MONTHYEARML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23244A2142023-09-0101 September 2023 IAEA Osart Report ML23068A1962023-03-0909 March 2023 Biennial 50.59 Evaluation Report ML23135A2012022-12-0606 December 2022 EQSD-I, Rev 18, Equipment Qualification Design Basis Document ML23135A1932022-09-0101 September 2022 EQSD-II, Rev 34, Equipment Qualification Summary Document WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report2022-08-29029 August 2022 Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report ML22152A2042022-05-18018 May 2022 EQSD-I, Revision 16, Equipment Qualification Design Basis Document ML22152A1992022-05-18018 May 2022 EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) ML22152A1942022-05-18018 May 2022 EQSD-I, Revision 15, Equipment Qualification Design Basis Document ML23135A2072022-04-0606 April 2022 EQSD-I, Rev 17, Equipment Qualification Design Basis Document ML20290A6192020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, EQSD-I, Rev. 14, Equipment Qualification Design Basis Document ML20182A4292020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II)2020-01-15015 January 2020 Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) ML19330F8632019-12-0606 December 2019 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, ML19178A3392019-07-0909 July 2019 Staff Assessment of Aging Management Program and Inspection Plan of Reactor Vessel Internals ML19092A1562018-09-18018 September 2018 EQSD-I, Rev 14 ML18093B0112018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Classification Design Basis Document, EQSD-I Rev 13 ML18093B0132018-03-0808 March 2018 Revision 31 to Updated Safety Analysis Report, Equipment Qualification Summary Document, EQSD-II, Rev 30, Redacted WO 19-0010, EQSD-II, Rev 312018-02-19019 February 2018 EQSD-II, Rev 31 ML18023A1572018-01-18018 January 2018 Submittal of Blind Sample Error Investigation Report ML17241A2512017-11-0808 November 2017 Staff Assessment of Flooding Focused Evaluation ML17234A4002017-08-17017 August 2017 Summary of Changes to Three Forms That Implement Radiological Emergency Response Plan (RERP) ML17093A6652017-03-27027 March 2017 Report on Financial Protection Levels ML17151B0452017-03-0909 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - Redacted ML17151B0442017-03-0202 March 2017 Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 1 ML17072A0512017-03-0202 March 2017 Biennial 50.59 Evaluation Report for 01/01/2015 - 12/31/2016 ML17151B0432017-01-26026 January 2017 Equipment Qualification Design Basis Document, EQSD-I, Rev 11 ML17054C2302017-01-17017 January 2017 License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays ET 17-0005, 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS2016-12-15015 December 2016 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document.2016-05-31031 May 2016 Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. ML16204A1802016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-I, Revision 9, Equipment Qualification Design Basis Document. WM 16-0008, Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted2016-05-31031 May 2016 Redacted Version of Revision 29 to Updated Safety Analysis Report, EQSD-II, Revision 27 Redacted ML15314A6572015-11-0404 November 2015 Submittal of 10 CFR 50.46 Thirty Day Report of Emergency Core Cooling System (ECCS) Model Changes ML17151B0392015-10-26026 October 2015 E-1F9915, Rev 8, Design Basis Document for Ofn RP-017, Control Room Evaluation ET 16-0003, Flood Hazard Reevaluation Report, Revision 12015-10-21021 October 2015 Flood Hazard Reevaluation Report, Revision 1 ML15216A3202015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights ML15075A0282015-03-0404 March 2015 Biennial 50.59 Evaluation Report ML15062A2752015-02-24024 February 2015 Pressure and Temperature Limits Report, Revision 2 ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology WO 14-0095, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-23023 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 ML14189A4982014-06-19019 June 2014 Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request 2024-09-04
[Table view] Category:Miscellaneous
MONTHYEARML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23068A1962023-03-0909 March 2023 Biennial 50.59 Evaluation Report WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating2020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating ML20182A4292020-06-30030 June 2020 Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating WO 20-0041, Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II)2020-01-15015 January 2020 Rev. 32 to Equipment Qualification Summary Document-II (EQSD-II) ML19330F8632019-12-0606 December 2019 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation, ML18023A1572018-01-18018 January 2018 Submittal of Blind Sample Error Investigation Report ML17234A4002017-08-17017 August 2017 Summary of Changes to Three Forms That Implement Radiological Emergency Response Plan (RERP) ML17093A6652017-03-27027 March 2017 Report on Financial Protection Levels ET 17-0005, 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS2016-12-15015 December 2016 16C4405-RPT-002, Revision 0, Seismic High Frequency Confirmation for WCGS ML15314A6572015-11-0404 November 2015 Submittal of 10 CFR 50.46 Thirty Day Report of Emergency Core Cooling System (ECCS) Model Changes ET 16-0003, Flood Hazard Reevaluation Report, Revision 12015-10-21021 October 2015 Flood Hazard Reevaluation Report, Revision 1 ML15216A3202015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights ML15075A0282015-03-0404 March 2015 Biennial 50.59 Evaluation Report ET 15-0002, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology2015-01-21021 January 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, for Large Break Loss-of-Coolant (LOCA) Analysis Methodology WO 14-0095, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-12-23023 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML14189A5432014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14189A5312014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 ML14189A5332014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 ML14189A5372014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 ML14189A5002014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 52014-06-19019 June 2014 Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 5 of 5 ML14136A1712014-05-30030 May 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14077A2812014-02-10010 February 2014 Operating Corporation Flood Hazard Reevaluation Report,Revision 0 ML1307206802013-03-0404 March 2013 Cycle 20 Core Operating Limits Report ET 12-0032, WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-1 Through Page B-502012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-1 Through Page B-50 ML12342A2502012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-51 Through Page B-100 ML12342A2512012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-101 Through Page B-150 ML12342A2532012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Cover Through Appendix a, Seismic Walkdown Checklists (Swcs) Page A-112 ML12342A2542012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-151 Through Page B-184 ML12342A2552012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix B, Area Walk-by Checklists (Awcs), Page B-185 Through Page B-228 ML12342A2572012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix C, Licensing Basis Evaluations Summary, Page C-1 Through End ML12342A2592012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-113 Through Page A-222 ML12342A2602012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-223 Through Page A-320 ML12342A2612012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-321 Through Page A-350 ML12342A2622012-11-30030 November 2012 WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-348 Through Page A-440 ML12100A0762012-03-26026 March 2012 Foreign Ownership, Control or Influence Information - Updated Lists of Owners, Officers, Directors and Executive Personnel ML11133A3482011-05-0808 May 2011 Great Plains Energy, Inc. and Kansas Electric Power Cooperative, Inc. - Item 8. Financial Statemnts and Supplemental Data ML11279A0052011-03-31031 March 2011 John Redmond Reservoir Diversion and Impacts to Downstream Conditions: System Simulation Modeling ML1107500302011-03-10010 March 2011 Biennial 50.59 Evaluation Report ML1023501702010-09-15015 September 2010 Review of the Results of 16th Steam Generator Tube Inservice Inspections Performed During Refueling Outage 17 ML0917607642009-06-24024 June 2009 Phase 3 Potential Loss of RHR Due to Inadequate Cooling of Suction Line During Mode 4 to Mode 3 Transition at Wolf Creek ET 09-0010, Pressure and Temperature Limits Report, Revision 12009-03-0606 March 2009 Pressure and Temperature Limits Report, Revision 1 ET 09-0005, Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-29029 January 2009 Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification 2024-09-04
[Table view] |
Text
Enclosure XII to ET 08-0014 WCNOC ALS Architecture Evaluation, Rev.0, Non-Proprietary
ALS Class lE Controls: ALS Architecture Evaluation ADVANCED LOGIC SYSTEM (ALS)
CLASS 1E CONTROLS ALS ARCHITECTURE EVALUATION REVISION 0 PROJECT MANAGER - GREGG CLARKSON MANAGEMENT SPONSOR - PATRICK GUEVEL EXECUTIVE SPONSOR - TERRY GARRETT Wolf Creek Nuclear Operating Corporation PO Box 411 1550 Oxen Lane, NE Burlington, KS 66839 Revision 0 2/25/2008 Page 1 of 11
ALS Class I E Controls: ALS Architecture Evaluation Revision Control 0Rev Approval 2 Date IAppiroal iDescription of Change(s)'
0 GWC 2/25/2008 Initial Revision 2/25/2008 Page 2 of II Revision 0 2/25/2008 Page 2 of I I
ALS Class 1E Controls: ALS Architecture Evaluation Table of Content R EV I S I O N 0 ............................................................................................................................................................................. I I P u rp o se a n d S c op e ............................................................................................................................................................. 4 1 .1 P u rp o se ..................................................................................................................................................................... 4 1.2 S c o p e of E v a lu a tio n ................................................................................................................................................. 4 1 .3 Re fe ren c e s ................................................................................................................................................................ 6 1.3.1 W CNO C, J-105A(Q), ""Replacem ent M SFIS System". ....................................................................... 6 1.3.2 [ ] c,d .................................................................................................................................................. 6 1.3.3 CS Innovations, 6101-00000, "M SFIS Level 0 Specification ........................................................... 6 1.3.4 CS Innovations, 6101-00002, "M SFIS System Specification". .............................................................. 6 2 A LS Architecture Evaluation and Deliverables ............................................................................................................ 7 2.1 7 2.2 A LS Architecture for the M SFIS replacem ent ..................................................................................................... 7 2.3 A LS Equipm ent Deliverables .................................................................................................................................. 8 2.4 A LS Draw ing and Docum entation Deliverables ................................................................................................ 9 2.5 A LS Design Docum ents .......................................................................................................................................... 10 2 .5.1 [ ] c.. .................................................................................................................................................... 10 2.5.2 CS Innovations, 6101-00000, "M SFIS Level 0 Specification ................................................................ 11 2.5.3 CS InnoVations, 6101-00002, "M SFIS System Specification". ............................................................ 11 2.6 Conclusion of Evaluation ............................................................................................................................... ....... 11 Revision 0 2/25/2008 Page 3 of I I
ALS Class I E Controls: ALS Architecture Evaluation 1I Purpose andScope ~ i~2J 1 i.1i~.i:
1.1 Purpose The purpose of this document is to evaluate the ALS architecture for use at WCGS. The ALS will initially be installed as a replacement for the existing MSFIS controls. This evaluation will focus on this particular replacement, but also serve as a generic evaluation for modifications going forward.
1.2 Scope of Evaluation As stated in the purpose this evaluation is focused on the MSFIS Controls replacement modification, but also serves as a generic evaluation of the ALS for use at WCGS.
The scope of the MSFIS modification as defined by J-105A(Q) "Replacement MSFIS System" is to replace the existing controls with a control system based on the Advanced Logic System (ALS) technology.
The MSFIS Controls Replacement Project replaces the existing safety related electronic MSFIS with a hardware-based system to perform the control functions of the MSIVs and MFIVs. The replacement MSFIS will be installed in conjunction with replacement of the existing electro-pneumatic-hydraulic MSIVs and MFIVs by new MSIVs and MFIVs with system-medium actuators. The MSFIS controls, existing and replacement, have two redundant subsystems located in separate cabinets:
MSFIS Channel 1 (1) located in MSFIS Cabinet SA075A MSFIS Channel IV (4) located in MSFIS Cabinet SA075B The replacement project will retain the existing cabinets, external power supply feeds, and channel separation scheme in the overall plant configuration. The replacement project will include changes to the functions by which the replacement MSFIS controls the replacement MSIVs and MFIVs. These changes account for the differences in the function of the existing and replacement MSIVs and MFIVs. That is, electro-pneumatic-hydraulic actuators replaced by system-medium actuators.
The replacement project will implement a new digital control system, new power supplies, new assembly panels, and new vendor wiring. The replacement project will retain, without modifications, the existing cabinets including mechanical structures used to mount racks and components and field-wiring and terminal blocks within the cabinets.
The replacement project will modify the functionality of the current MSFIS per J-105A (Q) Rev. 2 requirements.
[1] This will include changes to the functions by which the replacement MSFIS controls the replacement MSIVs and MFIVs. These changes account for the differences in the function of the existing and replacement MSIVs and MFIVs. That is, electro-pneumatic-hydraulic actuators replaced by system-medium actuators. The replacement project will not re-use existing electronic boards, sub-racks, interconnecting wiring/cables, fuse blocks, circuit breakers, test panels, switches, indicators, power supplies, actuation relays, assembly panels, and so on, nor will the replacement project include the actual installation of the replacement MSFIS components in the MSFIS cabinets, the new system-medium MSIV / MFIV actuators, or any of the field cables.
After replacement, each cabinet will contain the following components:
Revision 0 2/25/2008 Page 4 of I1I
ALS Class I E Controls: ALS Architecture Evaluation c,d In summary, the replacement project will provide a complete set of MSFIS controls which can be installed in existing racks, replacing the existing control-system.-An overview of the replacement MSFIS can be seen in Figure 1 below.
2/25/2008 Page 5 of II Revision 00 Revision 2/25/2008 Page 5 of I11
ALS Class IL Controls: ALS Architecture Evaluation c,d 1.3 References 1.3.1 WCNOC, J-105A(Q), "Replacement MSFIS System" 1.3.2 [ c,d 1.3.3 CS Innovations, 6101-00000, "MSFIS Level 0 Specification" 1.3.4 CS Innovations, 6101-00002, "MSFIS System Specification" Revision 0 2/25/2008 Page 6 of I I
ALS Class I E Controls: ALS Architecture Evaluation 2 ALS Architectu.re valuatio'n and Deliverables K' c,d 2.1 2.2 ALS Architecture for the MSFIS replacement The ALS architecture provides the correct solution for the replacement of the MSFIS Controls at WCGS. In addition to the overall aspects discussed in section 2.1, the ALS provides the proper interface for the MSFIS Controls. The table below shows the I/O interface for the MSFIS Controls at WCGS., This I/O interface meets the requirements for the replacement MSFIS Controls at WCGS. The solenoid interface provides additional functionality and eliminates the requirement for an interposing contactor for switching the large solenoids located on the actuators. c,d 2/25/2008 Page 7 of 11 Revision 0 2/25/2008 Page 7 of I I
ALS Class I E Controls: ALS Architecture Evaluation c,d 2.3 ALS Equipment Deliverables The following is a list of equipment deliverables for the MSFIS Controls replacement. This list of deliverable items meets the requirements as stated in J-105A(Q) specification.
Item Description CSI Part #
WC-MSFIS, Ms ALS Rack 5101-100 WC-MSFIS, MF ALS Rack 5101-101 Assembly Panel, SA075A 4101-036 WC-MSFIS Cable, C1M1 4101-020 WC-MSFIS Cable, C1F1 4101-020 WC-MSFIS Cable, C1M2 4101-024 Revision 0 2/25/2008 Page 8 of]11
ALS Class IE Controls: ALS Architecture Evaluation WC-MSFIS Cable, CIF2 4101-024 WC-MSFIS Cable, C1M3 4101-028 WC-MSFIS Cable, CIF3 4101-028 WC-MSFIS Cable, C1M4 4101-032 WC-MSFIS Cable, CIF4 4101-032 Assembly Panel, SA075B 4101-038 WC-MSFIS Cable, C4M1 4101-022 WC-MSFIS Cable, C4F1 4101-022 WC-MSFIS Cable, C4M2 4101-026 WC-MSFIS Cable, C4F2 4101-026 WC-MSFIS Cable, C4M3 4101-030 WC-MSFIS Cable, C4F3 4101-030 WC-MSFIS Cable, C4M4 4101-034 WC-MSFIS Cable, C4F4 4101-034 Rack Level Equipment ALS-101, ALS Board, Core Logic Board 5101-007 ALS-201, ALS Board, Service & Test 5101-008 Board ALS-301-1, ALS Board, Input Board 5101-010 ALS-301-2, ALS Board, Input Board 5101-011 ALS-401-1, ALS Board, Output Board 5101-012 ALS-411-1, ALS Board, Output Board 5101-001 ALS-411-2, ALS Board, Output Board 5101-002 ALS-411-3, ALS Board, Output Board 5101-003 ALS-905, ALS Board, Power Supply Unit 5101-009 2.4 ALS Drawing and Documentation Deliverables The following is a list of drawing and documentation deliverables for the MSFIS Controls replacement. This list of deliverable items meets the requirements as stated in J-105A(Q) specification.
CSI Part # Item Description 4101-008 Bill of Material and Assembly Drawing, ALS Backpanel, MSFIS 4101-007 Schematic, Backpanel, MSFIS 5101-007 ALS- 101, ALS Daughter Card, CLB 4101-010 Bill of Material and Assembly Drawing, ALS-10l 4101-009 Schematic, ALS-l01 5101-008 ALS-201, ALS Daughter Card, STB 4101-012 Bill of Material and Assembly Drawing, ALS-201 4101-011 Schematic, ALS-201 4101-018 Bill of Material and Assembly Drawing, ALS-201 Bypass Switch Board 4101-017 Schematic, ALS-201 Bypass Switch Daughterboard 5101-010 ALS-301- 1, ALS Daughter Card, IPB 4101-004 Bill of Material and Assembly Drawing, ALS-301 4101-003 Schematic, ALS-301 5101-011 ALS 301-2, ALS Daughter Card, IPB Revision 0 2/25/2008 Page 9 of I11
ALS Class I E Controls: ALS Architecture Evaluation 4101-004 Bill of Material and Assembly Drawing, ALS-301 4101-003 Schematic, ALS-301 5101-012 ALS-401-1, ALS Daughter Card, OPB 4101-006 Bill of Material and Assembly Drawing, ALS-401 4101-005 Schematic, ALS-401 5101-001 ALS-411 - 1, ALS Daughter Card, FSB 4101-002 Bill of Material and Assembly Drawing, ALS-411 4101-001 Schematic, ALS-411 5101-002 ALS-411-2, ALS Daughter Card, FSB 4101-002 Bill of Material and Assembly Drawing, ALS-411 4101-001 Schematic, ALS-411 5101-003 ALS-411-3, ALS Daughter Card, FSB 4101-002 Bill of Material and Assembly Drawing, ALS-411 4101-001 Schematic, ALS-411 5101-009 ALS-905, ALS Daughter Card, PSU 4101-014 Bill of Material and Assembly Drawing, ALS-905 4101-013 Schematic, ALS-905 4101-035 Drawing, Assembly Panel, SA075A 4101-036 Bill of Material and Wirelist, Assembly Panel, SA075A 4101-037 Drawing, Assembly Panel, SA075B 4101-038 Bill of Material and Wirelist, Assembly Panel, SA075B 4101-049 Drawing, SA075A, Vendor wiring 4101-050 Drawing, SA075B, Vendor wiring 4101-019 / 4101-021 Drawing, WC MSFIS Cable, Cxxi (MS/MF) 4101-020 / 4101-022 Bill of Material and Wirelist, WC MSFIS Cable, Cxxi 4101-023 / 4101-025 Drawing, WC MSFIS Cable, Cxx2 4101-024 / 4101-026 Bill of Material and Wirelist, WC MSFIS Cable, Cxx2 4101-027 / 4101-029 Drawing, WC MSFIS Cable, Cxx3 4101-028 / 4101-030 Bill of Material and Wirelist, WC MSFIS Cable, Cxx3 4101-031 / 4101-033 Drawing, WC MSFIS Cable, Cxx4 4101-032 / 4101-034 Bill of Material and Wirelist, WC MSFIS Cable, Cxx4 4101-065 Drawing, MSFIS Logic Overview 4101-061 Drawing, SA075A MS One Line Diagram 4101-062 Drawing, SA075A FW One Line Diagram 4101-063 Drawing, SA075B MS One Line Diagram 4101-064 Drawing, SA075B FW One Line Diagram 2.5 ALS Design Documents The following design documents were reviewed to ensure the ALS architecture design is found acceptable for use at WCGS.
c,d
.5.1 I cd 2/25/2008 Page lOoflI Revision 00 2/25/2008 Page 10 of I1I
ALS Class IE Controls: ALS Architecture Evaluation 2.5.2 CS Innovations, 6101-00000, "MSFIS Level 0 Specification" This document provides the Conceptual Design of the Main Steam Feedwater Isolation System (MSFIS) controls replacement project for Wolf Creek Generating Station. The conceptual design is the initial look at what the MSFIS Controls replacement looks like using the ALS.
2.5.3 CS Innovations, 6101-00002, "MSFIS System Specification" This document addresses the overall system specifications of the replacement system for the safety related Main Steam and Feedwater Isolation System (MSFIS) controls for Wolf Creek Generating Station (WCGS). The document provides an overall description of the replacement MSFIS based on the Advanced Logic System (ALS)
The document addresses the overall MSFIS implementation, as well as the specification for the cabinet content and detailed specification of the assembly panel.
2.6 Conclusion of Evaluation The ALS architecture is found to be acceptable for use as MSFIS Controls replacement as well as a generic safety related controls platform at WCGS. This evaluation is based on the final acceptance by WCNOC of the CS Innovations documentation, drawings, and actual equipment as discussed in this document.