ML080930486

From kanterella
Jump to navigation Jump to search
TMI, Unit 1 License Renewal Request for Protected Species Letter to C. Urban, Fish and Boat Commission
ML080930486
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/15/2008
From: Louise Lund
NRC/NRR/ADRO/DLR
To: Urban C
State of PA, Fish & Boat Commission
Lopas, S, DLR/REBA - 415-1147
References
Download: ML080930486 (10)


Text

April 15, 2008 Mr. Christopher Urban Chief of Natural Diversity Section Pennsylvania Fish and Boat Commission 450 Robinson Lane Bellefonte, PA 16823-9620

SUBJECT:

REQUEST FOR LIST OF STATE-PROTECTED SPECIES WITHIN THE AREA UNDER EVALUATION FOR THE THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION REVIEW

Dear Mr. Urban:

The U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing an application submitted by AmerGen Energy Company, LLC (AmerGen), for the renewal of the operating license for Three Mile Island Nuclear Station, Unit 1 (TMI-1). TMI-1 is located on Three Mile Island, which is situated in the Susquehanna River, in Londonderry Township of Dauphin County, Pennsylvania, about 2.5 miles north of the southern tip of Dauphin County. As part of the review of the license renewal application (LRA), the NRC is preparing a Supplemental Environmental Impact Statement (SEIS) under the provisions of Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51), the NRCs regulation that implements the National Environmental Policy Act (NEPA) of 1969. The SEIS includes an analysis of pertinent environmental issues, including endangered or threatened species and impacts to fish and wildlife.

AmerGen is requesting renewal of its operating license for TMI-1 for a period of 20 years beyond the expiration of the current license term of April 2014. The proposed action would include the use and continued maintenance of existing plant facilities and transmission lines.

For the purpose of license renewal, AmerGen plans to replace the TMI-1 steam generators, and estimates that the total area disturbed by construction, decontamination, and laydown activities would be less than 10 acres, all of which would be previously disturbed property within the bounds of the TMI-1 flood protection dike.

The TMI-1 site encompasses several properties that total approximately 440 acres, including:

the physical plant location on 200 acres of the 370-acre Three Mile Island; St. Johns Island and Evergreen Island (also referred to as Sand Beach Island), together totaling 31 acres; a 6.4-acre section of Shelley Island, which is part of the western half of the TMI-1 Exclusion Area; and a 32-acre strip of land east of Three Mile Island along the eastern shore of the Susquehanna River; please see the enclosed site boundary map. The TMI-1 site is surrounded by fencing and contains few areas of undeveloped or undisturbed land; undeveloped land on Three Mile Island lies south of TMI-1 facilities. The majority of this land lies under the ten-year flood level, and contains wetlands and fallow field areas surrounded by a woodland buffer. Riparian buffer areas are intact around the perimeter of the island, although forested riparian areas only occur on the southern part of the island.

C. Urban TMI-1 utilizes two hyperbolic natural draft cooling towers for dissipating heat from the plant steam cycle. The circulating water and service water systems withdraw water from the Susquehanna River, and are supplemented by three groundwater wells. TMI-1 has a permit with the Susquehanna River Basin Commission for consumptive use of river water up to 18 million gallons per day, on a monthly average, for electric generation. River water enters the intake structure located on the western bank of the island, passes under a skimmer wall, through automated trash racks with 1-inch vertical bar spacing, through 3/8-inch-mesh traveling screens, through the river water pumps, and finally through 1/8-inch-mesh strainers before entering the heat exchangers. Approximately 3000 gallons per minute of cooling tower blowdown are discharged to the Susquehanna River through a 48-inch-diameter river discharge line.

Four 230-kilovolt (kV) transmission lines totaling 5.6 miles of corridor and approximately 142 acres connect TMI-1 to the regional transmission system; please see the enclosed TMI-1 transmission system map. Two of these lines connect the plant with the substation at Middletown Junction, east of the Susquehanna River; each of these lines extends 1.5 miles. A third line extends for 4.1 miles to the west side of the Susquehanna River, where it connects to a 230-kV line terminating into the substation near Jackson - this line crosses the river twice.

The fourth line extends 0.7 miles east across the Susquehanna River to the TMI-1 500-kV substation.

To support the SEIS preparation process and to ensure compliance with Section 7 of the Endangered Species Act, the NRC requests information on state-listed, proposed, and candidate species and critical habitat that may be in the vicinity of TMI-1 and its associated transmission line corridors. Please see the enclosed Species Impact Review (SIR) request form.

The NRC staff plans to hold two public NEPA scoping meetings on May 1, 2008. The first session will be held in the afternoon and an identical session will be held later that evening. The afternoon session will be held at the Elks Movie Theatre, 4 West Emaus Street, Middletown, PA 17057. The evening session will be held at Londonderry Elementary School, 260 Schoolhouse Road, Middletown, PA 17057. The first meeting will convene at 1:30 p.m. and will continue until 4:30 p.m., as necessary. The second meeting will convene at 7:00 p.m. and will continue until 10:00 p.m., as necessary. In addition, during the week of April 28, 2008, the NRC plans to conduct a site audit. You and your staff are invited to attend both the public meetings and the site audit. Your office will receive a copy of the draft SEIS along with a request for comments.

The anticipated publication date for the draft SEIS is December 2008.

C. Urban If you have any questions concerning the NRC staffs review of this license renewal application, please contact Ms. Sarah Lopas, License Renewal Project Manager, at 301-415-1147 or sll2@nrc.gov.

Sincerely,

/RA/

Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Nuclear Reactor Regulation Docket No. 50-289 cc w/encls: See next page

C. Urban If you have any questions concerning the NRC staffs review of this license renewal application, please contact Ms. Sarah Lopas, License Renewal Project Manager, at 301-415-1147 or sll2@nrc.gov.

Sincerely, Louise Lund, Branch Chief Projects Branch 1 Division of License Renewal Nuclear Reactor Regulation Docket No. 50-289 cc w/encls: See next page DISTRIBUTION: See next page Accession No.: ML080930486 OFFICE LA:DLR PM:DLR:RPB1 BC:DLR:RPB1 NAME SFigueroa SLopas LLund DATE 04/14/08 04/14/08 04/15/08 OFFICIAL RECORD COPY

FISH AND BOAT COMMISSION NATURAL DIVERSITY SECTION PFBC-DES-NDS-1 (5/2/03) SPECIES IMPACT REVIEW (SIR) REQUEST FORM COMMONWEALTH A. This form provides the site information necessary to perform a computer database search for species of special concern listed under the Endangered Species Act of 1973, the Wild Resource Conservation Act, the Pennsylvania Fish and Boat Code or the Wildlife Code.

B. Use only one form for each proposed project or location. Complete the information below and mail form to:

OF PENNSYLVANIA Natural Diversity Section Division of Environmental Services PA Fish and Boat Commission 450 Robinson Lane Bellefonte, PA 16823 Fax: (814) 359-5175 C. This form, a cover letter including a project narrative, and accompanying maps should be sent to the above address for environmental reviews that only concern reptiles, amphibians, fishes and aquatic invertebrates. Reviews for other natural resources must be submitted to other appropriate agencies.

D. The absence of recorded information from our databases and files does not necessarily imply actual conditions on site.

Future field investigations could alter this determination. The information contained in our files is routinely updated. A review is valid for one year.

E. Please send us only one (1) copy of your request - either by fax or by mail - not both. Mail is preferred to improve legibility of maps. Facsimile submission will not improve our response turn-around time.

F. Allow 30 days for completion of the review from the date of PFBC receipt. Large projects and workload may extend this review timeframe.

G. In any future correspondence with us following your receipt of the SIR response, please refer to the assigned SIR number at the top left of our cover letter.

H. FORMS THAT ARE NOT COMPLETED IN FULL WILL NOT BE REVIEWED.

PLEASE PRINT OR TYPE: If available, provide the potential conflict PNDI Search Number: N/A PFBC response should be sent to Company/Agency: U.S. Nuclear Regulatory Commission Form Preparer: Sarah Lopas, License Renewal Project Manager Address: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Mail Stop O-11F1, Rockville, MD 20852 Phone (8:00 AM to 4:00 PM): 301.415.1147 Project

Description:

Three Mile Island Nuclear Station, Unit 1, License Renewal (please see cover letter)

Indicate if the project is: Transportation or Non-transportation X (check one)

Will the proposed project encroach directly or indirectly (e.g., runoff) upon wetlands or waterways? Circle one for each:

Wetlands: Yes No UNKNOWN Waterways: YES No Unknown County: Dauphin Township/Municipality: Londonderry Name of the United States Geological Survey (U.S.G.S.) 7.5 Minute Quadrangle Map where project is located: Middletown Project size (in acres): Approximately 276 Attach an 8.5" by 11" photocopy (DO NOT REDUCE) of the section of the U.S.G.S. Quadrangle Map which identifies the project location. On this map, indicate the location of the project center (if linear, depict both ends) and outline the approximate boundaries of the project area. Specify latitude/longitude of the project center.

Latitude: 40° /9.2 N.

Longitude: 72° /43.5 W FOR PFBC USE ONLY SIR# Quad Name Data Source Search Result-Potential Species Conflict Action

Letter to C. Urban from L. Lund, April 15, 2008 DISTRIBUTION:

SUBJECT:

REQUEST FOR LIST OF STATE-PROTECTED SPECIES WITHIN THE AREA UNDER EVALUATION FOR THE THREE MILE ISLAND NUCLEAR STATION UNIT 1, LICENSE RENEWAL APPLICATION REVIEW HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RdsNrrDlrRer1 RidsNrrDlrRer2 RidsNrrDlrRerb RidsOgcMailCenter


DWrona SLopas MModes, RI DKern JBrand RConte RBellamy PBamford MMcLaughlin

Three Mile Island Nuclear Station, Unit 1 cc:

Site Vice President - Three Mile Island Director Nuclear Station, Unit 1 Bureau of Radiation Protection AmerGen Energy Company, LLC Pennsylvania Department of P. O. Box 480 Environmental Protection Middletown, PA 17057 Rachel Carson State Office Building P.O. Box 8469 Senior Vice President - Operations, Harrisburg, PA 17105-8469 Mid-Atlantic AmerGen Energy Company, LLC Plant Manager - Three Mile Island Nuclear 200 Exelon Way, KSA 3-N Station, Unit 1 Kennett Square, PA 19348 AmerGen Energy Company, LLC P. O. Box 480 Vice President - Licensing and Regulatory Middletown, PA 17057 Affairs AmerGen Energy Company, LLC Regulatory Assurance Manager - Three 4300 Winfield Road Mile Island Nuclear Station, Unit 1 Warrenville, IL 60555 AmerGen Energy Company, LLC P.O. Box 480 Regional Administrator Middletown, PA 17057 Region I U.S. Nuclear Regulatory Commission Ronald Bellamy, Region I 475 Allendale Road U.S. Nuclear Regulatory Commission King of Prussia, PA 19406 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners Ronnie Gardner, PMP of Dauphin County Manager, Site Operations and Corporate Dauphin County Courthouse Regulatory Affairs Harrisburg, PA 17120 AREVA NP Inc.

3315 Old Forest Road OF-16 Chairman Lynchburg, VA 24501 Board of Supervisors of Londonderry Township Dr. Judith Johnsrud R.D. #1, Geyers Church Road National Energy Committee Middletown, PA 17057 Sierra Club 433 Orlando Avenue Senior Resident Inspector (TMI-1) State College, PA 16803 U.S. Nuclear Regulatory Commission P.O. Box 219 Eric Epstein Middletown, PA 17057 TMI Alert 4100 Hillsdale Road Director - Licensing and Regulatory Affairs Harrisburg, PA 17112 AmerGen Energy Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348

Three Mile Island Nuclear Station, Unit 1 cc:

Correspondence Control Desk Albert A. Fulvio, Senior Project Manager AmerGen Energy Company, LLC License Renewal 200 Exelon Way, KSA 1-N-1 Exelon Nuclear Kennett Square, PA 19348 200 Exelon Way Kennett Square, PA 19348 Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Rich Janati, Chief Exelon Generation Company, LLC Division of Nuclear Safety Correspondence Control Bureau of Radiation Protection P.O. Box 160 Pennsylvania Department of Kennett Square, PA 19348 Environmental Protection Rachel Carson State Office Building Christopher M. Crane P.O. Box 8469 President and Chief Executive Officer Harrisburg, PA 17105-8469 AmerGen Energy Company, LLC 4300 Winfield Road Michael Murphy Warrenville, IL 60555 Bureau of Radiation Protection Pennsylvania Department of Mr. Charles G. Pardee Environmental Protection Chief Nuclear Officer Rachel Carson State Office Building AmerGen Energy Company, LLC P.O. Box 8469 200 Exelon Way Harrisburg, PA 17105-8469 Kennett Square, PA 19348 Michael G. Brownell, Chief Associate General Counsel Water Resources Management AmerGen Energy Company, LLC Susquehanna River Basin Commission 4300 Winfield Road 1721 N. Front Street Warrenville, IL 60555 Harrisburg, PA 17102 Chief Operating Officer (COO) Rachel Diamond, Regional Director AmerGen Energy Company, LLC Southcentral Regional Office 4300 Winfield Road Pennsylvania Department of Warrenville, IL 60555 Environmental Protection 909 Elmerton Avenue Senior Vice President - Operations Support Harrisburg, PA 17110 AmerGen Energy Company, LLC 4300 Winfield Road Nancy Ranck Warrenville, IL 60555 Environmental Lend, License Renewal Exelon Nuclear Frederick W. Polaski 200 Exelon Way, KSA/2-E Manager License Renewal Kennett Square, PA 19348 Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348

Three Mile Island Nuclear Station, Unit 1 cc:

Christopher Wilson KSQ License Renewal Exelon Nuclear 200 Exelon Way, KSA/2-E Kennett Square, PA 19348 Mr. Michael P. Gallagher Vice President License Renewal Projects AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348