TAC:MD4840, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications (Approved, Closed) |
|
MONTHYEARET 07-0040, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls2007-09-12012 September 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls Project stage: Response to RAI ET 07-0050, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls2007-10-16016 October 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls Project stage: Response to RAI ET 08-0005, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls2008-01-18018 January 2008 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls Project stage: Response to RAI ET 08-0011, Revisions to Proposed Changes to Technical Specification 3.7.3, Main Feedwater Isolation Valves (Mfivs)2008-02-26026 February 2008 Revisions to Proposed Changes to Technical Specification 3.7.3, Main Feedwater Isolation Valves (Mfivs) Project stage: Request ML0804500042008-02-29029 February 2008 Request for Withholding Information from Public Disclosure (10/8/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC) (Tac No. MD4840) Project stage: Withholding Request Acceptance ML0804500102008-02-29029 February 2008 Request for Withholding Information from Public Disclosure (1/7/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC) (Tac MD4840) Project stage: Withholding Request Acceptance ML0806502192008-03-21021 March 2008 License Amendment 176 Replacement of Main Stream and Feedwater Isolation Valves Project stage: Approval ML0803701172008-04-0303 April 2008 Issuance of License Amendment No. 177, Revise TS 3.3.2, ESFAS and TS 3.7.3, Main Feedwater Isolation Valves by Addition of Main Feedwater Regulating Valves and Associated Bypass Valves Project stage: Approval ML0803701212008-04-0303 April 2008 Tech Spec Pages for Amendment No. 177, Revise TS 3.3.2, ESFAS and TS 3.7.3, Main Feedwater Isolation Valves by Addition of Main Feedwater Regulating Valves and Associated Bypass Valves Project stage: Other ML0811201492008-04-29029 April 2008 Corrected Technical Specification Pages, Amendment No. 177 Revision to Technical Specification 3.7.3, Main Feedwater Isolation Valves, to Add Main Feedwater Regulating Valves and MFRV Bypass Valves Project stage: Other ML0810702772008-04-29029 April 2008 Correction to Amendment No. 177 Revision to Technical Specification 3.7.3, Main Feedwater Isolation Valves, to Add Main Feedwater Regulating Valves (MFRV) and MFRV Bypass Valves Project stage: Other 2008-02-26
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] |
Text
April 29, 2008 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK GENERATING STATION - CORRECTION TO AMENDMENT NO. 177 RE: REVISION TO TECHNICAL SPECIFICATION 3.7.3, "MAIN FEEDWATER ISOLATION VALVES," TO ADD MAIN FEEDWATER REGULATING VALVES (MFRV) AND MFRV BYPASS VALVES (TAC NO. MD4840)
Dear Mr. Muench:
In our letter to you dated April 3, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 177 to Facility Operating License No. NPF-42 for the Wolf Creek Generating Station. The amendment consisted of changes to the Technical Specifications (TS), in response to your application dated March 14, 2007 (ET 07-0004), as supplemented by letters dated December 18, 2006, and February 26, 2008 (ET 07-0052 and ET 08-0011, respectively).
Inadvertently, in the amendment, the NRC staff issued incorrect pages for (1) the attachment to License Amendment No. 177 showing the pages to be removed and inserted, where TS page 3.3-34 was not listed; (2) revised TS page 3.7-8, where the acronym "MFIS" is stated in the Applicability instead of the abbreviation "MFIV "; and (3) revised TS page 3.7-11, where two Surveillance Requirements (SRs) 3.7.3.2 are shown. Although TS page 3.3-34 was not listed in the attachment to the amendment, the page and its overleaf page were enclosed in the TS pages to be inserted for this amendment. For TS pages 3.7-8 and 3.7-11, the proposed pages in the application gave the abbreviation "MFIV", and listed SRs 3.7.3.2 and 3.7.3.3 and not two SRs 3.7.3.2, respectively.
Enclosed is a new attachment to License Amendment No. 177 that lists TS page 3.3-34, and contains the TS page 3.3-34 and corrected TS pages 3.7-8 and 3.7-11, and their overleaf pages. We apologize for any problems caused by this mistake.
Sincerely,
/RA/
Jack N. Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-482
Enclosure:
As stated cc w/encl: See next page
Pkg ML081120143, Letter ML081070277, TS Pages ML081120149 OFFICE NRR/LPL4/PM NRR/LPL4/LA OGC NRR/LPL4/BC NAME JDonohew JBurkhardt MSmith THiltz DATE 4/22/08 4/21/08 04/25/08 4/29/08 Wolf Creek Generating Station (2/2006) cc:
Jay Silberg, Esq. Chief, Radiation and Asbestos Control Pillsbury Winthrop Shaw Pittman LLP Section 2300 N Street, NW Kansas Department of Health Washington, D.C. 20037 and Environment Bureau of Air and Radiation Regional Administrator, Region IV 1000 SW Jackson, Suite 310 U.S. Nuclear Regulatory Commission Topeka, KS 66612-1366 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation Senior Resident Inspector P.O. Box 411 U.S. Nuclear Regulatory Commission Burlington, KS 66839 P.O. Box 311 Burlington, KS 66839 Supervisor Licensing Wolf Creek Nuclear Operating Corporation Chief Engineer, Utilities Division P.O. Box 411 Kansas Corporation Commission Burlington, KS 66839 1500 SW Arrowhead Road Topeka, KS 66604-4027 U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant Office of the Governor 8201 NRC Road State of Kansas Steedman, MO 65077-1032 Topeka, KS 66612 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839
ATTACHMENT TO LICENSE AMENDMENT NO. 177 FACILITY OPERATING LICENSE NO. NPF-42 DOCKET NO. 50-482 Replace the following pages of the Facility Operating License No. NPF-42 and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. The corresponding overleaf pages are provided to maintain document completeness.
Facility Operating License REMOVE INSERT Technical Specifications (TSs)
REMOVE INSERT iii iii 3.3-34 3.3-34 3.7-8 3.7-8 3.3-9 3.7-9 3.7-10 3.7-10 3.7-11 to 3.7-41 3.7-11 to 3.7-42*
- These pages are being issued to re-number the pages from TSs 3.7.4 through 3.7.18 since TS 3.7.3 is being issued with an additional page. The only changes to TSs 3.7.4 through 3.7.18 are to the page numbers. See the changes to page iii above of the Table of Contents.