MONTHYEARML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23244A2142023-09-0101 September 2023 IAEA Osart Report ML23068A1962023-03-0909 March 2023 Biennial 50.59 Evaluation Report ML23135A2012022-12-0606 December 2022 EQSD-I, Rev 18, Equipment Qualification Design Basis Document ML23135A1932022-09-0101 September 2022 EQSD-II, Rev 34, Equipment Qualification Summary Document WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ML22152A2042022-05-18018 May 2022 EQSD-I, Revision 16, Equipment Qualification Design Basis Document ML22152A1992022-05-18018 May 2022 EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) ML22152A1942022-05-18018 May 2022 EQSD-I, Revision 15, Equipment Qualification Design Basis Document ML23135A2072022-04-0606 April 2022 EQSD-I, Rev 17, Equipment Qualification Design Basis Document ML20290A6192020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, EQSD-I, Rev. 14, Equipment Qualification Design Basis Document ML20182A4292020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II)2020-01-15015 January 2020 Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) ML19330F8632019-12-0606 December 2019 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, ML19178A3392019-07-0909 July 2019 Staff Assessment of Aging Management Program and Inspection Plan of Reactor Vessel Internals ML19092A1562018-09-18018 September 2018 EQSD-I, Rev 14 ML18093B0112018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Classification Design Basis Document, EQSD-I Rev 13 ML18093B0132018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Qualification Summary Document, EQSD-II, Rev 30, Redacted WO 19-0010, EQSD-II, Rev 312018-02-19019 February 2018 EQSD-II, Rev 31 ML18023A1572018-01-18018 January 2018 Submittal of Blind Sample Error Investigation Report ML17241A2512017-11-0808 November 2017 Staff Assessment of Flooding Focused Evaluation ML17234A4002017-08-17017 August 2017 Summary of Changes to Three Forms That Implement Radiological Emergency Response Plan (RERP) ML17093A6652017-03-27027 March 2017 Report on Financial Protection Levels ML17151B0452017-03-0909 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - Redacted ML17151B0442017-03-0202 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 1 ML17072A0512017-03-0202 March 2017 Biennial 50.59 Evaluation Report for 01/01/2015 - 12/31/2016 ML17151B0432017-01-26026 January 2017 Equipment Qualification Design Basis Document, EQSD-I, Rev 11 ML17054C2302017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays ET 17-0005, 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS2016-12-15015 December 2016 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document.2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. ML16204A1802016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. WM 16-0008, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted2016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted ML15314A6572015-11-0404 November 2015 Submittal of 10 CFR 50.46 Thirty Day Report of Emergency Core Cooling System (ECCS) Model Changes ML17151B0392015-10-26026 October 2015 E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation ET 16-0003, Flood Hazard Reevaluation Report, Revision 12015-10-21021 October 2015 Flood Hazard Reevaluation Report, Revision 1 ML15216A3202015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights ML15075A0282015-03-0404 March 2015 Biennial 50.59 Evaluation Report ML15062A2752015-02-24024 February 2015 Pressure and Temperature Limits Report, Revision 2 ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology WO 14-0095, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-23023 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request 2024-09-04
[Table view] Category:Miscellaneous
MONTHYEARML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23068A1962023-03-0909 March 2023 Biennial 50.59 Evaluation Report WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating ML20182A4292020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II)2020-01-15015 January 2020 Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) ML19330F8632019-12-0606 December 2019 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, ML18023A1572018-01-18018 January 2018 Submittal of Blind Sample Error Investigation Report ML17234A4002017-08-17017 August 2017 Summary of Changes to Three Forms That Implement Radiological Emergency Response Plan (RERP) ML17093A6652017-03-27027 March 2017 Report on Financial Protection Levels ET 17-0005, 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS2016-12-15015 December 2016 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS ML15314A6572015-11-0404 November 2015 Submittal of 10 CFR 50.46 Thirty Day Report of Emergency Core Cooling System (ECCS) Model Changes ET 16-0003, Flood Hazard Reevaluation Report, Revision 12015-10-21021 October 2015 Flood Hazard Reevaluation Report, Revision 1 ML15216A3202015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights ML15075A0282015-03-0404 March 2015 Biennial 50.59 Evaluation Report ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology WO 14-0095, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-23023 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14136A1712014-05-30030 May 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14077A2812014-02-10010 February 2014 Operating Corporation Flood Hazard Reevaluation Report,Revision 0 ML1307206802013-03-0404 March 2013 Cycle 20 Core Operating Limits Report ET 12-0032, WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-1 Through Page B-502012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-1 Through Page B-50 ML12342A2502012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-51 Through Page B-100 ML12342A2512012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-101 Through Page B-150 ML12342A2532012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Cover Through Appendix a, Seismic Walkdown Checklists (Swcs) Page A-112 ML12342A2542012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-151 Through Page B-184 ML12342A2552012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-185 Through Page B-228 ML12342A2572012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix C, Licensing Basis Evaluations Summary, Page C-1 Through End ML12342A2592012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-113 Through Page A-222 ML12342A2602012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-223 Through Page A-320 ML12342A2612012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-321 Through Page A-350 ML12342A2622012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-348 Through Page A-440 ML12100A0762012-03-26026 March 2012 Foreign Ownership, Control or Influence Information - Updated Lists of Owners, Officers, Directors and Executive Personnel ML11133A3482011-05-0808 May 2011 Great Plains Energy, Inc. and Kansas Electric Power Cooperative, Inc. - Item 8. Financial Statemnts and Supplemental Data ML11279A0052011-03-31031 March 2011 John Redmond Reservoir Diversion and Impacts to Downstream Conditions: System Simulation Modeling ML1107500302011-03-10010 March 2011 Biennial 50.59 Evaluation Report ML1023501702010-09-15015 September 2010 Review of the Results of 16th Steam Generator Tube Inservice Inspections Performed During Refueling Outage 17 ML0917607642009-06-24024 June 2009 Phase 3 Potential Loss of RHR Due to Inadequate Cooling of Suction Line During Mode 4 to Mode 3 Transition at Wolf Creek ET 09-0010, Pressure and Temperature Limits Report, Revision 12009-03-0606 March 2009 Pressure and Temperature Limits Report, Revision 1 ET 09-0005, Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-29029 January 2009 Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification 2024-09-04
[Table view] |
Text
Enclosure XIII to ET 08-0014 WCNOC Operation Plan, Rev. I
ALS Class 1E Controls Operation Plan ADVANCED LOGIC SYSTEM (ALS)
CLASS 1E CONTROLS OPERATION PLAN REVISION 1 PROJECT MANAGER - GREGG CLARKSON MANAGEMENT SPONSOR PATRICK GUEVEL EXECUTIVE SPONSOR TERRY GARRETT Wolf Creek Nuclear Operating Corporation PO Box 411 1550 Oxen Lane, NE Burlington, KS 66839 Revision I 2/5/2008 Page 1 of 6
ALS Class IE Controls Operation Plan Revision Control Rev # Approval Approval Date Description of Change(s) 0 GWC 5/29/2007 Initial Revision 1 GWC 2/5/2008 Document overhaul for generic application at Wolf Creek for ALS Class IE Controls. Added revision table. Added more specific wording for security requirements and referenced Regulatory Guide 1.152.
Revision I 2/5/2008 Page 2 of 6
ALS Class 1E Controls Operation Plan Table of Content R EVISIO N 1 ............... ........................... ................... ........ ...... ........ .............. ............................ 1 1 Operations Plan .................................................................................................................... 4 1.1 Roles and Responsibilities.................................................................................................. 4 1.1.1 WCNOC............................................................................................................ 4 1.1.2 Class lBE Controls Supplier....................................................................................... 4 1.2 Security Requirements..................................................................................................... 4 1.2.1 Physical Security.................................................................................................. 4 1.2.2 Cyber Security..................................................................................................... 4 1.3 Implementation Characteristics .............................. ............................................................. 5 1.4 Procedures .................................................................................................................. 6 1.5 References .................................................................................................................. 6 1.5.1 Regulatory Guide 1.152 - "Criteria for Digital Computers in Safety Systems of Nuclear Power Plants............................................................................................................... 6 Revision 1 2/5/2008 Page 3 of 6
ALS Class 1E Controls Operation Plan 1 Operations Plan The purpose of the Operation Plan is to identify the roles and responsibilities of operating the ALS Class lE Controls equipment, identify the security requirements for the equipment, and address operational procedures required for the operation of the equipment.
1.1 Roles and Responsibilities The following sections outline the roles and responsibilities for the operation of the ALS Class 1E Controls:
1.1.1 WCNOC WCNOC is the system owner and is ultimately responsible for the successful operation of the ALS Class 1E Controls. The WCNOC Operations Department has direct responsibility for operating the plant equipment.
The WCNOC Maintenance Department and System Engineering Group have ownership of the equipment to ensure it is operating and maintained properly.
1.1.2 Class 1E Controls Supplier The Class lE Controls Supplier is responsible for fulfilling Part 21 of IOCFR50, Appendix B. The Class 1E Controls Supplier is also responsible for delivery of the installation, operation, and maintenance manual.
The installation, operation, and maintenance manual shall be incorporated into the WCNOC Documentation Controls system via the WCNOC Change Package process.
1.2 Security Requirements This section discusses both the physical security and the cyber security of the ALS Class 1E Controls. This section shall serve as the documentation of the security requirements as identified in Regulatory Guide 1.152 - "Criteria for Digital Computers in Safety Systems of Nuclear Power Plants".
1.2.1 Physical Security The ALS Class 1E Controls equipment shall be located in the Control Building, specifically, the Main Control Equipment Room. This room is secured by the plant security system, which only allows authorized personnel into the area. If the particular application required installation of the ALS Class lE Controls equipment is outside the Main Control Equipment Room, a revised Operation Plan shall be required.
1.2.2 Cyber Security The ALS Class 1E Controls Equipment shall not be permanently connected to either the corporate network of the Plant Process Computer. The ALS Class 1E Controls equipment provides the ability for the maintenance personnel to connect via a laptop computer for the purposes of diagnostics and troubleshooting. The ALS Class 1E Controls shall indicate this connection to the control room via the annunciator system. The ALS Class lE Controls does not provide a data transmission mechanism to allow communications between applications or functions. Therefore, there is no concern for the propagation of Revision I 2/5/2008 Page 4 of 6
ALS Class I E Controls Operation Plan errors within and between functions for the ALS Class 1E Controls. In addition there are no concerns regarding cyber security as the ALS Class 1E Controls equipment is not connected to either the corporate network or the Plant Process Computer network.
The ALS Class 1E Controls equipment provides the ability for the maintenance personnel to connect via a laptop computer for the purposes of diagnostics and troubleshooting. The laptop computer cannot change the ALS Class 1E Controls equipment logic or configuration. If a particular application of the ALS Class 1E Controls equipment required this capability, a revised Operation Plan shall be required.
1.3 Implementation Characteristics The ALS Class 1E Controls are to be located in the existing cabinets for the particular system being replaced. All operator information is available on the front-panel of the control racks. Controls and indicators shall be clearly labeled and grouped and show the state of the system for efficient evaluation of system status by the operator. Figure 1-1 below provides an example of the front plate of an ALS Class 1E Controls rack, this example provides the view of the front panel of the MSIV controls rack for the MSFIS application.
b.ýtý =ta MW "4'- S.'.
- WV "'4a "44- M KIM' 0' S.
- 0 MVM'4~4V 0 0~ ____ ____
9 0
"-'7'-'-- N-IN-' lI Figure 1-1: Front Panel View of the MSIV Controls Rack for MSFIS 2/51200X Page 5 of 6 Revision 1I 2/5/2009 Page 5 of 6
ALS Class IE Controls Operation Plan 1.4 Procedures All procedures required for operation of ALS Class 1E Controls shall be generated or existing procedures revised as a part of the WCNOC Plant Modification Process. There are several aspects of the equipment operation that were implemented to limit the impact on the changes required in the existing operation procedures.
1.5 References 1.5.1 Regulatory Guide 1.152 - "Criteria for Digital Computers in Safety Systems of Nuclear Power Plants" Revision 1 2/5/2008 Page 6 of 6
Enclosure XVI to ET 08-0014 WCNOC Affidavit for Withholding Proprietary Information from Public Disclosure
AFFIDAVIT STATE OF KANSAS )) s COUNTY OF COFFEY )
Before me, the undersigned authority, personally appeared Terry J. Garrett, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Wolf Creek Nuclear Operating Corporation (WCNOC), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:
Terry J. Garrett Vice President Engineering Sworn to and subscribed before me this L' day of Febru a ( ,2008 S& GAYLE SHEPHEARD)
Notary Public ptate- of KansaJ My Mpt. Expir~ Q / 1, 0 Notary blic 1
(1) I am Vice President Engineering, Wolf Creek Nuclear Operating Corporation (WCNOC),
and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in WCNOC's submittal of the WCNOC MSFIS D3 Assessment, Rev.1, and the WCNOC ALS Architecture Evaluation, Rev. 0, and am authorized to apply for its withholding on behalf of WCNOC.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with WCNOC letter ET 08-0014 which includes the WCNOC MSFIS D3 Assessment, Rev.1, and the WCNOC ALS Architecture Evaluation, Rev. 0. accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by WCNOC in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by WCNOC.
(ii) The information is of a type customarily held in confidence by other organizations and not customarily disclosed to the public. Based on a review of 10 CFR 2.390, the information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any other company without license :from WCNOC constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by another company would reduce its expenditure of resources or improve its competitive position in the design, assurance of quality, or licensing a similar product.
(d) It is not the property of WCNOC, but must be treated as proprietary by WCNOC according to agreements with the owners of the information.
There are sound reasons behind the WCNOC position which include the following:
(a) It is information which is marketable in many ways.
2
(b) Use by other companies would put WCNOC at a competitive disadvantage by reducing their expenditure of resources at our expense.
(c) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If other companies acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving WCNOC of a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is the WCNOC MSFIS D3 Assessment, Rev.1, and the WCNOC ALS Architecture Evaluation, Rev. 0.
The subject information could only be duplicated by competitors if they were to invest time and effort equivalent to that invested by WCNOC provided they have the requisite talent and experience.
Public disclosure of this information is likely to cause substantial harm to the competitive position of WCNOC because it would simplify design and evaluation tasks without requiring a commensurate investment of time and effort.
3