regarding the AV is required at this time. Since the NRC has not made a
final determination in this matter, no Notice of Violation is being issued for this inspection finding
at this time. In addition, please be advised that the number of apparent violations and/or the
characterization of the AV described in the enclosed inspection report may change as a result of
further NRC review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is
accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room). However, because of security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be
available for public inspection.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
T. Sullivan 3
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
response, if any. This practice will ensure that your response will not be made available
electronically for public inspection in the NRC Public Document Room or from the NRCs
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow
the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Marsha K. Gamberoni, Director
Division of Reactor Safety
Docket No. 50-271
License No. DPR-28
Enclosure: Inspection Report 05000271/2008402
w/Attachment: Supplemental Information (OUO-SRI)
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
T. Sullivan 3
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
response, if any. This practice will ensure that your response will not be made available
electronically for public inspection in the NRC Public Document Room or from the NRCs
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow
the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Marsha K. Gamberoni, Director
Division of Reactor Safety
Docket No. 50-271
License No. DPR-28
Enclosure: Inspection Report 05000271/2008402
w/Attachment: Supplemental Information (OUO)
SUNSI Review Complete: ___AXD_______ (Reviewer=s Initials) ADAMS ACCESSION NO. ML081150240
DOCUMENT NAME: G:\DRS\Plant Support Branch 1\Dimitriadis\2008 BI Vermont Yankee 3-14-08 Rev1.doc
After declaring this document AAn Official Agency Record@ letter will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS
NAME ADimitriadis/AXD* GSmith/GES* PFrechette/PRF* RPowell/NSS for WSchmidt/ WC for
DATE 04/15/08 04/16/08 04/16/08 04/16/08 04/16/08
OFFICE RI/DRS RI/ORA HQ/NSIR RI/DRP
NAME JTrapp RSummers/AED for RCorreia MGamberoni
DATE 04/18/08 04/21/08 04/18/08 04/23/08
OFFICIAL RECORD COPY
- See Previous Concurrence Page
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
4
cc w/encl; w/OUO:
P. Ryan, Security Manager, Vermont Yankee
D. O'Brien, Commissoner, Vermont Department of Public Service
C. Pope, State of New Hampshire, SLO
J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts
cc w/o encl; w/o OUO:
Vice President, Operations, Entergy Nuclear Operations
Senior Vice President, Entergy Nuclear Operations
Vice President, Oversight, Entergy Nuclear Operations
Senior Manager, Nuclear Safety & Licensing, Entergy Nuclear Operations
Senior Vice President and COO, Entergy Nuclear Operations
Assistant General Counsel, Entergy Nuclear Operations
Manager, Licensing, Entergy Nuclear Operations
G. Edwards
S. Lousteau, Treasury Department, Entergy Services, Inc.
D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire
W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health
Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP
G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau
J. Block, Esquire
J. P. Matteau, Executive Director, Windham Regional Commission
D. Katz, Citizens Awareness Network (CAN)
R. Shadis, New England Coalition Staff
G. Sachs, President/Staff Person, c/o Stopthesale
J. Volz, Chairman, Public Service Board, State of Vermont
Chairman, Board of Selectman, Town of Vernon
U. Vanags, State Nuclear Engineer, Vermont Department of Public Service
S. Shaw
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
5
Distribution w/o encl; w/o OUO: (via e-mail)
S. Collins, RA
M. Dapas, DRA
D. Lew, DRP
J. Clifford, DRP
R. Powell, DRP
B. Norris, DRP
N. Sieller, DRP
S. Williams, RI OEDO (Acting)
M. Kowal, NRR
B. Nelson, NRR
J. Lubinski, NRR
J. Kim, PM, NRR
J. Boska, Backup PM, NRR
B. Sienel, DRP, Resident Inspector
A. Rancourt, DRP, Resident OA
Region I Docket Room (with concurrences)
ROPreports@nrc.gov
M. Gamberoni, DRS
D. Roberts, DRS
J. Trapp, DRS
Distribution w/encl; w/OUO: (via e-mail)
R. Fernandes, SRI, Vermont Yankee
D. Riffle, NSIR
A. Dimitriadis, Senior Physical Security Inspector