Letter Sequence Request |
---|
|
|
MONTHYEARML0809503712008-04-0404 April 2008 Surry, North Anna, Millstone and Kewaunee, Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients; Response to Request for Additional Information Project stage: Request ML0829709142008-11-10010 November 2008 Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. Project stage: Other 2008-11-10
[Table View] |
Surry, North Anna, Millstone and Kewaunee, Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients; Response to Request for Additional InformationML080950371 |
Person / Time |
---|
Site: |
Millstone, Kewaunee, Surry, North Anna |
---|
Issue date: |
04/04/2008 |
---|
From: |
Bischof G T Dominion, Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO) |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
07-0268A, GL-07-001 |
Download: ML080950371 (3) |
|
|
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change 2024-02-06
[Table view] |
Text
Dominion Resources Services, Inc.')(J(J(J Dominion Boulevard, Glen Allen, VA:')r 1(" i\X'ch Address: www.dom.com April 4, 2008.,--, DOlllinion Attn: Document Control Desk United States Nuclear Regulatory Commission Washington,D.C.20555-0001SerialNo.NL&OSITJSDocketNos.
License Nos.07-0268A RO 50-280,281 50-338,339 50-336,423 50-305 DPR-32,37 NPF-4,7 DPR-65 NPF-49 DPR-43 VIRGINIA ELECTRIC AND POWER COMPANY DOMINION NUCLEAR CONNECTICUT, INC.DOMINION ENERGY KEWAUNEE, INC.SURRY POWER STATIONUNITS1AND2 NORTH ANNA POWER STATIONUNITS1AND2 MILLSTONE POWER STATIONUNITS2AND3 KEWAUNEE POWER STATION GENERIC LETTER 2007-01, INACCESSIBLE OR UNDERGROUND POWER CABLE FAILURES THAT DISABLE ACCIDENT MITIGATION SYSTEMS OR CAUSE PLANT TRANSIENTS; RESPONSE TO REQUEST FOR ADDITIONAL INFORMATIONOnMay 7,2007, Virginia ElectricandPowerCompany, Dominion Nuclear Connecticut,Inc.and DominionEnergyKewaunee,Inc.(collectively, Dominion)provided a responsetoNRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation SystemsorCausePlant Transients, issued February 7, 2007.That response was prepared in accordancewiththe Nuclear Energy Institute(NEI)March 16,2007 industry letter (Guidance for ResponsetoGL 2007-01).TheNRC provided additional guidanceonhowto determinewhichcable failureswerewithinthescopeofthe generic letterinanNRC lettertoNEIdatedApril13,2007.
On January16,2008,theNRC forwarded by electronicmaila Request for Additional Information (RAI)concerningourGL2007-01response.TheNRC specifically requested: "Confirmthatthehistorywaspreparedin accordancewithNRC guidance.If Dominion's responsetoGL2007-01excludedcable failuresbasedontheNEI guidance(i.e.,not followingtheNRC quidance),providethedatafor these failures as requestedinGL 2007-01."
SerialNo.07-0268ADocketNos.
50-280/281,338/339, 336/423, 305Page2of3AsrequestedbytheabovereferencedRAI,DominionconfirmsthatourMay7,2007responsetoGL2007-01(SerialNo.07-0268)waspreparedin accordancewiththeNEI guidanceandislikewise consistentwiththeguidance subsequentlyissuedbyNRCletterdatedApril13,2007fromM.
J.Case(NRC)to J.H.Riley(NEI).No additionaldegradedcableshavebeenidentified.
Please contactMr.David A.Sommersat(804)273-2823ifyouhaveany questions or require additional information.
Sincerely, Vice President-Nuclear EngineeringVirginiaElectricandPowerCompany Dominion NuclearConnecticut,Inc.DominionEnergyKewaunee,Inc.
COMMONWEALTHOFVIRGINIACOUNTYOFHENRICOTheforegoing documentwasacknowledgedbeforeme,inandfortheCountyand Commonwealthaforesaid,todaybyGerald 1.Bischof,whoisVicePresident-NuclearEngineeringofVirginiaElectricandPowerCompany,DominionNuclearConnecticut,Inc.andDominionEnergyKewaunee,Inc.Hehasaffirmedbeforemethatheisdulyauthorizedtoexecuteandfiletheforegoing documentinbehalfoftheseCompanies,andthatthestatementsinthedocumentaretruetothebestofhisknowledgeandbelief.
IJ}l1Acknowledgedbeforemethis f=day of>,-;/j?l/'/,2008.*1 ,MyCommissionExpires:
II (At 2/;s2()I:.../;(':'J:;.;(JILti£Attachments:
NoneNotaryPublic Commitmentsmadeinthisletter:Nonecc:U.S.NuclearRegulatoryCommissionRegionI 475 Allendale RoadKingofPrussia,PA19406-1415U.S.NuclearRegulatoryCommissionRegionIISamNunnAtlantaFederalCenter61ForsythStreet,S.W.,Suite23T85Atlanta,GA30303-8931 VICKIL.HULL Notary PublICCommonwealth of VIrginial.au 1_CommllllOn Ixplfel May S1.2010 SerialNo.07
-0268A Docket Nos.50-280/281, 338/339, 336/423, 305Page3of3U.S.NuclearRegulatoryCommissionRegionIII 2443 WarrenvilleRoad,Suite210Lisle,IL 60532-4352 NRC Senior Resident InspectorSurryPowerStation NRC Senior Resident InspectorNorthAnnaPowerStation NRC Senior Resident InspectorMillstonePowerStationUnits2and3 NRC Senior Resident InspectorKewauneePowerStationMr.J.D.HugheyNRCProject ManagerMillstoneUnits2and3U.S.NuclearRegulatoryCommission,MailStopOWFN 08-83 One WhiteFlintNorth11555RockvillePikeRockville,MD 20852-2738Mr.S.P.LingamNRCProject Manager SurryU.S.NuclearRegulatoryCommission,MailStopOWFN 08-G9A One WhiteFlintNorth11555RockvillePikeRockville,MD 20852-2738Mr.R.A.JerveyNRCProject ManagerNorthAnnaU.S.NuclearRegulatoryCommission,MailStopOWFN 08-G9A One WhiteFlintNorth11555RockvillePikeRockville,MD 20852-2738Ms.M.H.Chernoff NRC SeniorProjectManagerKewauneeU.S.NuclearRegulatoryCommission,MailStopOWFN08-H4A11555RockvillePikeRockville,MD 20852-2738